Title: Consultation Workshop Webcast
1ConsultationWorkshop/ Webcast 2Revised (Phase
1 2) Waste Electrical Electronic Equipment
(WEEE) Program Development
Slide 1
2Welcome!
- In-person 60
- Webcast 250
- slides advance automatically
- enlarge slide
- email box for questions/comments on left side of
webcast console - use any time
- please include name affiliation
- Archived webcast available for 6 months
Slide 2
3Todays Agenda (1)
- Consultation process
- Update on Phase 1 Program implementation
- Designated Materials Definitions
- Enhancements to the WEEE Program
- Baseline data targets
- Questions answers
- Break
Slide 3
4Todays Agenda (2)
- Program costs preliminary budget
- Changes to the fee-setting methodology
- Preliminary Steward fees
- Questions answers
- How to provide feedback comments
Slide 4
5Draft Preliminary Revised WEEE Program Plan
- Consolidated program to address Phase 1 Phase
2 WEEE - Benefits
- deliver single integrated program
- greater efficiency for Stewards service
providers - Final deliverable Revised WEEE Program Plan
- due to Minister of the Environment July 10, 2009
- several interim deadlines to be met
Slide 5
6Plan Submission Timelines
Slide 6
7Progress to Date
- January 21, 2009 Document for Consultation
posted to OES website for comment - February 4, 2009 Consultation 1
- preliminary Consultation Report on OES website
- includes all comments received to date
- April 23, 2009 Draft Preliminary Revised (Phase
1 2) WEEE Program Plan posted for comment - Ongoing review with MOE WDO
- Stewards providing industry information
See www.ontarioelectronicstewardship.ca
Slide 7
8Objectives of Todays Consultation
- Update key stakeholders
- Encourage continued engagement in plan
development process - Receive program comments questions answers
input through survey tool - Outline key changes resulting from stakeholder
feedback to date - Outline proposed enhancements to WEEE Program
- Present preliminary Year 1 budget preliminary
Steward fees for consultation
Slide 8
9Next Steps
- Thursday May 7 Deadline for comments
- Comments to be addressed in development of final
Preliminary Program Plan - to be submitted to WDO on May 15, 2009
Access to OES Consultation Survey tool
www.ontarioelectronicstewardship.ca
Slide 9
10Update on Phase 1 Program Implementation
- Carol HochuExecutive Director, OES
Slide 10
11Successful Launch of Phase 1
Slide 11
12WEEE Being Diverted From Landfill
- Key performance measures as of April
- 240 applications to be collection sites
- 2 processors approved 8 in different stages of
review - gt60 tractor trailers of WEEE sent for processing
Slide 12
13Successful Launch of the Phase 1 Program
- Do What You Can website www.dowhatyoucan.ca
- 25K visitors in 1st 5 days (to April 5)
- 66K visitors through April 29
- Collection options
- 17 participating municipalities serving 2.5M
households - another 2 dozen pending ?adds nearly 900K more
households - 37 Salvation Army Thrift Stores - Windsor to
Ottawa - 14 round-up events at SEARS Eastern ON stores
Saturday, April 25 - 17 trailers of WEEE collected
- 17 Staples in Southwestern ON to begin May 1
Slide 13
14Clutter Ad
Slide 14
15Gulls Ad
Slide 15
16In the Months Ahead
- Continue to approve OES collection site expand
accessibility - Complete a Northern ON tour to approve add
collections sites - Approve OES reuse refurbishment sites
- Plan OES round-up events to fill gaps in
accessibility - Initiate RD activities under Phase 1
Slide 16
17Preliminary Revised (Phase 1 2) WEEE Program
PlanPlanning Development
Slide 17
18Reminder
- EEE Electrical Electronic Equipment
- designated materials for which Stewards must
report pay fees to OES - WEEE Waste Electrical Electronic Equipment
- waste EEE which OES responsible to manage in
accordance with specifications outlined in WEEE
Program Plan
Slide 18
19Material Categories Definitions
- Stakeholder feedback comments included
- modification to language in EEE definitions
- combined or separated EEE categories
- clarification on inclusions exclusions
Slide 19
20Rationale for Changes to Definitions
- Group products with successive technology
- 8 track ?cassette ? CD ? digital players
- Recognize technological convergence
- combined printer, fax, phone, scanner
- Moderate fee impact due to changing consumer
preferences trends - selling gt40" flat screen TVs today recovering
older CRT TVs - Harmonization with Steward definitions
reporting other provinces
Slide 20
21Revised Definitions
- Additional modifications due to proposed changes
to Program Plan revised data sources
Revisions included in new Proposed Material
Categories Definition Handout 1 Also
available at consultation page of
www.ontarioelectronicstewardship.ca
Slide 21
22Changes to Material Categories Definitions
- Separated Printing Devices from Copiers
Multi-Function Devices - Combined Televisions Monitors into single
Display Devices category - differentiated by 29" or gt 29" screen size
- Combined Portable Desktop Computers into single
Computers category - Refined scope of
- Telephones Telephone Answering Machines
- Computer Peripherals
- Cellular Devices
- Re-integrated EEE designed for commercial
applications (more to follow)
Slide 22
23Potential Impact of Changes
- Changes to Steward reporting
- revised categories for Steward reporting
- changes to Phase 1 WEEE product fees on revised
plan commencement date - new product fee categories
- inclusion of EEE for commercial applications
- Changes to program operations
- new collection strategies techniques required
for some categories - different sorting packaging requirements for
collection sites - Changes to overall WEEE Program design
- greater flexibility to incorporate flows of WEEE
to increase accessibility diversion
Slide 23
24Feedback Requested
- Please review proposed changes to
- EEE categories
- definition language
- scope of inclusions exclusions
- Questions or comments welcome during QA or
through written submissions - Submit comments suggestions online
OES Consultation Survey Tool www.ontarioelectronic
stewardship.ca
Slide 24
25Enhancements to the WEEE Program
Slide 25
26Program Enhancements
- Revised WEEE Program Plan
- builds on experience gained from Phase I
implementation - incorporates stakeholder feedback from
Consultation 1 - addresses unique collection needs for certain
Phase 2 WEEE - improves program flexibility
- increases WEEE diversion options
Slide 26
27Key Changes
- New collection channels to be incorporated under
OES program - Increased flexibility on WEEE packaging
requirements - Revised Draft Electronics Recycling Standard for
primary processors - Revised methodology for allocating WEEE to
approved primary processors
Slide 27
28Handout 2 Overview of WEEE Program Design
Preliminary Flow of Materials OES Funding
Slide 28
29New Diversion Opportunities
- Direct-shipment
- between WEEE generation sites OES-approved
processors - Increased flexibility for WEEE collectors
- approved collectors to provide a range of
services to WEEE generation sites - Steward self-management
- incorporate Steward self-management programs into
OES program
Slide 29
30Direct-Shipment Option
Handout 2
Slide 30
31Direct-Shipment Option
- Accommodates direct shipment of WEEE from
generation site to OES-approved processors - Allows registered WEEE generation sites to
maintain existing business relationships - If pre-approved by OES, WEEE generator will be
reimbursed for processing costs incurred if sent
to OES-approved processor - OES will not cover transportation or other
value-added costs for direct-ship arrangements
Slide 31
32Steward Self-Management Option
Handout 2
Slide 32
33Steward Self-Management Option
- Stewards operating separate WEEE EOL management
programs may be incorporated in OES program - more accurate tracking of total diversion
- Stewards already managing these program costs
- lease-return cell phone return programs
- Approval required by OES
- as outlined in draft Preliminary Revised Program
Plan - Stewards approved to self-manage WEEE must remit
Program Compliance Fee - cover share of common costs to discharge Steward
obligations
Slide 33
34Increased Flexibility for Collection
Generation Sites
- Collection sites may use any OES-approved
containers - provided by OES
- allow for handling options other than sorting
packaging requirements prescribed under Phase 1 - Collection incentive (165/tonne) to offset WEEE
handling costs - cost allocation under Phase 1 to be completed
- Maintaining existing sorting packaging groups
- OES-approved collectors/collection agents may
provide services to other generation sites
New Group
Slide 34
35Approved Collectors/Collection Agents
Handout 2
Slide 35
36Approved Collectors/Collection Agents
- Registered WEEE generation sites that do not meet
OES sorting packaging can participate in
Program - OES-approved collectors may
- provide sorting packaging services to meet OES
requirements - direct WEEE to OES consolidation centre
- receive payment of OES collection incentive
- Commercial arrangements can be made directly
between registered generation sites
OES-approved collectors - no OES involvement required
Slide 36
37Revised WEEE Allocation Methodology
- Allocate only WEEE received at OES consolidation
centres - Competitive RFP process with revised criteria
- Recycling Rate 50 weighting
- Price 30 weighting
- Innovation capacity 20 weighting
- Discontinue regional allocation approach
- Allocation of WEEE by material (display devices
combined computers other WEEE) - Extend contract length to 36 months
- OES retain direct control of up to 20 of
collected WEEE - RD start-up testing of new processing
equipment, other applications
Slide 37
38Reuse Refurbishment Standards
- Clarified original language to close potential
loophole - updated Appendix 8a (Section 4.1 4.2)
- Export for reuse /or refurbishment allowed only
where product performs same function(s) for which
it was originally designed - Other minor language changes
Input welcome through OES Consultation Survey
Tool www.ontarioelectronicstewardship.ca
Slide 38
39New Draft Electronics Recycling Standard (ERS)
- ERS defines environmentally-sound recycling
criteria as basis for processor audits - based on Electronic Product Stewardship Canada
(EPSC) national approach - developed with industry ENGOs
- requirements for environmental management,
occupational health safety, downstream
accountability for waste - expanded range of materials prohibited from
export to non-OECD/non-EU countries
Slide 39
40Modified ERS Requirements
- New requirement to remove batteries, mercury
bulbs ink toners cartridges - Maintain documented closure plan with adequate
financial measures - Cover any materials stored outside to prevent
exposure to elements - Regular independent review of data destruction
processes - Additional requirements outlined in Draft ERS
Slide 40
41Responsibility for Managing Materials Remains
with Designated IFO
- Batteries, fluorescent bulbs tubes, mercury
switches designated under MHSW program - Stewardship Ontario will have legal obligation
for these materials as designated MHSW IFO - WEEE processors encouraged to register as MHSW
collection sites upon revised MHSW Program Plan
approval - Administrative procedures will be developed
between OES Stewardship Ontario - reporting requirements
- reconciling material management costs
Slide 41
42Providing Input to Program Enhancements
- Review key proposed program enhancements
- new collection channels opportunities
- flexibility for collection sites collectors
- revised allocation methodology for WEEE for
processing - changes to the 2 standards
- Questions or comments during QA
- Submit comments suggestions online
OES Consultation Survey Tool www.ontarioelectronic
stewardship.ca
Slide 42
43Baseline Data Performance Targets
Slide 43
44Baseline Data Performance Targets
- Revised Plan based on best available data
- new inter-provincial study of WEEE commissioned
for 3 provinces ESABC (BC), SWEEP (SK), ACES
(NB) - revised data on products supplied into ON
extrapolated from national data - use of limited data available from Phase 1
program - revised OES assumptions about material flow
- Steward self-management
- Direct-ship
Slide 44
45Program Accessibility
Baseline232 permanent sites across 4 ON regions
Detailed Accessibility Targets outlined in
Section 5.1.1 of the Preliminary Revised WEEE
Program Plan
Slide 45
46Initiatives to Increase Accessibility
- Accessibility to collection services includes
- Permanent depots (municipal or non-municipal)
- Event based collections (quarterly, bi-annual,
annual) - Variety of accessibility opportunities
- curbside collection (e.g. Toronto)
- multi-family collection (new collection vehicle
to serve MF) - property management (tenants/employees)
- universities/colleges (students)
- Steward take-back returns
- material managed through Steward self-manage or
direct-ship
OES Consultation Survey Tool www.ontarioelectronic
stewardship.ca
Slide 46
47Projected WEEE Supplied for Use in Ontario
Detailed WEEE supplied for Use in ON outlined in
Section 3.1 of Draft Preliminary Revised WEEE
Program Plan
Slide 47
48Projected WEEE Available for Collection
Detailed WEEE available for collection outlined
in Section 3.2 of Draft Preliminary Revised WEEE
Program Plan
Slide 48
49Material Flow Assumptions
- Draft plan assumes 100 of WEEE collected at
OES-approved collection sites - most conservative financial planning assumption
- Feedback requested on
- appropriate estimate of of WEEE to flow via
Steward self-management channels - appropriate estimate of of WEEE to flow via
direct-shipment channels
OES Consultation Survey Tool www.ontarioelectronic
stewardship.ca
Slide 49
50WEEE Collection Set to Increase
Detailed WEEE Collection Targets outlined in
Section 5.1.4 of the Preliminary Revised WEEE
Program Plan
Slide 50
51Quantities of WEEE Recycled Also Increase
Detailed WEEE Recycling Targets outlined in
Section 5.1.5 of Preliminary Revised WEEE
Program Plan
Slide 51
52Feedback on Data Targets
- Please review preliminary data targets
- accessibility to collection sites
- projections of EEE supplied WEEE available for
collection - assumptions for of WEEE flowing via new
channels - targets
- Questions or comments welcome during QA
- Submit comments suggestions online
OES Consultation Survey Tool www.ontarioelectronic
stewardship.ca
Slide 52
53Questions?
Slide 53
54After the Break
- Preliminary Program Costs Budget
- Revised Fee-Setting Methodology
- Preliminary Steward Fees
Slide 54
55Break
Slide 55
56Welcome Back!
Slide 56
57Next Topics
- Preliminary program costs budget
- Revised Fee-setting methodology
- Preliminary Steward fees
- How to provide feedback comments
Slide 57
58Program Costs Preliminary Budget
Slide 58
59The Big Picture
- Program costs increasing due to
- increased range of WEEE included
- 24 new materials (now 44 in total)
- all different sizes weights
- accessibility for Ontarians improving
- more collection points
- opportunities for services through approved
collectors - greater access to WEEE generated in
industrial/commercial/institutional (ICI) sector
- increasing tonnes of WEEE managed with more
materials collected, transported processed
Slide 59
60Budget Estimates Preliminary Only
- Recommend conservative approach for potential
program costs - economic conditions uncertain
- 100 of ON collected WEEE assumed to be managed
under OES program - Final draft plan to make assumptions on percent
of WEEE likely to be managed through
direct-shipment Steward self-management
channels - reduce program cost estimates
Seek input on appropriate assumptions for percent
of WEEE in direct-shipment Steward
self-management channels
Slide 60
61Rationale for Display Devices
- Used rationale from inter-provincial study
- Display devices combined into a single category
with 2 sub-categories on the basis that - computer monitors are typically 29" in size
- new television sales are trending towards gt29"
- commercial displays look like a television but do
not have a tuner - display devices without tuners are being sold as
televisions - large percentage of televisions collected for
recycling are 18"-29"
Slide 61
62Aligning Costs
- Need to align costs for handling televisions to
reside with television Stewards selling larger
units - OES shifted costs for televisions 29" to the new
gt29" display sub-category for purposes of setting
fees - Monitor costs are isolated fees are reflected
in new 29" display device category
Slide 62
63Collection Incentive Payment at 165/tonne
- Detailed activity-based costing yet to be
initiated - consider including Phase 2 materials now
- limited experience in Phase 2 material (NS)
- Recession impacts on cost drivers
- fluctuating operating costs (fuel, rents, etc.)
- Collection site registration on target to meet
Year 1 goals
Slide 63
64Cost Assumptions for Preliminary Budget
Slide 64
65Projected Year 1 WEEE Management Costs
Assumes 100 of WEEE material is collected at
OES-approved collection sites managed under OES
WEEE management system. These estimates may be
revised in Draft Final Program Plan.
Slide 65
66Other OES Year 1 Program Costs
Slide 66
67Preliminary Year 1 Budget
Note Assumes 100 of WEEE material is collected
at OES-approved Collection sites managed under
the OES WEEE management system. These values may
change.
Slide 67
68Feedback on Costs Preliminary Budget
- Please review costs preliminary budget
- cost assumptions factors
- costs to manage WEEE in first year of Program
- other Costs in first year of Program
- preliminary Year 1 Budget
- allocation of WEEE likely to be managed via
direct shipment Steward self-management - Questions or comments welcome during QA
- Submit comments suggestions online
OES Consultation Survey Tool www.ontarioelectronic
stewardship.ca
Slide 68
69Still Under Development
- Revised Program Agreement being prepared by WDO
- OES governance model under review
- may provide up to 2 additional seats for
directors - criteria under consideration include
- experience skills that can contribute to Board
Program effectiveness - knowledge of obligated Phase 2 EEE not currently
represented on Board
Slide 69
70Revised Fee-Setting Methodology
Slide 70
71Stewards will Report Remit Fees
- Proposed EEE Sub-Categories
Slide 71
72Key Issues for Fee-Setting
- Program compliance fee to reflect lower costs
associated with WEEE self-management options to
be included under Revised WEEE Program Plan - Costs to manage obsolete WEEE to be allocated to
Steward fees of successive EEE technology - Allocating Phase 1 Program development costs
across both Phase 1 Phase 2 Stewards - Allocating Revised Phase 1 2 Program Plan
development implementation costs to all
Stewards - 3-year period to incorporate financial surplus or
shortfall in subsequent fee calculations
Slide 72
73Overview of Revised Fee Structure
- Different cost categories to reflect OES
services - identification allocation of WEEE plan
development costs - payable by all Stewards
- costs for managing WEEE under the program
- payable by all Stewards whose material managed by
OES - includes all common costs material-specific
management costs - program compliance fee only
- payable by Stewards managing their materials but
using OES compliance services - includes share of compliance common program
costs - other material-specific management costs managed
directly by Stewards
Slide 73
74Primary Differences from Phase 1 Program Fees
Phase 1 Plan One Fee Covering All OES
Activities Expressed /unit
Slide 74
75Consolidated Plan2 Options
Option 1 Full OES Service All-in Fee Expressed
/unit
Option 2 OES Compliance Only Fee Expressed
/Steward
Slide 75
76Option 1 Standard All-in Steward Fee
- For designated WEEE managed by OES on behalf of
the Steward - Includes all OES program costs
- Expressed as /unit
- Common costs will be incorporated into standard
all-in fee for full OES service option - allocated as per all common costs
- 85 based on direct costs 15 shared equally
among material categories
Slide 76
77Standard All-in Steward Fee Includes
- Plan development costs
- Common start-up costs such as
- development of protocols standard agreements
- development of material tracking system (MTS)
- OES program administration costs related to
- Steward registration, reporting, payment of fees
- cost allocation fee setting
- reporting material overall program performance
- OES governance
- Material-specific costs for
- registration contracting with collection,
transportation, consolidation processing
service providers - RD
- Do What You Can website
- External charges (e.g. WDO administration MOE
enforcement)
Slide 77
78Option 2 Program Compliance Fee
- For Stewards approved for self-management of
specified WEEE - Based on share of cost for OES to monitor
report Steward compliance overall program
performance - Operational costs not included
- paid directly by Stewards operating approved
self-managed programs - Only Program Compliance Fee allocated to Steward
self-managed materials - calculated/assessed as fixed cost-per-Steward
Slide 78
79Program Compliance Fee-Includes
- Plan development costs
- Common start-up costs
- OES program administration costs related to
- Steward registration, reporting, payment of fees
- Cost allocation fee setting
- Reporting material overall program performance
- OES governance
- External charges
- WDO administration MOE compliance activities
Slide 79
80Recovery of Phase 1 Program Plan Costs
- Delivering Revised WEEE Program includes
repayment of costs for Phase 1 program
development start-up - Phase 1 Program fees designed to recover plan
development start-up costs in Year 1 3M - Some Phase 1 Program development start-up costs
will be shared across Phase 2 EEE - Redistributing Phase 1 Program development
start-up costs - may result in a credit to Phase 1 EEE fees
Slide 80
81Revised Program Development Cost
- Development start-up costs of Revised WEEE
Program Plan will be allocated
- to all materials according to level of activity
attributable to those materials - across all materials according to 85 direct cost
15 equal share of common costs
Slide 81
82Allocating Costs to Successive Technology
- OES Fee-setting guiding principle
- The costs associated with the management of
obsolete WEEE will be allocated to the Steward
Fees for the successive technology - the obligated EEE device that followed and/or
replaced, totally or in part, the function or
intended purpose of the WEEE device.
Slide 82
83Allocation of Surplus or Shortfall
- Surplus or shortfall beyond amount prescribed
material specific investments - allocated to Stewards over 3 years
- intent to moderate any changes to Steward fee
rates
Slide 83
84Preliminary Steward Fees (/unit)
Assumes 100 of WEEE collected managed via
OES WEEE management system. Values may change.
Slide 84
85Key Issues Under Review
- Are the proposed EEE categories appropriate?
- Grouping of monitor televisions under display
devices - Grouping of portable desktops under single
computer - Separation of printing copier devices
different fee rates for - desktop floor-standing Printing Devices
- desktop floor-standing Copiers Multi-Function
Devices - Planning projections to use for quantity of WEEE
under Steward self-management - e.g. many floor-standing Printing Devices /or
Copier Multi-Function Devices are managed
through existing Steward self-management channels - Allocation of compliance costs within All-in Fee
Slide 85
86Preliminary Fees Will Change!
- Before submitting Draft Preliminary Revised Plan
to WDO, OES will - incorporate industry feedback regarding
assumptions about WEEE flowing through new
channels - Steward self-management ?
- direct-shipment ?
- assess need to modify EEE categories reduce fee
disparity for Printing Devices Copiers
Multi-Function Devices - consult with Stewards about option of Program
Compliance Fee for Stewards approved for WEEE
self-management channel
Slide 86
87Request for Feedback on Fee-Setting
- OES seeks your feedback insight on
- revised fee-setting methodology
- differentiated fees
- preliminary Steward fees
OES Consultation Survey Tool www.ontarioelectronic
stewardship.ca
Slide 87
88Questions?
Slide 88
89Closing Items Reminders
Slide 89
90Looking Forward
- Revised plan to be submitted July 2009
- 2 to 4 weeks to post on Environmental Registry
for comment - 30 to 90 day comment period
- MOE review approval time unknown
- Revised plan approval
- earliest late September 2009?
- possibly December 2009 or later?
Slide 90
91Consultation Survey Tool
- New method to submit feedback comments on
issues in - Workshop/ Webcast
- Document for Consultation
- Access survey tool at OES website
www.ontarioelectronicstewardship.ca
Slide 91
92Accessing the Survey Tool
- Access from OES home page or via Consultation page
Slide 92
93Completing the Survey
- First page outlines survey submission process,
tips other information
Slide 93
94We Want to Hear from You!
- Provide your comments to OES
- Include comments questions
- Upload files documents
- Help OES obtain industry data information
Consultation Survey www.ontarioelectronicstewardsh
ip.ca
Slide 94
95Reminder
- Comments feedback required by May 7
- Draft Preliminary Revised WEEE Program Plan
- Workshop/Webcast 2 (today)
- Preliminary Revised (Phase 1 2) WEEE Program
Plan submitted to WDO May 15
Slide 95
96Thank you!