Combining ArcView and naUTilus for Municipal Sewers - PowerPoint PPT Presentation

About This Presentation
Title:

Combining ArcView and naUTilus for Municipal Sewers

Description:

Combining ArcView and naUTilus for Municipal Sewers. By: Kimberly Martin ... Overview of naUTilus. Estimate VOC emissions from industrial sewer networks ... – PowerPoint PPT presentation

Number of Views:22
Avg rating:3.0/5.0
Slides: 12
Provided by: mart87
Category:

less

Transcript and Presenter's Notes

Title: Combining ArcView and naUTilus for Municipal Sewers


1
Combining ArcView and naUTilus for Municipal
Sewers
  • By Kimberly Martin
  • CE 394K.3 GIS in Water Resources
  • 21 November 2000

2
Combining ArcView and naUTilus for Municipal
Sewers
  • Background on naUTilus
  • AcrView / naUTilus Link
  • Application to Austin
  • Current Project Status

3
Overview of naUTilus
  • Estimate VOC emissions from industrial sewer
    networks
  • Fundamental Principles
  • Fluid Mechanics
  • Mass Transfer
  • Fortran-based computer model
  • Text-only Input and Output

4
naUTilus Model
  • Sewer Characteristics
  • Branch Diameter
  • Slope
  • Drop Height
  • Node Type
  • Junction
  • Manhole
  • Drain
  • Flow Data
  • Concentration
  • Temperature

5
Downfall of naUTilus
USER FRIENDLY?
No !
6
ArcView / naUTilus Interface
  • Developed by Cindy How
  • 33 Avenue Scripts
  • Graphical User Interface
  • Input Flow Data and Sewer Characteristics

7
Austin Sewer System
  • 70,000 Sewer Stretches
  • 70,000 Manholes
  • Includes Abandoned and Proposed Sewers

8
Sewer Selection
  • Research Project
  • VOC Tracer Studies
  • Model Calibration
  • Large Scale Modeling of Municipal Sewer Emissions

9
Procedure
Injection Point
Sampling Point 1
  • Data Acquisition
  • Use network features in Arc/Info
  • Divide sewer network
  • Apply naUTilus interface in ArcView
  • Estimate missing parameters

Sampling Point 2
Sampling Point 3
To Treatment Plant
10
Anticipated Results
  • Visual display of emission results from OSBL
  • Compare emission values with experimental results

11
Future Work
  • This semester
  • Get the interface working
  • Model first experimental stretch
  • In the next 18 months
  • Model the other three experimental stretches
  • Adjust model as necessary for municipal
    applications
  • Model a large municipal sewer network
Write a Comment
User Comments (0)
About PowerShow.com