Title: A Productive Past An Exciting Future'
1A Productive PastAn Exciting Future.
22009 Gold Exploration Program
3Excellent District Position
4Exploration Potential
- Several areas are open along strike in addition
to new discoveries in the Geraldton/Beardmore
Camp - Parallel structures to Northern Empire Mine
- Leitch-Sand River gold mine property
- Nortoba-Tyson gold veins
- Hardrock Project (funded by Premier Gold as
operator)
5Beardmore Camp
6Northern Empire Gold Mine Property
7Northern Empire Airborne Survey
8Northern Empire Exploration Targets
9Northern Empire Exploration Program
10Northern Empire New Structure
11Main Structure
12TSXV RMK
13TSXV RMK
14TSXV RMK
15Leitch-Sand River Mine
- Leitch-Sand River Mine (Now 100 owned)
- Historical production of 847,000 ounces with an
average grade of 0.92 ounces per ton - Records show that as the mine went deeper, both
the grades and width increased - Below 30th level, some intercepts showed grades
exceeding 2 ounces per ton over 2 feet - Roxmark consolidated land package in 2009
16Leitch-Sand River Property
17Leitch-Sand River Property
18Leitch-Sand River Mine
- Leitch-Sand River Mine (Now 100 owned)
- Historical Resource 737,000 ounces of gold
(2,336,000 tons grading 0.315 ounces per ton) - Development targets based on historic production
data - Surface drilling - 16 vein 3.02 oz/t Au over 4
feet - 8th level drift assays grading 1.53 oz/t Au
over 0.62 feet with a 822 foot strike. - 30th level drift assays grading 1.47 oz/t Au
over 2 feet with a 280 foot strike - 30th level diamond drill hole intersected 2.04
ounces per ton gold over 2 feet (about 100 feet
below level).
non-NI43-101 compliant
19Leitch Mine 3D model
20Nortoba-Tyson Gold Property
21Nortoba-Tyson Gold Property
- Drilling Highlights (2008)
- Significant gold intersections
- NT08 01 Vein No. 2 10.1g/t over 0.50 m
- NT08 02 Vein No. 2 8.8g/t over 0.30 m
- NT08 03 Vein No. 2 12.4g/t over 0.70 m
- Grab samples (2006) from the bottom of the
previous bulk sample area assayed at values
ranging from 0.17 to 7.64 oz/t Au. - Historical bulk sample (1964) produced 139 ounces
of gold from a 135 ton sample, an average of 1.03
oz/t Au.
22Premier Gold/Roxmark Joint Venture
23A Productive PastAn Exciting Future.
24Forward-Looking Statements
- Certain information in this presentation contains
forward-looking statements that are based on the
Company's current expectations and estimates
which it believes, expects or anticipates will or
may occur in the future (including, without
limitation, statements regarding the Company's
plans with respect to the exploration and
development of the Nortoba-Tyson property).
Forward-looking statements are frequently
characterized by words such as "plan," "expect",
"project", "intend", "believe", "anticipate",
"estimate" and other similar words or statements
that certain events or conditions "may" or "will"
occur, and include, without limitation,
statements regarding potential mineralization and
resources, exploration results and future plans
and objectives of the Company. Such
forward-looking statements involve known and
unknown risks, uncertainties and other factors
that could cause actual events or results to
differ materially from estimated or anticipated
events or results implied or expressed in such
forward-looking statements. Factors that could
cause such differences include changes in world
gold and molybdenum markets and equity markets,
changes to regulations affecting the Company's
activities, uncertainties relating to the
availability and costs of financing needed in the
future, the uncertainties involved in
interpreting drilling results and other
ecological data, delays in the development of
projects and the other risks involved in the gold
and molybdenum exploration and development
industries. Any forward-looking statement speaks
only as of the date on which it is made and,
except as may be required by applicable
securities laws, the Company disclaims any intent
or obligation to update any forward-looking
statement, whether as a result of new
information, future events or results or
otherwise. Forward-looking statements are not
guarantees of future performance.
25Investment Highlights
- Targeted 20,000 ounces annual gold production
from Northern Empire Mine starting 6 months from
close of financing 10 million - Additional potential of 79,000 ounces annual gold
production from Leitch-Sand River mine beginning
in 4 years - Increasing grades at depth
- 30 carried interest in Hardrock project, 1
million ounce historical gold resource
26Share Structure (TSXV-RMK)
27Roxmark Mining Team
- Philip F. Cunningham, Chairman, Director. Former
Executive Vice President of Mackenzie Financial
Corp. and Chairman of Mackenzie Financial
Services Inc. - Monir Younan, President, Director. Has over 35
years of experience in mining in Canada,
including exploration, development and operation
for both gold and base metal mines, including 16
years at Nanisivik Mines Ltd and 5 years at
Chibex Ltd. He holds a B.Sc. in mining
engineering. - Paul Brugger, P. Eng., Consulting Engineer. Has
over 33 years of mining experience. From 1994 to
present under contract with Barrick Gold Corp.
From 1986 to 1992 was project manager supervising
the reopening of the Northern Empire Mine.
28Roxmark Mining Team
- Peter Bevan, P.Eng., Independent Consulting
Mining Geologist. Has over 44 years of experience
in surface and underground mining. - Glenn Hart, Staff Geologist. Has been with
Roxmark since 2006 - David Salari, P Eng Consulting Metallurgist of
DENM Engineering. Has over 25 years of experience
in the mining and mineral processing field. - Richard Robert, Mill Superintendent from 1982 to
1992 and also since 2006. Prior to 1982, worked
in the gold mill of Pamour Porcupine Gold Mine
(Noranda Inc.), a 3000 ton per day mill.
29Excellent District Position
- Located in Beardmore-Geraldton mining district of
Ontario - Historic production of over 4 million ounces in
region - Trans-Canada highway passes through property
- Access to grid power, water
- Fully operational mill on site
- Beardmore Township located within one kilometre
TSXV RMK
30Town of Beardmore
31Town of Beardmore
32Existing Mining Infrastructure
- Established gold camp
- Underground workings
- Northern Empire Mine
- 2,460 foot shaft
- 28,550 feet of drifts on 10 levels
- Historical resource 121,000 ounces
- Leitch-Sand River Mine
- Leitch shaft 3,006 feet, winze from 19th to 30th
level to depth of 4,560 feet - Sand River shaft 2,656 feet
- Combined drifts and levels of 59,000 feet
- Historical resource 737,000 ounces
non-NI43-101 compliant
33Existing Mining Infrastructure
- Current replacement value of approximately 100
million - Fully permitted 200 tons-per-day operational mill
at Northern Empire Mine - Upgradable to 1,000 tons-per-day in year 3
(current replacement value 12 million)
34Gold Production Plan
- Northern Empire Mine (100 owned)
- First six months, build ramp to access NI 43-101
resource - Annual production of 20,000 ounces gold in first
two years from NI 43-101 resource (Bevan, 2008) - Head grade of 0.33 ounces per ton
- Target historical resource for continued
production
35Northern Empire Longitudinal Section
Early Production Area
Open at Depth
36Gold Production Program Timeline
37Northern Empire Mine 3D Model
TSXV RMK
38Northern Empire Mill
A 200 tons per day permitted mill to process gold
and moly expandable to 1,000 tons-per-day. Built
in 1982 - gravity and flotation circuits added in
2005 and 2006.
39Northern Empire Mill
40High Grade Historic Production
- Leitch-Sand River Mine (100 owned)
- Historical production of 847,000 ounces with an
average grade of 0.92 ounces per ton - Was closed due to a land dispute with the
neighbour. Roxmark consolidated land package in
2009 - Records show that as the mine went deeper, both
the grades and width increased - Below 30th level, some intercepts showed grades
exceeding 2 ounces per ton over 2 feet - Targeted 79,000 ounces annual production
41Leitch Mine 3D model
Open at depth 4,525 feet
42Use of Proceeds for Production
43High Grade Historical Production
Roxmark owns over 95 of past producing mines in
region Total production of 4,097,000 million
ounces
44Gold Production by Camp
45Ontario Gold Camps
46Comparative Mining Depths
Kirkland Lake Abitibi Timmins Red
Lake Hemlo Pickle Lake
Other Mining Camps
Beardmore Mining Camps
Leitch Sand River N. Empire
Explored
Mine Depth
2,460 ft
2,656 ft
Exploration Depth
3,005 ft
3,700 ft
4,000 ft
Potential Discovery at Depth
6,750 ft
7,200 ft
7,500 ft
8075 ft
47Premier Gold/Roxmark Joint Venture
48Premier Gold/Roxmark Joint Venture
- Premier Gold market cap 200 million PG-V
- 8 million in 2009 exploration by Premier Gold,
project operator - 30 carried interest for Roxmark
- Historical production from the property was in
excess of 3.0 million ounces of gold. - 50,000 metre drilling program with four drills to
delineate resources analysts estimate 1.75
million ounce resource in Q4 09. - Open-pit, underground development
- Interim cash, share payments to Roxmark
49Investment Highlights
- Targeted 20,000 ounces annual gold production
from Northern Empire Mine starting 6 months from
close of financing 10 million - Additional potential of 79,000 ounces annual gold
production from Leitch-Sand River mine beginning
in 4 years - Increasing grades at depth
- 30 carried interest in Premier Golds Hardrock
project, 1 million ounce historical gold resource
50A Productive PastAn Exciting Future.