Title: BIM
1BIM Project Costing
2Introduction
Stewart Carroll Beck Technology Chief Operating
Officer Tel 214 303 6293 Or Email
StewartCarroll_at_beck-technology.com
3Company Overview
4Owner Driven Changes
Owner
FedEx Speed
Wal-Mart Prices
Shorter Delivery Schedule
Lower Final Cost
Armani Quality
Higher Final Product Quality
5Existing Delivery Solutions
Conceptual Phase
Schematic Phase
Design Development
Construction Documents
Construction Phase
Bid Phase
6The Solution
EFFORT
EFFECT
PD
SD
DD
CD
PR
CA
OP
TIME
Original Graphics Patrick MacLeamy AIA/HOK
7Building Information Modeling
Conceptual Phase
Schematic Phase
Design Development
Construction Documents
Construction Phase
Planning Phase
Micro View
Macro View
8The Beck Group Strategy
Conceptual
SD
DD
CD
CA
Construction
Revit
Navisworks
Innovaya
DProfiler
Timberline
CMIC
9Other Strategies
Conceptual
SD
DD
CD
CA
Construction
Bentley Architecture
Digital Project
ArchiCad
Onuma Planning
US Cost Design Exchange
US Cost Success Estimator
Constructor
10BIM
Macro View
Should I build the project and what is the scope
and financial envelope for the project?
11DProfiler with RSMeans
12BIM
Micro Model
What is the design and how do you document it?
13BIM Micro Model
Conceptual Phase
Schematic Phase
Design Development
Planning Phase
DOWNSTREAM BENEFITS
Engineering Cost Estimates Construction
Schedule As Builts
14The Macro Model
- Use sketches to develop a concept
15The Macro Model
- Very rapidly assemble a Macro Model
16The Macro Model
- Output the Scope, Budget, Assumptions and Proforma
17DProfiler Demo
18Benefit Streamline The Delivery Process
Setting expectations at the outset of a project
by clearly defining the scope and budget
dramatically reduces delivery time and overall
project cost
Design Development
Construction Documents
Construction Phase
Bid Phase
19Benefit Predict Project Cost Early
Provides early, reliable and defendable costing
based on either RSMeans or your own
corporations cost data.
Traditional Estimating 240 Hours (2 estimators
120 hrs) Deliverable project cost
estimate VS DProfiler 20 Hours Deliverable
project cost estimate, and Project
Proforma Design Criteria Document Three-Dimensiona
l Model
92 man hour reduction
1 delta in accuracy
20Benefit Communicate Project Scope
21Benefit Evaluate Project Alternatives
Alternatives can be evaluated to provide
real-time cost comparisons of building envelopes,
MEP systems, structural systems, levels of
interior finish out, alternate sites, different
parking ratios and landscaping proportions.
Granite and Glass Cladding
Glass and Spandrel Glass Cladding
22Example Mid rise office
23Example Municipal Building
24Example MOB
25Example Industrial
26Example Retail
27Building Type Mixed Use (Office/Parking/Retail)
Location Dallas, Texas Gross Square Feet
168,867 Project Hard Cost 20,039,644 BIM
Advantage Project utilized DProfiler to run
multiple case studies for the owner, including
evaluations of exterior skin systems, floor to
floor heights, and architectural features, prior
to the architect investing time in CAD generated
documents other than architectural renderings and
sketches.
28Building Type Mixed Use (Condominiums/Parking/Of
fice/Retail) Location Dallas, Texas Gross
Square Feet 430,734 Project Hard Cost
79,741,103 BIM Advantage Owner requested a
high-level conceptual cost estimate, based on
schematic level plan information, and
architectural renderings. Competitive, detailed
cost estimate was returned in 4 days.
29Building Type Religious/Education Location
Dallas, Texas Gross Square Feet
58,128SF Project Hard Cost 11,994,272 BIM
Advantage Cost estimate accompanied an animated
fly-through of the proposed facility for
fund-raising campaign.
30Building Type Mixed Use (Office/Parking/Retail)
Location Texas Gross Square Feet
613,894 Project Hard Cost 98,107,251 BIM
Advantage Efficient and effective evaluation of
multiple design iterations with architect prior
to owner making commitment to move forward in the
project.
31DProfiler with RSMeans
- RSMeans database
- Assemblies 18,000
- Line Items 180,000
- City Indexed 983 US and Canadian Cities
- Each line item is indexed
- Indexes will be updated quarterly and the entire
database will be updated annually - 46 Building Types - Each Building Type will
consist of pre-mapped DProfiler components to
RSMeans collections of Assemblies and Line Items -
32Building Types Rev1
33Building Types Rev2
34Product Vision
Specialization Level
Micro Model Integration
Analysis Level
Core Level
Data Level
RSMeans
35DProfiler with RSMeans 2007 Rev3
- Timberline
- BIM bridge
- Energy Analysis
36QA