Cisco Wiring Project First Baptist Church - PowerPoint PPT Presentation

1 / 24
About This Presentation
Title:

Cisco Wiring Project First Baptist Church

Description:

1 copier. 8 Network cards. Currently using sneakernet. Identify Needs ... 3 Copier 127 8 Lois 94. 4 Pastor Scott149 9 Pastor Dave 198. 5 Pastor Dan 178 10 Robin 143 ... – PowerPoint PPT presentation

Number of Views:75
Avg rating:3.0/5.0
Slides: 25
Provided by: Roy9165
Category:

less

Transcript and Presenter's Notes

Title: Cisco Wiring Project First Baptist Church


1
  • Cisco Wiring Project First Baptist Church

Designed by Roy Harding
2
History of First Baptist Church
  • 1843 ? First Organized
  • 1848 ? First church built on corner of North and
    East Streets
  • Steady growth required a new building

3
History of First Baptist Church
  • 1890 ? New building dedicated with 225 members
  • 1971 ? 17 acres of land dedicated on West
    Maitland Lane
  • 1974 ? Final service in the N. E. St. building

4
History of First Baptist Church
  • 1974 ? May 5th 36,381sq.ft. building dedicated
    cost 1.3 million accommodates 800 members
  • 1980 ? Mortgage burned
  • 1991 ? Youth complex was dedicated

5
Current Status of FBC
  • 2000 ? 800 Members
  • 4 Pastors
  • 6 Support staff

6
Current Status of FBC
  • 2 Services at 900 a.m. 1045 a.m.
  • Live radio broadcast1100 a.m.- 1200 noon WBZY
    1280

7
First Baptist Churchs Vision
  • Place of Hope Grow
  • People Matter to God
  • Personal Relationship with God
  • Environment of Hope
  • Growth Producing Relationships

8
Projected Growth
  • Proposed renovation in 2002
  • Church facilities
  • Youth building
  • Hiring of Pastor of Young Adult Ministries

9
Analysis and Assessment of Current and Projected
Resources and Needs
  • 9 Personal computers
  • Operating systems Windows 95 98
  • 8 DeskJet printers
  • 1 Shared laser printer
  • 1 copier
  • 8 Network cards
  • Currently using sneakernet

10
Identify Needs
  • Projected growth in church staff
  • Share data and resources
  • Centralized data backup system
  • Internet access
  • Email

11
Constraints of the Church
  • Financial resources 1,000
  • Computer skills
  • Attitudes to networking
  • Proposed renovations

12
Walkthrough
  • Locate MDF
  • Locate POP
  • Check ceilings walls
  • Check distances

13
Network Design
  • Ethernet IEEE 802.3 Cat 5 UTP Cable
  • Logical Bus
  • Physical Star topology

14
Estimate
  • Data Comm Warehouse
  • Estimate material needs
  • Present estimate to Trustee Board

15
Material Order YESCO
  • 1 59484B24 24 Port Patch Panel 74.82
  • 1 Box of 20 TSR1I6A 6ft. Raceway 102.60
  • 10 410892IP 2 port surf. Box 11.69
  • 15 41108RI5 C5 jacks 48.45
  • 10 TSR1I25 elbo cover 7.30
  • 20 TSR1I33 external cover 14.60
  • 10 TSR1I14 splice cover 7.30
  • 5 1000ft cat.5 24/4 blue cable 241.78
  • 1 hpwwb6u18 hubbell wall mount bracket 139.00
  • 1 16 port rack mount 10/100 HUB 165.00
  • 6 14 ft. patch cord cat 5 19.60
  • 3 7 ft patch cord cat 5 4.75
  • 10 3 ft. patch cord cat 5 10.83
  • Total 850.82
  • Material Return
  • 15 TSR1I6A raceway 76.95
  • 4 410892Ip 2 port surf. Box 4.68
  • 5 41108RI5 C5 jack 16.15

Material Order 850.82 Material Return
126.98 SubTotal 723.84 Proposed
Webramp 369.99 Total
1,093.83
16
Wiring Closet
  • Location of MDF
  • MDF specifications
  • EIA/TIA-569
  • Central location 90 meters catchment area
  • Secure location
  • Walls Floors Doorway
  • Lighting Ceiling
  • Temp. 70 Humidity 30-50
  • Power Outlet
  • Mounting Bracket
  • Cut sheet

17
2
6
3
5
4
1
1 Jan 154 6 Pastor Mike 169 2
Donna 129 7 Roberta 170 3 Copier 127 8 Lois
94 4 Pastor Scott149 9 Pastor Dave 198 5 Pastor
Dan 178 10 Robin 143
Catchment Area
MDF
Cut Sheet Catchment area
10
7
9

8
18
Pulling Cable
  • EIA/TIA-568B- Specifies horizontal cabling scheme
  • Pulled 6 wires down main office hallway
  • Pulled 1 wire to Robertas
  • Pulled 3 wires down hallway to Pastor Daves

19
Patch Panel Hub Jacks
EIA-TIA 568-B standards. We have learned that
horizontal cabling, as defined by EIA/TIA-568B,
is the networking media that connects the
telecommunications outlet to the horizontal
cross-connect.
20
Cable Testing
  • Fluke Cable Tester Map test Cable Distance
  • Label Outlets
  • Journal

21
Software Upgrade NIC Installation
  • Clients Upgraded Donna Pastor Mike Roberta Lois
    Pastor Scott ??
  • Win95 to Win98
  • NIC installation
  • Software setup
  • NIC Installation Software Setup
  • 4 NICs installed
  • Software setup
  • Network Neighborhood
  • MS network File Print sharing ID
    name WorkGroup name

22
Wiring Journal of FBC
Cable Run Length In Feet
1 Jan 154 6 Pastor Mike 169 2
Donna 129 7 Roberta 170 3 Copier 127 8 Lois
94 4 Pastor Scott149 9 Pastor Dave 198 5 Pastor
Dan 178 10 Robin 143
Work Group - Chruch
23
2
6
3
5
4
1
1 Jan 154 6 Pastor Mike 169 2
Donna 129 7 Roberta 170 3 Copier 127 8 Lois
94 4 Pastor Scott149 9 Pastor Dave 198 5 Pastor
Dan 178 10 Robin 143
Catchment Area
MDF
Journal Cable Runs Id.Clients
10
7
9

8
24
  • Thank You
Write a Comment
User Comments (0)
About PowerShow.com