Title: Anchoring ORM Scenario


1
(No Transcript)
2
(No Transcript)
3
  • 1. IDENTIFY HAZARDS
  • Liberty party incidents
  • Improper anchoring procedure
  • Boat davit, faulty rigging
  • Insufficient hotel services
  • Water taxis in poor condition
  • Water sport accidents drowning

4
2
Assess Hazards .
  • Assess the risks of identified hazards based on
  • Probability of occurrence
  • Severity of possible loss

5
(No Transcript)
6
2. ASSESS HAZARDS
  • HAZARDS
  • Liberty party incidents
  • Improper anchoring procedure
  • Boat davit, faulty rigging
  • Insufficient hotel services
  • Water taxis in poor condition
  • Water sport accidents drowning
  • RISK ASSESMENT
  • II / B, RAC2

7
2. ASSESS HAZARDS
  • RISK ASSESMENT
  • II / B, RAC2
  • III / C, RAC4
  • III / B, RAC3
  • II / C, RAC3
  • II / C, RAC3
  • I / B, RAC1
  • HAZARDS
  • Liberty party incidents
  • Improper anchoring procedure
  • Boat davit, faulty rigging
  • Insufficient hotel services
  • Water taxis in poor condition
  • Water sport accidents drowning

8
3
Make Risk Decisions .
  • Prioritize most serious risks first
  • Discuss options to reduce the risk
  • Decide whether you will conduct the task.
  • Communicate as required

9
3. MAKE RISK DECISIONS
RAC 1 2 3 3 3 4
  • RISK ASSESSMENT
  • 1. Water sport accidents Drowning
  • 2. Liberty party incidents
  • 3. Water taxis in poor condition
  • 4. Insufficient hotel services
  • 5. Boat davit, faulty rigging
  • 6. Improper anchoring procedure

10
3. MAKE RISK DECISIONS
DISCUSSION / OPTIONS - Safety brief by local
agency, listing of preferred activities, off
limit areas. - Buddy system, Police brief, local
tour information, off limits listing. - Coast
guard certification, duty engineer inspections. -
Contingency plan for use of water holding trash
and sewage. Verify contractor is certified and
recommended. - Verify procedures, safety walk
through, PMS as required. - Qualified personnel,
maintain modified SA, CIC engineering watches.
  • RISK ASSESSMENT
  • 1. Water sport accidents
  • drowning - RAC 1
  • 2. Liberty party incidents
  • - RAC 2
  • 3. Water taxis in poor
  • condition - RAC 2
  • 4. Insufficient hotel services
  • - RAC 3
  • 5. Boat davit faulty rigging
  • - RAC 4
  • 6. Improper anchoring
  • procedures - RAC 4

11
4
Implement Controls .
  • Engineering controls
  • Administrative controls
  • Personal protective equipment

12
4. IMPLEMENT CONTROLS
  • Schedule local services agencies to provide
    information briefs and materials for port visit.
  • ( Administrative
    control )
  • SORM Anchoring, Ready lifeboat.
  • ( Administrative
    control )
  • Safety brief schedule of events POD enclosure
    or GMT,
  • explaining evolution.
  • ( Administrative
    control )

13
5
Supervise .
  • Monitor for effectiveness of controls
  • Watch for change
  • Evaluate and adjust controls as the situation
    changes