Statewide Measure Cost Update - PowerPoint PPT Presentation

About This Presentation
Title:

Statewide Measure Cost Update

Description:

CALMAC Discussion. 3. Measure List. Initial measure lists will follow the DEER Update Study measure lists ... CALMAC Discussion. 6. Next Steps. Select advisory ... – PowerPoint PPT presentation

Number of Views:11
Avg rating:3.0/5.0
Slides: 7
Provided by: craig76
Learn more at: https://www.calmac.org
Category:

less

Transcript and Presenter's Notes

Title: Statewide Measure Cost Update


1
Statewide Measure Cost Update
  • Overview Discussion

2
Background Purpose
  • Background
  • Measure cost studies provide the average
    incremental and full costs for new and retrofit
    energy efficiency measures (commercial and
    residential).
  • Typically performed in concert with DEER energy
    savings estimates.
  • Last update conducted in 2001.
  • Purpose
  • Create a common set of cost information and
    assumptions to be used as a starting point for
    all parties when planning and evaluating energy
    efficiency efforts.
  • Consistency with DEER measure descriptions.

3
Measure List
  • Initial measure lists will follow the DEER Update
    Study measure lists
  • Residential retrofit - weather sensitive and
    non-weather sensitive.
  • Non-residential retrofit - weather sensitive and
    non-weather sensitive.
  • Initial attention should be given to measures
    likely to represent the bulk of savings from
    2006/7 program efforts
  • Consultant will review 2004/5 measure activity
    for IOU and non-IOU programs.
  • Consultant will suggest other measures for
    initial attention based upon impact of new
    standards upon likely program offerings.
  • CFLs (screw-in and modular), programmable
    thermostats, package and split system air
    conditioners, T-8 and T-5 lighting systems,
    clothes washers, dishwashers, pool pumps, and
    dual pane windows will be among the first
    measures examined.

4
Issues For Discussion
  • Should focus/scope be broadened beyond
    residential and commercial retrofit measures?
  • Industrial?
  • Commercial new construction?
  • Residential new construction?
  • Should installation costs be estimated for each
    measure or for a subset of measures?
  • Direct install program support.
  • More accurate cost comparison for individual
    measures with differing installation costs (e.g.,
    condensing furnaces and water heaters).
  • Necessity of close linkage to DEER update
    efforts.
  • Advisory group makeup/requirements.

5
Issues For Discussion (continued)
  • Necessity of direct integration of measure cost
    information into DEER website.
  • Might require website redesign.
  • Updating issues (frequency timing).
  • How should information from other EMV studies be
    integrated?
  • Existing studies?
  • Studies in process?
  • Future studies?
  • Should/can existing studies work scopes be
    modified to collect measure cost data for direct
    inclusion into the DEER/Measure cost database?

6
Next Steps
  • Select advisory group members
  • Shahana Samiullah - SCE
  • Andrew Sickles - Sempra
  • Amalia Klinger - PGE (Project Manager)
  • _____________ - CEC
  • _____________ - Energy Division
  • _____________ - ?
  • Prepare draft scope of work for advisory group
    review (week of 8/23)
  • Prepare proposal based upon advisory group
    comments (week of 9/6)
  • Select winning bidder (mid-October)
Write a Comment
User Comments (0)
About PowerShow.com