Transcript and Presenter's Notes

Title: Integrating Detailing and Engineering: A Mechanical Design Builders Approach


1
Integrating Detailing and EngineeringA
Mechanical Design Builders Approach
Victor Sanvido, Michael McLaughlin, Scott Muxen,
George Benoit September 2004
2
Presentation Outline
  • Integrating the Design Build Process
  • Healthcare Case Study
  • Design Assist Integration
  • Design Detail Build Integration
  • Design Detail Build Benefits

3
Integrating the Design Build Process Process
Theory
Gaps
Traditional Design Bid Build (Plan Spec)
Gaps
Conventional Design Assist/Design Build
Design - Detail - Build
Complete, Fully Engineered Coordinated
Constructible Cost Effective, Innovative
Design Meets Project Quality, Performance, Budget
and Schedule Requirements
Design Start
4
Healthcare Case Study
  • 257,000 sq.ft Acute Care Hospital
  • Emergency Department, Operating Suite, Imaging,
    Diagnostic Test, In-Patient Facilities
  • Design Build HVAC Ductwork, Piping, Plumbing,
    Medical Gas Systems Fire Protection

5
Design Assist Integration (Engineer already
engaged by Project Team)
Pre-construction Roles Responsibilities
  • Contractor Design Assistance
  • Design Specification Review
  • Value Analysis / Options
  • Construct-ability Review / Spot Detailing
  • Preliminary Trade Coordination
  • Cost Feedback (Estimating Services)
  • Engineer - Construction Documents
  • Performance Criteria, Code Compliance
  • Calculations
  • Equipment Selections
  • Smart Drafted Floor Plans
  • Flow/Riser Diagrams
  • Smart Details
  • Smart Specifications

6
Design Assist Process
PRE-CONSTRUCTION
CONSTRUCTION
Plan Check
Permit
Backcheck 1
1
2
5
6
3
4
Final Estimate
95 Estimate
30 Estimate
60 Estimate
  • Pricing, Options Value Analysis
  • Design Team Engineering
  • Spot Detailing (Constructability Review)
  • Construction/ Fabrication Detailing
  • Trade Coordination
  • Construction

7
Design Assist Process Challenges
PRE-CONSTRUCTION
CONSTRUCTION
Plan Check
Permit
Backcheck 1
1
2
5
6
3
4
Final Estimate
95 Estimate
30 Estimate
60 Estimate
  • Gaps in Information Hand-off
  • Multiple Drawing Sets for Review by City,
    Inspectors, Owner
  • Deferred Drawing Packages (Seismic Anchoring,
    Fire Protection, Shop Drawings)
  • Increased Risk of Construction RFIs and Change
    Orders

8
Design Build Integration (In-House Design Build
Team engaged by Project Team)
Pre-construction Roles Responsibilities
  • Right Size Calculations
  • Sweet Spot Equipment Selections
  • Constructible Details
  • Applicable Specifications
  • Integrated Design / Cost Control
  • Performance Criteria, Code Compliance
  • Smart Drafted Floor Plans
  • Smart Design Coordination
  • Flow/Riser Diagrams

9
Design Detail Build Process
PRE-CONSTRUCTION
CONSTRUCTION
Plan Check
Permit
Backcheck 1
1
2
6
5
3
4
  • Pricing, Options Value Analysis
  • Design Team Engineering
  • Design Team Detailing Integration
  • Construction / Fabrication Detailing
  • Integral Trade Coordination
  • Construction

Single Set of Documents Engineering Documents
with Detailed Floor Plans
10
Design Assist
PRE-CONSTRUCTION
CONSTRUCTION
Plan Check
Permit
Backcheck 1
1
2
5
6
3
4
  • Design Detail Build

PRE-CONSTRUCTION
CONSTRUCTION
Plan Check
Permit
Backcheck 1
1
2
6
5
3
4
11
Pricing, Options and Value Engineering
1.
PRE-CONSTRUCTION
CONSTRUCTION
Plan Check
Permit
Backcheck 1
Backcheck 2
1
2
5
6
5
3
4
95 Estimate
Final Estimate
30 Estimate
60 Estimate
  • Performance Criteria Review
  • Load Calculations Review
  • Optimization of Central Plant
  • Right Sizing Routing of Systems
  • Specification Review
  • Trade Coordination Review

12
Engineering Team Responsibilities
2.
PRE-CONSTRUCTION
CONSTRUCTION
Plan Check
Permit
Backcheck 1
Backcheck 2
1
2
5
6
5
3
4
Final Estimate
95 Estimate
60 Estimate
30 Estimate
  • Core Engineering Activities - Performance
    Criteria, Code Analysis, Calculations, System
    Sizing, Equipment Selection, etc.
  • Redlines of System Routing with Sizing
  • Lead Specification Preparation
  • Lead Coordination with Design Team Members
    (Architect, Structural)
  • Facilitate Coordination with other Trades
    (Electrical, Pneumatic Tube, Fire Protection,
    Plumbing)

13
Integration of Detailing Team
3.
PRE-CONSTRUCTION
CONSTRUCTION
Plan Check
Permit
Backcheck 1
Backcheck 2
1
2
5
6
5
3
4
Final Estimate
95 Estimate
60 Estimate
30 Estimate
  • Relocate Key Players into Project Area
  • Integrate Engineering and Detailing CAD Systems
  • Identify Project Goals with Team
  • Recognize Optimized Use of Resources
  • Identify Team Roles Responsibilities

14
Construction/Fabrication Detailing
4.
CONSTRUCTION
PRE-CONSTRUCTION
Plan Check
Permit
Backcheck 1
Backcheck 2
1
2
5
6
5
3
4
Final Estimate
95 Estimate
30 Estimate
60 Estimate
  • Phase I Pre Plan Check
  • Convert Engineering Redlines into Finished 3D
    Floor Plans for Plan Check
  • Dimension Elevate all Systems
  • Fully Coordinate with all Trades
  • Seismic Anchoring Package Complete
  • Phase II Post Plan Check (Construction)
  • Add Fabrication/ Construction Information (spool
    sheets, CNC download data, etc)
  • Incorporate Procured Equipment Shop Drawings
  • Add Foremen Requested Information
  • Final Trade Coordination

15
Integral Trade Coordination
5.
PRE-CONSTRUCTION
CONSTRUCTION
Plan Check
Permit
Backcheck 1
Backcheck 2
1
2
5
6
5
4
3
Final Estimate
95 Estimate
30 Estimate
60 Estimate
  • Trade coordination occurs during design phase
    with actual detailing information, real dimension
    and routing
  • Detailers have direct influence on design
    development - prior to plan check review or
    Issue for Construction rigidity
  • Significant reduction of costly construction
    administration (RFI, change orders, schedule
    impacts, etc.)
  • Real time coordination using 3D CAD models
  • Seamless design and coordination information
  • Full trade impact evaluation of design changes

16
Construction
6.
PRE-CONSTRUCTION
CONSTRUCTION
Plan Check
Permit
Backcheck 1
Backcheck 2
1
2
6
5
4
3
Final Estimate
95 Estimate
30 Estimate
60 Estimate
  • Construction starts with complete, fully
    engineered, coordinated constructiblecost
    effective, innovative design.Meets project
    quality, performance, budget and schedule
    requirements
  • Specialty Contractors in position to pull General
    Construction, rather than traditional push method.

17
Estimating
7.
PRE-CONSTRUCTION
CONSTRUCTION
Plan Check
Permit
Backcheck 1
Backcheck 2
1
2
5
6
4
3
Final Estimate
95 Estimate
30 Estimate
60 Estimate
  • Real time project cost control and management
    during design development
  • Estimating transforms from conceptual budgeting
    to hard take-off estimating during
    pre-construction effort

18
Design/Detail-Build Benefits
PRE-CONSTRUCTION
CONSTRUCTION
Plan Check
Permit
Backcheck 1
1
2
6
5
3
4
  • Single Set of Fully Coordinated, Engineered and
    Constructible Documents
  • Reduced Burden on both Engineering Production /
    Detailing Production
  • Efficient Use of Resources
  • Single Drawing Set for Code Authority Review
  • No Deferred Approvals (Seismic Anchoring, Fire
    Protection, Shop Drawings)
  • Significantly Reduced Construction RFIs and
    Change Orders

19
Closing Remarks
Successful Design-Bid-Build is more than just 3D
CAD software, construct-ability feedback, or cost
control during the design phase. Its about
getting the right people to do the tasks at which
they are best, and providing a forum for seamless
communication through-out the design and
construction process.
20