1
BIM Project Costing
2
Introduction
Stewart Carroll Beck Technology Chief Operating
Officer Tel 214 303 6293 Or Email
StewartCarroll_at_beck-technology.com
3
Company Overview
  • The Beck Group
  • Beck Technology Ltd

4
Owner Driven Changes
Owner
FedEx Speed
Wal-Mart Prices
Shorter Delivery Schedule
Lower Final Cost
Armani Quality
Higher Final Product Quality
5
Existing Delivery Solutions
Conceptual Phase
Schematic Phase
Design Development
Construction Documents
Construction Phase
Bid Phase
6
The Solution
EFFORT
EFFECT
PD
SD
DD
CD
PR
CA
OP
TIME
Original Graphics Patrick MacLeamy AIA/HOK
7
Building Information Modeling
Conceptual Phase
Schematic Phase
Design Development
Construction Documents
Construction Phase
Planning Phase
Micro View
Macro View
8
The Beck Group Strategy
Conceptual
SD
DD
CD
CA
Construction
Revit
Navisworks
Innovaya
DProfiler
Timberline
CMIC
9
Other Strategies
Conceptual
SD
DD
CD
CA
Construction
Bentley Architecture
Digital Project
ArchiCad
Onuma Planning
US Cost Design Exchange
US Cost Success Estimator
Constructor
10
BIM
Macro View
Should I build the project and what is the scope
and financial envelope for the project?
11
DProfiler with RSMeans
  • Life Cycle Cost Analysis

12
BIM
Micro Model
What is the design and how do you document it?
13
BIM Micro Model
Conceptual Phase
Schematic Phase
Design Development
Planning Phase
DOWNSTREAM BENEFITS
Engineering Cost Estimates Construction
Schedule As Builts
14
The Macro Model
  • Use sketches to develop a concept

15
The Macro Model
  • Very rapidly assemble a Macro Model

16
The Macro Model
  • Output the Scope, Budget, Assumptions and Proforma

17
DProfiler Demo
18
Benefit Streamline The Delivery Process
Setting expectations at the outset of a project
by clearly defining the scope and budget
dramatically reduces delivery time and overall
project cost
Design Development
Construction Documents
Construction Phase
Bid Phase
19
Benefit Predict Project Cost Early
Provides early, reliable and defendable costing
based on either RSMeans or your own
corporations cost data.
Traditional Estimating 240 Hours (2 estimators
120 hrs) Deliverable project cost
estimate VS DProfiler 20 Hours Deliverable
project cost estimate, and Project
Proforma Design Criteria Document Three-Dimensiona
l Model
92 man hour reduction
1 delta in accuracy
20
Benefit Communicate Project Scope
21
Benefit Evaluate Project Alternatives
Alternatives can be evaluated to provide
real-time cost comparisons of building envelopes,
MEP systems, structural systems, levels of
interior finish out, alternate sites, different
parking ratios and landscaping proportions.
Granite and Glass Cladding
Glass and Spandrel Glass Cladding
22
Example Mid rise office
23
Example Municipal Building
24
Example MOB
25
Example Industrial
26
Example Retail
27
Building Type Mixed Use (Office/Parking/Retail)
Location Dallas, Texas Gross Square Feet
168,867 Project Hard Cost 20,039,644 BIM
Advantage Project utilized DProfiler to run
multiple case studies for the owner, including
evaluations of exterior skin systems, floor to
floor heights, and architectural features, prior
to the architect investing time in CAD generated
documents other than architectural renderings and
sketches.
28
Building Type Mixed Use (Condominiums/Parking/Of
fice/Retail) Location Dallas, Texas Gross
Square Feet 430,734 Project Hard Cost
79,741,103 BIM Advantage Owner requested a
high-level conceptual cost estimate, based on
schematic level plan information, and
architectural renderings. Competitive, detailed
cost estimate was returned in 4 days.
29
Building Type Religious/Education Location
Dallas, Texas Gross Square Feet
58,128SF Project Hard Cost 11,994,272 BIM
Advantage Cost estimate accompanied an animated
fly-through of the proposed facility for
fund-raising campaign.
30
Building Type Mixed Use (Office/Parking/Retail)
Location Texas Gross Square Feet
613,894 Project Hard Cost 98,107,251 BIM
Advantage Efficient and effective evaluation of
multiple design iterations with architect prior
to owner making commitment to move forward in the
project.
31
DProfiler with RSMeans
  • RSMeans database
  • Assemblies 18,000
  • Line Items 180,000
  • City Indexed 983 US and Canadian Cities
  • Each line item is indexed
  • Indexes will be updated quarterly and the entire
    database will be updated annually
  • 46 Building Types - Each Building Type will
    consist of pre-mapped DProfiler components to
    RSMeans collections of Assemblies and Line Items

32
Building Types Rev1
33
Building Types Rev2
34
Product Vision
Specialization Level
Micro Model Integration
Analysis Level
Core Level
Data Level
RSMeans
35
DProfiler with RSMeans 2007 Rev3
  • Timberline
  • BIM bridge
  • Energy Analysis

36
QA
37
Contact Information
Stewart Carroll Beck Technology Chief Operating
Officer Tel 214 303 6293 Or Email
StewartCarroll_at_beck-technology.com
Write a Comment
User Comments (0)
About PowerShow.com