Title: Lago de Josephina
1(No Transcript)
2(No Transcript)
3(No Transcript)
4(No Transcript)
5(No Transcript)
6(No Transcript)
7(No Transcript)
8(No Transcript)
9Lago de Josephina
10(No Transcript)
11Lago de Josefina, Cuenca, Ecuador
12(No Transcript)
13(No Transcript)
14The Pantanal
- 140,000 km2 of seasonally inundated floodplain
- West Central Brazil, Bolivia, Paraguay
- river corridors
- gallery forests
- perennial wetlands and lakes
- seasonally inundated grasslands
- terrestrial forests
- cerrado (central Brazil)
- chaco (Bolivia, Paraguay)
- Amazon
15Stage (cm)
Paraguay River at Ladario Recorded seasonal max
and min stages
Source Ponce 1995
16(No Transcript)
17(No Transcript)
18(No Transcript)
19Caiman yacare
20Capped Heron Pilherodius pileatus
21Southern Screamer Chauna torquata
22Jabiru Jabiru mycteria
23Turquoise-fronted Parrot Amazona a. aestiva
24Hyacinth Macaw Anodorhynchus hyacinthinus
25White-faced Capuchin Cebus capucinus (not in
Pantanal)
26Piranha Serrasalmus spiropleura
27(No Transcript)
28(No Transcript)
29Water hyacinth Eichhornia crassipes
Giant water lily Victoria amazonica
30Rooted water hyacinth Eichhornia azurea
31Cambara Vochysia divergens
32Environmental Threats in the Pantanal
- Agricultural development
- Mining
- Urban waste
- Navigation projects
- Poaching
- Tourism growth
33(No Transcript)
34(No Transcript)
35(No Transcript)
36(No Transcript)
37(No Transcript)
38(No Transcript)
39Venha conhecer o maior e melhor hotel do Pantanal!
40Paraguay-Paraná Hidrovía
- Would make the 3,440 km Paraguay-Paraná river
system navigable year-round from Nueva Palmira
(Uruguay) to Cáceres (Brazil). - Would improve or construct the infrastructure
needed to service the increased shipping capacity.
41(No Transcript)
42Timeline
- A channelized waterway into the heart of South
America is an old idea and the Paraguay-Paraná
have been navigated for many decades. - Late 1980s Intergovernmental Committee on the
Hidrovía created to oversee the development of
this waterway. - 1990 Publication of an economic feasibility
study. - 1995-1997 Engineering, economic, and
environmental assessments of the proposed
project. - 1990s Cost-benefit disputes.
- 1998 Brazil halts plans for construction
activities along the Brazilian portion of the
waterway.
43(No Transcript)
44Channelized system
Source South Florida Water Management District
45(No Transcript)
46Sources Schaller (1983), Hamilton (1999),
Gottgens (unpubl.)
47Flooded area (km2) at low water
Lateral Flood Pulse
Data from Hamilton, 1999
48(No Transcript)
49(No Transcript)
50Monthly distributions of annual flood peaks
Longitudinal Flood Pulse
Source Ponce (1995)
51Economic benefits
Environmental benefits
52(No Transcript)
53(No Transcript)