Transcript and Presenter's Notes

Title: FIDIC Workshop WS 12, Beijing Conference


1
FIDIC Workshop WS 12, Beijing Conference
  • Design Build Operate
  • a new Contract
  • Wednesday, 7th September 2005
  • Dipl.-Ing., Dipl.-Wirt.-Ing. Axel-V. Jaeger, EC
    Member NEK Ingenieure, Berlin, Germany

2
FIDIC DBO ( Definition )
  • The Design Build Operate approach
  • combines design, construction, long term plant /
  • facility operation and maintenance into a single
  • contract, with one legal entity, known as the
  • Contractor.

3
FIDIC DBO Format
  • green field scenario
  • a sequence of Design Build Operate
  • brown field scenario
  • a sequence of Operate Design - Build

4
CONDITIONS OF CONTRACT
published 1999
5
FIDIC DBO Motivation
  • Time Schedule Advantages
  • Financial Compliance
  • Single Point of Responsibility
  • Allocation of Project Risk
  • Fitness for Purpose

6
Design Build Operate Organisation
7
DBO FLOW CHART(Typical Sequence of Principle
Events)
8
DBO FLOW CHART ( TIMELINE PART 1 )
9
DBO FLOW CHART ( TIMELINE PART 2 )
10
FIDIC DBO Independent Auditor
  • Appointment of an Independent Auditor is a
    common practice globally for compliance with
    Quality Assurance procedures . ( Performance
    Criteria )
  • It is required to assess the Contractors
    Performance in carrying out the Contract, and
    also to examine the Employers Management and
    Monitoring of the Contractor.
  • Defects in the performance of both the
    Contractor and the Employer will be identified
    and addressed.

11
FIDIC DBO Asset Replacement Fund
  • In order to ensure that the condition of the
    Plant in the Works is properly maintained,
    replacement of major items of Plant will be
    required over the Contract Period.
  • Therefore capital sums will be need to be
    expended throughout the Operation and Maintenance
    Period.
  • This money will be held as an Asset Replacement
    Fund.

12
FIDIC DBO Asset Replacement Fund
  • Monies provided under the DBO Contract on the
    schedule presented by the Contractor, specifying
    the major items of Plant to be replaced and
    timing and cost of such replacement.
  • The following cost are excluded
  • Routine maintenance items
  • Correction of defects
  • Replacement of Plant and Material which have a
    life expectancy of less than (5) to 7 years
  • Providing spares between scheduled dates for
    major plant replacement
  • Replacement of Plant and Materials not
    identified in the schedule of major plant items

13
FIDIC DBO Maintenance Reserve Fund
  • The Maintenance Reserve Fund is required to
    provide an incentive to the Contractor to ensure
    that the Works are in proper condition at the end
    of the Operation and Maintenance Period.
  • Definition
  • A retention of 5 from payments due to the
    Contractor in the last five years of the
    Operation and Maintenance Period, up to a
    contracted ( capped ) amount, to be released
    after issuing the Contract Completion Certificate.

14
FIDIC DBO Facility Management Plan
  • The Facility Management Plan means the
  • operation and maintenance methodology
  • submitted by the Contractor with his Tender
  • and the requirements are as detailed in the
    Employers Requirements.

15
FIDIC DBO Variation / Change Management
  • Typically, it is anticipated that the following
    must be provided for i.e.
  • Changing load
  • Major industry ( arrival / departure )
  • Technical obsolescence
  • Increased performance standards
  • Interaction with networks managed by others
  • Changes legislation
  • Contractor goes into liquidation
  • Failure to meet performance standards

16
DBO FLOW CHART ( TIMELINE PART 2 )
17
FIDIC DBO Joint Inspection
  • The Employers Representative and the Contractor
    shall carry out Joint Inspection on the condition
    of the Works identifying maintenance works,
    replacements and other works.

18
FIDIC DBO Final Inspection
  • The Contractor shall notify the Employer that
    the Works are complete and ready for Final
    Inspection.
  • After issuing the Contract Completion
    Certificate when passing the Final Inspection
    satisfactory the Employer shall be responsible
    for the care, safety, operation, servicing and
    maintenance of the works.

19
FIDIC DBO Risks
  • One of the advantages of the DBO approach is the
    value for money achieved through effective risk
    allocation.
  • The Employers and Contractors risks have to be
    clearly defined.

20
DBO FLOW CHART(Typical Sequence of Principle
Events)
21
FIDIC DBO CC Questions Word and Content
  • Facility Management Plan to assist and advise
    on the management and monitoring of the
    operation and maintenance of the facilities
    provided
  • Asset Replacement Fund to ensure proper
    condition of Plant in the Works over the O M
    Period
  • Maintenance Reserve Fund to provide an
    incentive to ensure that the Works are in proper
    condition at the end of O M Period
  • Independent Auditor issues on compliance process
    in relation to the operation and performance
    criteria
  • 5. Which colour for the DBO Conditions of
    Contract golden ?