Title: Microturbine Operation with Biogas from a Covered Dairy Manure Lagoon
1Microturbine Operation with Biogas from a
Covered Dairy Manure Lagoon
2Douglas W. WilliamsBioResource and Agricultural
EngineeringCalifornia Polytechnic State
UniversitySan Luis Obispo, CA USAJ.J.
FrederickStudent AssistantCalifornia
Polytechnic State UniversitySan Luis Obispo, CA
USA
3Acknowledgements
- ? WRBEP
- (Western Regional Biomass Energy
Program) - ? CSU-ARI
- (CA State Univ.Agricultural Research
Institute) - ? Southern California Gas Company
- ? California Polytechnic State University
- ? Capstone Microturbines
- ? USDA-NRCS
- (Natural Resource Conservation Service)
4Methane Production Technologies
- ? Covered Lagoon 78 Success Rate
- ? Plug Flow 37 Success Rate
- ? Complete Mix 30 Success Rate
5Covered Lagoon Digester at 9000-head Swine Farm
6Lagoon Digester and Biogas Handling
7Successful Biogas-fueled 60 KW Engine-Generator
8 FARM DESCRIPTION? Free Stall Dairy
300 Cows, Heifers, Calves Equivalent /250
AUs (Animal Units) ? Flushed Dairy Manure
Removal 250 to 400 cubic meters/day .3 to .4
Total Solids 3000 to 4000 mg/l
COD ? Electrical Usage 234,000
KWhrs/year 21,000 per year
9Cal Poly Dairy Parlor and Cow Lane
10Figure 1. Covered Lagoon Schematic
Milking Parlor
FLUSHED MANURE WASH ALLEY
Recycle flush water pump
Irrigation pump
Overflow to storage
Sump and pump
Below-ground Biogas Line
Existing Storage Lagoon, 19,000 cubic meters
capacity
New Covered Lagoon, 14,000 cubic meters liquid
capacity
30 kW Micro-Turbine electric Generator System
Solids Separator
Manure Solids
Transfer Pump
Slurry Inlet
Sump and
11Measuring Influent Flow into Lagoon
12Lagoon Cover
13Lagoon Covers and Biogas Pipe Connector
14Lagoon Cover and Biogas Pipe
15Biogas Pipe Installation
16Biogas pipe with Condensate Trap
17Biogas Piping Condensate Removal Box
18Biogas Handling System
19Biogas Equipment and Lagoon Cover
20Compressor, Microturbine and Heat Exchanger
21TABLE 1
- MAJOR EQUIPMENT ITEMS
- Digester Cover and Installation 90,000
- Gas Handling 5,000
- Micro-Turbine Compressor, Heat Exchange
50,000 - Electric Generator Building and Utility
5,000 - Utility Tie-in 5,000
- Equipment Subtotal 155,000
- CONSTRUCTION
- Engineering 25,000
- Construction Subtotal 25,000
-
- TOTAL 180,000
22- PROJECT STATUS
- ? Cover Installed 90 of area
covered ? Biogas Production 200 to 300 cu
meters/day 88 Methane, 12 CO2 - ? Biogas tested in 10 KW Engine- Generator Set
- ? 75 COD Reduction
23Microturbine and Covered Lagoon
2410 KW Engine-Gen Set
25Biogas Measurement by Cal Poly Students
2610 KW Engine-Generator Test on Biogas
27Engine Generator at Full 10 KW
28Covered Lagoon Effluent Pipe
29- CONCLUSIONS
- ? 10 KW Engine-Generator Test
- Input 11 cubic meters/hr
- Output 10 KW
- Efficiency10 ? 30 KW Microturbine
Specification - Input 13 cubic meters/hr
- Output 28 KW
- Efficiency 27
- Effluent Characteristics
- 1000 to 1500 mg/l COD
- 90 mg/l Ammonia
30 BENEFITS OF ANAEROBIC
DIGESTION? Odor control ? Effective Manure
and Nutrient Management? Electrical Returns
170,000 KWhrs/year 15,500/year 75 of
Demand