FAR DETECTOR: Rik Gran - PowerPoint PPT Presentation

1 / 5
About This Presentation
Title:

FAR DETECTOR: Rik Gran

Description:

Close to 100% live (scripts crashed, depriving me of exact number) ... (Munters B fully recovered during MI LCW leak search access) 207 kW Best week 214 kW ... – PowerPoint PPT presentation

Number of Views:15
Avg rating:3.0/5.0
Slides: 6
Provided by: wwwnum
Category:
Tags: detector | far | gran | leak | live | rik

less

Transcript and Presenter's Notes

Title: FAR DETECTOR: Rik Gran


1
  • FAR DETECTOR Rik Gran
  • 99.8 livetime last week
  • Surface Heat Exchangers tuned, known transition
    problems addressed
  • Down time planned for 900-1400 Thursday 27
    March. Minnesota Power will repair a lightning
    arrestor on the 4,800V power feed to the mine
    1000-1200, graceful shut down/startup needed
    before and after.
  • Plan to run low intensity NuMI beam studies
    during this time
  • NEAR DETECTOR Alec Habig
  • Close to 100 live (scripts crashed, depriving me
    of exact number)
  • Nothing of note, anyway fine data taking

2
  • Protons/pulse
  • 26x1012 29 7-turns mixed
  • 32x1012 NuMI only (during pbar recycler
    transfers)

lt2.63 E13 pppgt Best week 2.59 E13 A new
record! Thanks to everyone in AD who tuned up
the accelerator complex so nicely to make this
happen
3
MI access Booster, TeV F-sector
lt207 kWgt Best week 214 kW
5.5E18 Best week 6E18 pot
A decent week No NuMI specific downtime (Munters
B fully recovered during MI LCW leak search
access)
210kW when MTEST is running, 230kW in mixed
mode, 250kW in NuMI only
4
Protons per day (E17)
end of 2007 shutdown
5
end of 2007 shutdown
Write a Comment
User Comments (0)
About PowerShow.com