Jamie Holder University of Leeds August 2005 - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Jamie Holder University of Leeds August 2005

Description:

Crab Nebula observations. 3.9 hours ON/OFF. 19.4 s. 10 s/hour. Note. Engineering data ... Horseshoe Canyon. 1800m. KPNO. Completed. Site Clearance. Power ... – PowerPoint PPT presentation

Number of Views:51
Avg rating:3.0/5.0
Slides: 13
Provided by: astLe3
Category:

less

Transcript and Presenter's Notes

Title: Jamie Holder University of Leeds August 2005


1
Status and Performance of the First VERITAS
Telescope
Jamie Holder University of Leeds
August 2005
2
VERITAS Telescope I
  • 12m diameter reflector
  • Davies-Cotton F/1.0
  • 110m2
  • 499 PMT Camera
  • Steel OSS
  • Installed at Mt. Hopkins Basecamp (1275m) in
    January 2005

3
Mechanical Performance
  • Alt-Az mount
  • Slew speed
  • 0.3?/sec
  • 1.0?/sec modified
  • Tracking accuracy
  • Still evaluating
  • Encoders give lt0.005?
  • Source location good

4
Optical Performance
  • 350 mirror facets
  • glass
  • aluminium coated on-site
  • reflectivity gt90 at 320nm
  • PSF
  • 0.09? FWHM initially
  • 0.06? now

PSF plot (with PMT size)
5
Camera
  • 499 PMTs
  • Photonis XP2970
  • 0.15? spacing
  • 3.5? FOV
  • PMT Gain 2 ? 105
  • NSB 100 - 200 MHz
  • No light cones yet

6
Trigger
  • Each channel has programmable CFDs
  • CFD output sent to pattern selection trigger
  • any 3 adjacent PMTs
  • Trigger rate 150Hz

7
Data Acquisition
  • PMT signals digitized with 500MHz sampling FADCs
  • Data rates
  • 24 samples/channel
  • 13.5 kb/event
  • 10 deadtime _at_ 150 Hz
  • 4 with zero supression

8
Timing
  • Define optimum integration gate (10ns)

Poster Exploiting VERITAS Timing Information
Holder et al.
9
Results
  • Crab Nebula observations
  • 3.9 hours ON/OFF
  • 19.4 s
  • 10 s/hour
  • Note
  • Engineering data
  • Preliminary analysis
  • No light cones
  • cf Whipple 10m (7s/hour)
  • Mkn 421 and Mkn 501 also detected (Poster Cogan
    et al)

10
Results
  • Local Muon background
  • 150 GeV trigger threshold
  • 400 GeV analysis threshold
  • Need Stereo!

Local Muons
11
Kitt Peak Site
  • Horseshoe Canyon
  • 1800m
  • KPNO
  • Completed
  • Site Clearance
  • Power
  • Telescope Pads
  • Temporary access problems

12
Temporary Site
  • 2 Telescopes at Mt. Hopkins Basecamp
  • 88m baseline
  • First light October 2005
  • Test
  • array trigger
  • array analysis
  • 4 telescopes on Kitt Peak October 2006
Write a Comment
User Comments (0)
About PowerShow.com