Microturbine Operation with Biogas from a Covered Dairy Manure Lagoon PowerPoint PPT Presentation

presentation player overlay
1 / 30
About This Presentation
Transcript and Presenter's Notes

Title: Microturbine Operation with Biogas from a Covered Dairy Manure Lagoon


1
Microturbine Operation with Biogas from a
Covered Dairy Manure Lagoon
2
Douglas W. WilliamsBioResource and Agricultural
EngineeringCalifornia Polytechnic State
UniversitySan Luis Obispo, CA USAJ.J.
FrederickStudent AssistantCalifornia
Polytechnic State UniversitySan Luis Obispo, CA
USA
3
Acknowledgements
  • ? WRBEP
  • (Western Regional Biomass Energy
    Program)
  • ? CSU-ARI
  • (CA State Univ.Agricultural Research
    Institute)
  • ? Southern California Gas Company
  • ? California Polytechnic State University
  • ? Capstone Microturbines
  • ? USDA-NRCS
  • (Natural Resource Conservation Service)

4
Methane Production Technologies
  • ? Covered Lagoon 78 Success Rate
  • ? Plug Flow 37 Success Rate
  • ? Complete Mix 30 Success Rate

5
Covered Lagoon Digester at 9000-head Swine Farm
6
Lagoon Digester and Biogas Handling
7
Successful Biogas-fueled 60 KW Engine-Generator
8
FARM DESCRIPTION? Free Stall Dairy
300 Cows, Heifers, Calves Equivalent /250
AUs (Animal Units) ? Flushed Dairy Manure
Removal 250 to 400 cubic meters/day .3 to .4
Total Solids 3000 to 4000 mg/l
COD ? Electrical Usage 234,000
KWhrs/year 21,000 per year
9
Cal Poly Dairy Parlor and Cow Lane
10
Figure 1. Covered Lagoon Schematic
 
 
Milking Parlor
                                             
FLUSHED MANURE WASH ALLEY
Recycle flush water pump
Irrigation pump
Overflow to storage
Sump and pump
Below-ground Biogas Line
  Existing Storage Lagoon, 19,000 cubic meters
capacity
  New Covered Lagoon, 14,000 cubic meters liquid
capacity
30 kW Micro-Turbine electric Generator System
Solids Separator
Manure Solids
Transfer Pump
Slurry Inlet
Sump and
11
Measuring Influent Flow into Lagoon
12
Lagoon Cover
13
Lagoon Covers and Biogas Pipe Connector
14
Lagoon Cover and Biogas Pipe
15
Biogas Pipe Installation
16
Biogas pipe with Condensate Trap
17
Biogas Piping Condensate Removal Box
18
Biogas Handling System
19
Biogas Equipment and Lagoon Cover
20
Compressor, Microturbine and Heat Exchanger
21
TABLE 1
  • MAJOR EQUIPMENT ITEMS
  • Digester Cover and Installation 90,000
  • Gas Handling 5,000
  • Micro-Turbine Compressor, Heat Exchange
    50,000
  • Electric Generator Building and Utility
    5,000
  • Utility Tie-in 5,000
  • Equipment Subtotal 155,000
  • CONSTRUCTION
  • Engineering 25,000
  • Construction Subtotal 25,000
  • TOTAL 180,000

22
  • PROJECT STATUS
  • ? Cover Installed 90 of area
    covered ? Biogas Production 200 to 300 cu
    meters/day 88 Methane, 12 CO2
  • ? Biogas tested in 10 KW Engine- Generator Set
  • ? 75 COD Reduction

23
Microturbine and Covered Lagoon
24
10 KW Engine-Gen Set
25
Biogas Measurement by Cal Poly Students
26
10 KW Engine-Generator Test on Biogas
27
Engine Generator at Full 10 KW
28
Covered Lagoon Effluent Pipe
29
  • CONCLUSIONS
  • ? 10 KW Engine-Generator Test
  • Input 11 cubic meters/hr
  • Output 10 KW
  • Efficiency10 ? 30 KW Microturbine
    Specification
  • Input 13 cubic meters/hr
  • Output 28 KW
  • Efficiency 27
  • Effluent Characteristics
  • 1000 to 1500 mg/l COD
  • 90 mg/l Ammonia

30
BENEFITS OF ANAEROBIC
DIGESTION? Odor control ? Effective Manure
and Nutrient Management? Electrical Returns
170,000 KWhrs/year 15,500/year 75 of
Demand