Title: w o r l d w i d e
1 First class transport services worldwide
w o r l d w i d e
2 Wasa Logistics Ltd provides first class
transport services. Our speciality is in
project and heavy lift transportation and
together with our dedi- cated partners we build
up a tailor made total logistic solutions for
your demands. Nothing is impossible for us!
w o r l d w i d e
3 Wasa Logistics Ltd is acting as an independent
shipbroker that can offer chartering solutions
of every kind worldwide all depending on the
clients needs. Thanks to our flexibility,
freedom and co-operation with dedicated and
professional carriers, we can meet the clients
expectations for a succesful chartering solution.
w o r l d w i d e
4 Projects past to present
w o r l d w i d e
5 The first commercial shipment from the new
Vuosaari harbour In Helsinki, Finland. Cargo of
2 pcs azipods, weight á 190 tons. Final
destination Germany. February 2007
w o r l d w i d e
6 Transport of two stroke engines, weight 235 ton
From Rijeka to Korea, December 2005.
w o r l d w i d e
7 130 tons engine block exchange at the floating
power station at Haripur, Bangladesh total
logistics by Wasa Logistics Ltd. May 2007
w o r l d w i d e
8 Rail transport of 5 pcs transformers, unit
weight 38 tons and equipment from Finland to
Azerbaijan. November 2005
w o r l d w i d e
9 Barging of 6 pcs 100 tons gensets on the Amazon
river. Final destination Equador. Summer 2003
w o r l d w i d e
10 Transport of 1 gas industrial related equipment,
dimensions 36.62 x 5.01 x 5.21m, weight 133
tons. Czech Republic-Finland. September 2005
w o r l d w i d e
11 Loading of 10 pcs 280 tons engines. Transport
from Trieste, Italy to final destination in
Manaus, Brazil. May 2006
w o r l d w i d e
12- Exhaustgaspipes from Turku, Finland to Vaasa,
Finland. - Including on carriage to the site in Vaasa. May
2005. -
- Lenght 52 m, diameter 4,1 m / 44 tn.
- Lenght 48 m, diameter 4,1 m / 57 tn.
-
w o r l d w i d e
13 Shipment of two stroke engines, weight á 235.000
tons. Transport from Japan to China. September
2005
w o r l d w i d e
14 Roll of operation in Puttalam, Sri Lanka.
Totally abt. 8300 cbm of project cargo were
shipped onboard the heavy lift vessel, barging
and road transport to the project site.
February 2004
w o r l d w i d e
15 Loading of project cargo. Transport from
Finland, final destination Brazil. Spring 2006
w o r l d w i d e
16 Delivery of a boiler plant from Europe and
Brasil to CMPC Miminco, Chile Photo showing
delivery of one 30 ton boiler drum, transported
by trailer from Sertaozhinho, over the Andes to
Miminco, Chile. Spring 2005 - 2006
w o r l d w i d e
17 Delivery of 6 pcs tanks, weight á 150 tons. From
FCA Pietarsaari, Finland to CPT job site
Antwerp, Belgium. March 2007
w o r l d w i d e
18 Loading of pump units 4 pcs, á 27 tons in
Praque, Czech Republic. Airfreight to final
destination in Khartoum, Sudan. March 2005
w o r l d w i d e
19 Loading and seafreight of floating marine
pontons, weight á 30 tons. Transport from
Finland to Vigo, Spain. Summer 2005
w o r l d w i d e
20 Unloading in Kingston, Jamaica a floating power
barge, weight 6000 tons. January 2006
w o r l d w i d e
21 Discharge and transport to final destination in
Finland of 4 pcs separators, weight á 120
tons. January 2006
w o r l d w i d e
22 Loading, seafreight and discharge of a yacht,
weight 42 tons. April 2007
w o r l d w i d e
23 Transport, lifting installation and project
handling of a colonne, weight 80 tons L36,5m x
Ø 4,55 from Pietarsaari, Finland to Ånge,
Sweden. April 2005
w o r l d w i d e
24 Transport of 6 pcs windmill blades, á 49.0 x 4.0
x 2.7m, weight á 12 tons. From Stettin, Poland
to Oulu, Finland. May 2007
w o r l d w i d e
25 Project cargo for South Russia, diesel power
plant. Totally 120 different rail cars. Autumn
2006
w o r l d w i d e
26 More information, visit www.wasa-logistics.com
w o r l d w i d e