Title: NARAC Users Group Meeting May 2, 2005
1NARAC Users Group MeetingMay 2, 2005
Lawrence Livermore National Laboratory P.O. Box
808, L-103 Livermore, CA 94550 bpobanz_at_llnl.gov
http//narac.llnl.gov
University of California
This work was performed under the auspices of
the U.S. Department of Energy by University of
California, Lawrence Livermore National
Laboratory under contract No. W-7405-Eng-48.
Lawrence Livermore National Laboratory
UCRL-PRES-211829
2Agenda
- Review items from the last meeting
- Status of DOE orders concerning NARAC
- Documentation and Information sharing
- NARAC System updates
- Since Oct 04
- Planned for the rest of this fiscal year
- iClient 2 .0 status
- Questions
3Review
- Review items from the last meeting
- Create an email list serve narac-doe-users_at_lists.l
lnl.gov - Initiate Newsletter Working on the format,
content and delivery method - Conference calls or Web Meeting Testing ATT Web
Mtg - Documentation Some under HELP on NARAC Web
- Training Material Guides located on NARAC Web
- Beta Testing by users Beginning this fall with
iClient 2.0
4Order Status
- DOE Notice 153.2
- Expired 8/11/04
- Guidance Will be wrapped up into new order.
- DOE Order 151.1x
- Out for review June 05 approval date?
- Guidance NARAC connectivity wording from 153.2
used verbatim in the new order no need to
change current policies regarding NARAC use.
5Documentation
- Update Notes under Help on the NARAC Web.
- Getting Started and Users Guides
- Standard Plot Information guide and Emergency
Response Guide on NARAC web. - Publications soon to be available online
- Still in progress is documentation on assumptions
and NARAC model users guides
6 Past System Updates
- Central System
- Version 15.5 Nov 04
- Centerline distances at set levels (can be set by
site) - iClient 1.x
- Version 1.5.1 Jan 05
- Retry software to assist in products transfer
during faulty internet connection - NARAC web
- Version 1.7 Oct 04
- Save Report as .pdf, .png or .jpg
- Meteorology (observed or gridded) viewable as a
layer - Added Web Logs
- Version 1.8 Jan 05
- Rubber banding zoom
- Added Chemical Spill Release
- Added Predefined Scenarios for Biological and
Chemical Releases - Version 1.9 Apr 05
- Centerline, Meteorological and Field Measurement
Data may displayed in/downloaded from a Table - Added Field Measurement visualization
- Added Sprayer Release and Predefined Scenarios
7 Future Updates (Central System)
- Central System
- Version 16.0 (currently testing)
- ASP (Application Server Platform) Orbix upgrade.
- Q2 (rebuilt questionnaire xml to allow new
release types) - Version 16.1 (summer)
- Improved Field Measurement capability
- Reworked Consequence Reports
- Version 16.2 (fall)
- Add resuspension capability
- Lodi-Foc (New nuclear detonation code)
8 Future Updates(iClient 1.x)
- iClient 1.x
- Version 1.6 (currently testing)
- Ability to Print Consequence Reports properly
- Sr-90/Y-90 hybrid and Sr-90 (Pure) options
- dpm/100cm2 unit added for field measurements
- Improved error log
- Probing of time series products
- Fix bug that cause inconsistency between plot and
legend in report
9 Future Updates(NARAC Web)
- NARAC web
- Version 1.10.0 (Late June)
- Nuclear Detonation Release Type
- Updated Consequence Reports (in coordination with
Sandia) - Version 1.11.0 (Fall)
- Support for iClient 2.0
10 iClient 2.0 Status
- Currently included
- Basic, Explosive, Fire, Chemical Spill, Stack
Plume Rise and Sprayer scenarios adding Nuc Det
soon. - System and User Defined Scenarios
- Visualization of Plume, Observed and Gridded Met,
Field Measurements, Plume Probing - World-wide mapping
- Reports, both 1 page and Consequence Report
- Ability to organize runs
- Improved Error Reporting
- Integration with the NARAC Web
- Expanded User preferences
- Import/Export Runs
- Hotspot (non-interactive)
11 iClient 2.0 Status (Continued)
- Not Yet included
- Moving Sources
- Site Specific Maps
- Map Probing
- Mixtures
- Interactive Hotspot/Epicode
- Field Measurement Entry
- User controlled plot output control
- Detailed Questionnaire
12 Questions?
- Is there anything needed that doesnt appear in
the schedule or should happen sooner? - Is there interest in using NARAC for Hazard
Assessments?