Energy Balance and Sustainable Solar Electrification in Bhutan - PowerPoint PPT Presentation

1 / 25
About This Presentation
Title:

Energy Balance and Sustainable Solar Electrification in Bhutan

Description:

DOE will estimate usage of spare parts each year. DOE will analyze information from monitoring process and upgrade installation ... – PowerPoint PPT presentation

Number of Views:29
Avg rating:3.0/5.0
Slides: 26
Provided by: webCe
Category:

less

Transcript and Presenter's Notes

Title: Energy Balance and Sustainable Solar Electrification in Bhutan


1
Energy Balance and Sustainable Solar
Electrification in Bhutan
  • ECE 510- Sustainable Energy Systems
  • NGAWANG CHOEDA
  • 06/04/2008

2
AGENDA
  • Institutional Model for Off Grid Solar
  • Sustainable Management of Forests
  • Revenue from Sale of Hydropower

3
Off-Grid Solar Problems
  • No Focal Agency
  • Inadequate local knowledge of maintenance and
    proper use of systems.
  • Poor repair, maintenance, reporting and
    monitoring.
  • Low literacy rates
  • Written manuals less value
  • Limited/difficult access to spare parts.
  • 3-4 days walk, less availability
  • Improper disposal of Batteries

4
Criteria for Model
  • Completion of 100 Solar electrification within
    the Five year Plan period.
  • Emphasis on Institutional capability with goal of
    providing solar electrification at par with grid
    extensions.

5
Basic Assumptions
  • Life cycle cost of solar HH electrification equal
    to Grid
  • Rural Investment rather than welfare investment
  • Effective mobilization of stakeholders
  • Effective means to repair and maintain systems

6
Present Institutional Model
7
A. Institutional Players
  • 1. Department of Energy( DOE)
  • Focal Agency for Solar Electrification
  • Set standards for equipment specification
  • Improve the O M process
  • 2. Department of Human Resources
  • MOU with DOE- Pooling of labor contractors
  • Assist in development of Training Programs for
    Village Technicians

8
A. Institutional Players
  • 3. Area Supervisors
  • Contract with DOE
  • Assist in training of Village Technicians
  • Provide feedback to DOE
  • 4. Village Committee
  • Supervision of the Village Technicians
  • Maintenance of Inventory of spare-parts
  • Dispute arbitration between users and technicians
  • Forwards requests for additional HH
    electrification
  • Decides technicians wages

9
A. Institutional Players
  • 5. Village Technicians
  • Contract with user and Village Committee
  • Periodic maintenance and Troubleshoot problems
  • 6. User
  • Follow DOE guidelines for use of system.
  • Minimum charge payment to technician for service

10
I. Installation Phase
  • DOE- Standard design and Installation Two 11 W
    lights for 4 hrs /day
  • Procurement of equipments and spare parts and
    transportation( Directly or Contractor).
  • Contractor teams train potential village
    technicians on System installation and
    maintenance.
  • Committee selects Village technician
  • User sensitization informed of warranty
    conditions, how to obtain maintenance and repair
    support

11
II. Service Phase
  • DOE will forecast the spare parts requirement and
    reflect in O M expenses of Annual Budget.
  • Additional Spare parts Area supervisor to
    ensure that failed part properly
    returned/disposed
  • Refresher course on bi-annual basis by
    Institutes.
  • Area supervisors to collect maintenance e logs
  • DOE will estimate usage of spare parts each year.
  • DOE will analyze information from monitoring
    process and upgrade installation standards,
    training programs etc ( if necessary)

12
Institutional Phase
13
Service Phase
14
III. Monitoring and Evaluation
  • All major components to be tracked and replaced
    through proper inventory details( serial Nos)
  • Village technician to maintain log of maintenance
    activity at each site.
  • Area Supervisor collect log sheets and provides
    to DOE for further analysis.( Quarterly preferred
    due to remote locations).
  • Proper record of each installations- Serial Nos,
    GPS coordinates etc
  • Annual report to be prepared by DOE( statistics
    on O M for year )

15
New Components within Model
  • Monitoring and evaluation of solar installations.
  • Use of Private Sector to install systems and
    train technicians.
  • Development of Private Sector capacity in support
    of Solar electrification.
  • A comprehensive spare-parts delivery system
  • SUSTAINABILITY !!!!!!!!!!!!!!

16
Biomass resources and consumption in Bhutan
(contd)
  • One of the highest consumption of firewood in the
    world due to low efficiencies of the devices at
    various end users
  • - Open fire mud stove 9
  • - Bukhari (metal stove for heating)
  • - Altus stoves 20
  • - Smokeless stove 15

17
Firewood Management
18
Wood Efficiency improvement Programme
  • Pilot Project- Installation of Clay stoves
  • Average fuel wood consumption by rural
    un-electrified HH 7.8 tonnes/HH/annum
  • Strategy- Development of forest conservation and
    management strategy
  • Learn from other countries mistakes and avoid
    huge expenditures later on.

19
Sustainable Forest Management
  • Forest code of Practices has been developed which
    will guide planning and implementation in Forest
    Management units (FMUs) for harvesting of
    resources
  • No clear felling system
  • No Ad-hoc removal of forestry resources without
    a Management plan.
  • Constitution of Bhutan requires that 60 of
    country to be under Forest cover.
  • Recommendation- Develop modalities and procedures
    for transparent and verifiable assessment of
    changes( increase in forest cover, carbon
    stock,GHG emissions)

20
Revenue from 336 MW Plant
21
Revenue from 60 MW Plant
22
Revenue from 1020 MW Plant
  • 2006-07 Net revenue Nu 3000 m( US 75 m)
  • Net Annual Revenue from sale of electricity from
    all HPPs close to Nu 5000 million( US 125
    million)

23
Hydropower Projects in the pipeline
24
Hydropower Revenue Projections
25
End of the presentation
  • THANK YOU AND TASHI DELEK !