Title: Integrating Detailing and Engineering: A Mechanical Design Builders Approach
1Integrating Detailing and EngineeringA
Mechanical Design Builders Approach
Victor Sanvido, Michael McLaughlin, Scott Muxen,
George Benoit September 2004
2Presentation Outline
- Integrating the Design Build Process
- Healthcare Case Study
- Design Assist Integration
- Design Detail Build Integration
- Design Detail Build Benefits
3Integrating the Design Build Process Process
Theory
Gaps
Traditional Design Bid Build (Plan Spec)
Gaps
Conventional Design Assist/Design Build
Design - Detail - Build
Complete, Fully Engineered Coordinated
Constructible Cost Effective, Innovative
Design Meets Project Quality, Performance, Budget
and Schedule Requirements
Design Start
4Healthcare Case Study
- 257,000 sq.ft Acute Care Hospital
- Emergency Department, Operating Suite, Imaging,
Diagnostic Test, In-Patient Facilities - Design Build HVAC Ductwork, Piping, Plumbing,
Medical Gas Systems Fire Protection
5Design Assist Integration (Engineer already
engaged by Project Team)
Pre-construction Roles Responsibilities
- Contractor Design Assistance
- Design Specification Review
- Value Analysis / Options
- Construct-ability Review / Spot Detailing
- Preliminary Trade Coordination
- Cost Feedback (Estimating Services)
- Engineer - Construction Documents
- Performance Criteria, Code Compliance
- Calculations
- Equipment Selections
- Smart Drafted Floor Plans
- Flow/Riser Diagrams
- Smart Details
- Smart Specifications
6Design Assist Process
PRE-CONSTRUCTION
CONSTRUCTION
Plan Check
Permit
Backcheck 1
1
2
5
6
3
4
Final Estimate
95 Estimate
30 Estimate
60 Estimate
- Pricing, Options Value Analysis
- Design Team Engineering
- Spot Detailing (Constructability Review)
- Construction/ Fabrication Detailing
- Trade Coordination
- Construction
7Design Assist Process Challenges
PRE-CONSTRUCTION
CONSTRUCTION
Plan Check
Permit
Backcheck 1
1
2
5
6
3
4
Final Estimate
95 Estimate
30 Estimate
60 Estimate
- Gaps in Information Hand-off
- Multiple Drawing Sets for Review by City,
Inspectors, Owner - Deferred Drawing Packages (Seismic Anchoring,
Fire Protection, Shop Drawings) - Increased Risk of Construction RFIs and Change
Orders
8Design Build Integration (In-House Design Build
Team engaged by Project Team)
Pre-construction Roles Responsibilities
-
- Right Size Calculations
- Sweet Spot Equipment Selections
- Constructible Details
- Applicable Specifications
- Integrated Design / Cost Control
- Performance Criteria, Code Compliance
- Smart Drafted Floor Plans
- Smart Design Coordination
- Flow/Riser Diagrams
9Design Detail Build Process
PRE-CONSTRUCTION
CONSTRUCTION
Plan Check
Permit
Backcheck 1
1
2
6
5
3
4
- Pricing, Options Value Analysis
- Design Team Engineering
- Design Team Detailing Integration
- Construction / Fabrication Detailing
- Integral Trade Coordination
- Construction
Single Set of Documents Engineering Documents
with Detailed Floor Plans
10Design Assist
PRE-CONSTRUCTION
CONSTRUCTION
Plan Check
Permit
Backcheck 1
1
2
5
6
3
4
PRE-CONSTRUCTION
CONSTRUCTION
Plan Check
Permit
Backcheck 1
1
2
6
5
3
4
11Pricing, Options and Value Engineering
1.
PRE-CONSTRUCTION
CONSTRUCTION
Plan Check
Permit
Backcheck 1
Backcheck 2
1
2
5
6
5
3
4
95 Estimate
Final Estimate
30 Estimate
60 Estimate
- Performance Criteria Review
- Load Calculations Review
- Optimization of Central Plant
- Right Sizing Routing of Systems
- Specification Review
- Trade Coordination Review
12Engineering Team Responsibilities
2.
PRE-CONSTRUCTION
CONSTRUCTION
Plan Check
Permit
Backcheck 1
Backcheck 2
1
2
5
6
5
3
4
Final Estimate
95 Estimate
60 Estimate
30 Estimate
- Core Engineering Activities - Performance
Criteria, Code Analysis, Calculations, System
Sizing, Equipment Selection, etc. - Redlines of System Routing with Sizing
- Lead Specification Preparation
- Lead Coordination with Design Team Members
(Architect, Structural) - Facilitate Coordination with other Trades
(Electrical, Pneumatic Tube, Fire Protection,
Plumbing)
13Integration of Detailing Team
3.
PRE-CONSTRUCTION
CONSTRUCTION
Plan Check
Permit
Backcheck 1
Backcheck 2
1
2
5
6
5
3
4
Final Estimate
95 Estimate
60 Estimate
30 Estimate
- Relocate Key Players into Project Area
- Integrate Engineering and Detailing CAD Systems
- Identify Project Goals with Team
- Recognize Optimized Use of Resources
- Identify Team Roles Responsibilities
14Construction/Fabrication Detailing
4.
CONSTRUCTION
PRE-CONSTRUCTION
Plan Check
Permit
Backcheck 1
Backcheck 2
1
2
5
6
5
3
4
Final Estimate
95 Estimate
30 Estimate
60 Estimate
- Phase I Pre Plan Check
- Convert Engineering Redlines into Finished 3D
Floor Plans for Plan Check - Dimension Elevate all Systems
- Fully Coordinate with all Trades
- Seismic Anchoring Package Complete
- Phase II Post Plan Check (Construction)
- Add Fabrication/ Construction Information (spool
sheets, CNC download data, etc) - Incorporate Procured Equipment Shop Drawings
- Add Foremen Requested Information
- Final Trade Coordination
15Integral Trade Coordination
5.
PRE-CONSTRUCTION
CONSTRUCTION
Plan Check
Permit
Backcheck 1
Backcheck 2
1
2
5
6
5
4
3
Final Estimate
95 Estimate
30 Estimate
60 Estimate
- Trade coordination occurs during design phase
with actual detailing information, real dimension
and routing - Detailers have direct influence on design
development - prior to plan check review or
Issue for Construction rigidity
- Significant reduction of costly construction
administration (RFI, change orders, schedule
impacts, etc.) - Real time coordination using 3D CAD models
- Seamless design and coordination information
- Full trade impact evaluation of design changes
16Construction
6.
PRE-CONSTRUCTION
CONSTRUCTION
Plan Check
Permit
Backcheck 1
Backcheck 2
1
2
6
5
4
3
Final Estimate
95 Estimate
30 Estimate
60 Estimate
- Construction starts with complete, fully
engineered, coordinated constructiblecost
effective, innovative design.Meets project
quality, performance, budget and schedule
requirements
- Specialty Contractors in position to pull General
Construction, rather than traditional push method.
17Estimating
7.
PRE-CONSTRUCTION
CONSTRUCTION
Plan Check
Permit
Backcheck 1
Backcheck 2
1
2
5
6
4
3
Final Estimate
95 Estimate
30 Estimate
60 Estimate
- Real time project cost control and management
during design development - Estimating transforms from conceptual budgeting
to hard take-off estimating during
pre-construction effort
18Design/Detail-Build Benefits
PRE-CONSTRUCTION
CONSTRUCTION
Plan Check
Permit
Backcheck 1
1
2
6
5
3
4
- Single Set of Fully Coordinated, Engineered and
Constructible Documents - Reduced Burden on both Engineering Production /
Detailing Production - Efficient Use of Resources
- Single Drawing Set for Code Authority Review
- No Deferred Approvals (Seismic Anchoring, Fire
Protection, Shop Drawings) - Significantly Reduced Construction RFIs and
Change Orders
19Closing Remarks
Successful Design-Bid-Build is more than just 3D
CAD software, construct-ability feedback, or cost
control during the design phase. Its about
getting the right people to do the tasks at which
they are best, and providing a forum for seamless
communication through-out the design and
construction process.
20Questions