Title: DS8: Overall System Design
1DS8 Overall System Design Preliminary SKA Plan
2DS8 the final product!
- EC SKADS proposal March 2004
- At the end of DS7 a preferred design to
satisfy the multi-field-of-view requirement will
be selected and we will then proceed to a single
system design (DS8).
Now need to cohere with the reference design
3DS8 the final product!
- Whole point of the Design Study
- to find a way to build the SKA which convinces
international community and funding agencies - the DS(-T)s are not are ends in themselves
- Importance of Ownership of the results
- we all have to own the final product
- we need a scheme which produces that and allows
all to contribute - collegiality is very important
4DS8 the final product
- The aim is to produce
- i) an end-to-end architectural and
functional - design for the preferred concept
and a costing, - paying attention to the civil
works required for - the array
- ii) a study of funding sources and
- iii) a preliminary project plan.
- Requires us to pull together the results from
the entire work programme and to incorporate
technology foresight. - The deliverable will take the form of a Square
Kilometre Array White Paper that will contain a
preliminary project plan to be submitted to the
International SKA Steering Committee in 2008.
Now have to cohere with international project
plan
5DS8deliverables and timelines
- DS8-T1 Overall System Design T046
Report - DS8-T2 Preliminary SKA Plan T047.5
Report -
- Overall System Design
- and Preliminary SKA Plan T0
47.5 Combined report
This DS will not be required
until very close to the end of the study
and its format and structure will be decided
closer to the time. (EC SKADS PROPOSAL)
6 SKA timeline
1 SKA Science
International review of design
Legal Entity for SKA Formed
ISSC MoA-2
SKA Complete
Initial concept
10 SKA Science
First SKA Working Group
Site ranking
ISSC MoA-1
Site Selection
Science Case published
2000
92 96 04 05 06 07 08 09 10 14 18 22
2000
Feasibility study
Phase 2 Build 50 SKA
Concept exposition
Define SKA System
SKADS
Design Build SKA pathfinders ATA, KAT
xNTD 1 SKA
Select Reference Design
Phase 3 Build 100 SKA
Phase 1 Build 10 SKA
LOFAR 10 SKA at 100 MHz
7DS8 the final product
- DS8-T1 Overall system design (UMAN) to
optimise the station architectural design and in
terms of scalability, functionality and to
minimise the cost vis-à-vis anticipated
technology changes to produce an end-to-end
architectural and functional design for the
preferred concept. -
- The principal objectives are
- 1) to follow the advice of the Design
Review Committee (DS7) and to use the outcomes of
the technical preparatory work to establish a
multi-parameter cost equation and its derivatives
for a range of station technologies/architectures -
- 2) to examine the most cost-effective
upgrade routes, since SKAs scientific output
will be limited by the processing power available
at any given time.
8DS8 the final product!
- DS8-T2 Preliminary SKA plan (ASTRON) to provide
an overview of the plan from design to
construction, including a study of funding
sources. - There are two main products an
organisational plan and an operational plan. -
- Other issues to be considered include
- 1) industrial partnerships
- 2) an IPR plan
- 3) funding mechanisms
- 4) links with international SKA effort and
possibility of a hybrid - design involving more than one
collector technology. - 5) maintenance requirements of the SKA
- 6) a reliability analysis (assessment of
failure modes) of the SKA - 7) a risk analysis for the entire plan
9The DS8 TEAM
-
- P. Wilkinson (UMAN) - coordinator
- The SKADS Executive Committee
- - The Chairman, vice-chairman of
Board - - The Management Team
- - The leaders of the DS
- - At large S. Rawlings (SWG)
- PLUS as appropriate
- Members of SKADS Board - Experience of
funding/politics/governance -
- (Experience of industrial consultants via DS7
final report) - (Experience of ALMA LOFAR via DS7 final
report) - European SKA outreach members report
production skills
10DS8 the final product!
- Producing the final report
- steps towards this must be
organically linked in with overall - management and month-month
coordination of the DS -
- it is the culmination of these
processes, not a separate entity - -- the report to include all the
EC requirements e.g. including - DS2 results on science scope
and technical specification - -- form of links between DS-Ts
within each DS and between DS - not yet crystallized
- ? premature to be
prescriptive on how the DS8 team will work -
- BUT
- SKADS is self-sufficient for producing DS8
- SKADS DS8 team must work closely with ISPO
11END
12 SKA timeline
1 SKA Science
International review of design
Legal Entity for SKA Formed
ISSC MoA-2
SKA Complete
Initial concept
10 SKA Science
First SKA Working Group
Site ranking
ISSC MoA-1
Site Selection
Science Case published
2000
92 96 04 05 06 07 08 09 10 14 18 22
2000
Feasibility study
Phase 2 Build 50 SKA
Concept exposition
Define SKA System
SKADS
Design Build SKA pathfinders ATA, KAT
xNTD 1 SKA
Select Reference Design
Phase 3 Build 100 SKA
Phase 1 Build 10 SKA
LOFAR 10 SKA at 100 MHz
13The SKADS Executive Committee
- Monitor progress of the SKADS activities against
the milestones agreed by the Board. - Receive progress and financial reports of all
activities via the SMT. - Receive periodic reports from the Design Study
Task leaders. - Act on strategic decisions and recommendations
made by the SKADS Board. - Report to the Board on a regular basis on the
progress of SKADS and on any strategic issues
requiring attention. - Chairman, vice-chairman of Board, the SKADS
management team, leaders of the Design Study
Tasks
14Comments from Dec 20/21 Zandaam Meeting
- System-engineering tasks in DS3/DS4/DS5/DS6 all
to be coordinated by the Project Engineer - A system design team must emerge from system
engineering teams in all other places linked by
the Project Engineer. - In LOFAR the system architecture role is
different from project engineers - the coordinating role ?
the DS7 Project Engineer - the architecture role ?
the DS8 task - In ALMA there is an integrated project team
reporting to central management which includes
the project engineer who is responsible for all
technical work - supported by a lot of system
engineers on the various projects.