Title: DSDM


1
DSDM
  • Dynamic Systems Development Method

2
Principles of DSDM
  • Active user involvement is imperative.
  • DSDM teams must be empowered to make decisions.
  • The focus is on frequent delivery of products.
  • Fitness for business purpose is the essential
    criterion for acceptance of deliverables.
  • Iterative and incremental development is
    necessary to converge on an accurate business
    solution.
  • All changes during development are reversible.
  • Requirements are base lined at a high level.
  • Testing is integrated throughout the lifecycle.
  • A collaborative and co-operative approach
    between all stakeholders is essential.

3
Project Structure
  • Starting
  • Has a major control point after an initial
    understanding of the project has been gained
    point at which a decision to proceed must be
    confirmed, and the option of abandoning project
    must be considered
  • End of the Business Study (with Business Area
    Definition, System Architecture Definition, and
    Outline Prototyping Plan)
  • Also has an earlier, less critical, control point
    that is sometimes omitted
  • The Feasibility Study (Products Feasibility
    Report, optional Feasibility Prototype, Outline
    Plan)

4
Project Structure
  • Running
  • A management stage may consist of a number of
    DSDM timeboxes. The number of stages required
    should be determined by balancing the amount of
    management control needed over the project and
    its risks against the potential overhead of
    managing stage boundaries.
  • A stage might be mapped
  • To a phase (if all the functional model iteration
    is done before all the design and build
    iteration), or
  • To the development of a functional area (where
    the functional model iteration and the design and
    build iteration are done in alternation).
  • DSDM Implementation is either simply a part of
    the increment (where this is treated as a single
    stage) or may be treated as one or more stages in
    its own right.

5
Project Structure
  • Stopping
  • The project review in DSDM is done in each
    increment
  • The key is tailoring the methods to do what is
    needed and no more, since in DSDM incremental
    acceptance has already taken place.
  • During early adoption of DSDM, the probability of
    and need for lessons learned information is
    heightened.

6
General Remarks
  • DSDM defines several roles and responsibilities
  • DSDM specifies several deliverables, such as the
    project initiation document among others
  • Certification in DSDM is highly sought after
    especially in the EU.

7
General Remarks
  • DSDM is a non-proprietary agile application
    development methodology for developing business
    solutions within tight timeframes.
  • It shortens the clock-speed (and time to market)
    for delivery of core business benefits.
  • It's tool-independent .

8
Conclusion
  • Few ideas in DSDM are new best practices are
    synergistically built into the model.
  • As a result, people are applying DSDM to projects
    in a wide range of fields, in and outside of
    Information Technology.
  • Recent trends are to combine DSDM with PRINCE2 or
    with XP (Extreme Programming),
  • Enterprise XP or EXP (a term coined by Mike
    Griffiths of Quadrus) seeks the benefits of
  • DSDM's project management framework and business
    focus and
  • XP's high efficiency and high quality development
    practices