Project Name System Final Review - PowerPoint PPT Presentation

1 / 25
About This Presentation
Title:

Project Name System Final Review

Description:

Project Final Review. 6. System Overview ... Project Final Review. 15. System Element 1. Insert the data from the Parametric Design. ... – PowerPoint PPT presentation

Number of Views:32
Avg rating:3.0/5.0
Slides: 26
Provided by: stephen258
Category:
Tags: final | name | project | review | system

less

Transcript and Presenter's Notes

Title: Project Name System Final Review


1
Project NameSystem Final Review
Insert project logo
  • Class Number Title
  • Date
  • Location

2
Topics
  • Project Overview
  • System Overview
  • System Element 1
  • System Element 2
  • System Element 3
  • Management Overview
  • Supplemental Slides

3
Project Overview
  • Project Mission Statement
  • One paragraph statement of the overall goal
    (general attributes) of the project. This is a
    high-level summary statement (few specific
    details).
  • Project Technology Demonstration
  • What are the key technologies to be demonstrated
    in the project
  • Project Objectives
  • List objectives (specific attributes) to define
    the mission statement. These are lower-level and
    more specific than the Mission Statement.

4
Project Overview
  • Project Success Criteria
  • What will be the minimum set of testable outcomes
    to declare the project a success
  • Relevance to Sponsor
  • What are the reasons that the sponsor should
    support the project (what will it do for the
    sponsor?)

5
Project Overview
  • Project-level Requirements
  • Project success and other programmatic criteria
    turned into a set of specific, testable
    statements. If programmatic criteria come from a
    specification document that must be met,
    reference the document. List these requirements
    in a table.

6
System Overview
System Block Diagram/Graphic
  • Itemize the major system elements and a brief
    statement of their function

7
System Overview
Graphic to illustrate system operational phases
8
Project System Element Risk Assessment
9
System Element 1
  • System Element Description
  • For each major system element, give a detailed
    description of the main function it is to
    perform.
  • System Element Success Criteria
  • For each major system element, give a detailed
    listing of success criteria

10
System Element 1
  • System Element Requirements
  • Testable requirements tied to project-level
    requirements for the 1st system element

11
System Element 1
  • Subsystem Listing
  • For each major system element, list the
    subsystems to comprise that system element. Use
    WBS numbering to identify them.
  • Include a block diagram showing the relative
    relationship between the subsystems and any
    signals that can be defined

Graphic capturing the Conceptual Design Diagram
for the system element
12
System Element 1
Subsystem block diagram/graphic
  • Subsystem Definition
  • Describe the function(s) to be performed by the
    ith subsystem of system element 1
  • Describe any operational phases or timings
    relevant to the subsystem
  • Subsystem I/O (power and/or signals)

13
System Element 1
  • Subsystem Requirements
  • Testable requirements tied to system element
    requirements for the ith subsystem of system
    element 1

14
System Element 1
Insert a graphic showing the Part Configuration
for this subsystem.
15
System Element 1
Insert the data from the Parametric Design.
16
System Element 1
Detailed schematics/drawings/flow charts, etc.
17
System Element 1
  • Support Analysis/Data
  • Power needs (nominal, worst case)
  • Mass budget, form factor restrictions
  • Thermal considerations/mitigation
  • Safety factors (vibration, mass, wire gauge,
    fasteners, etc.)
  • Regulatory issues (code specifications,
    regulatory specifications, etc.) that must be
    met status of any relevant applications,
    licenses, or reviews

18
System Element 1
  • Hardware/software Test Integration status
  • If any hardware/software has been developed to
    test design concepts, show results here
  • Indicate any potential design delays (long lead
    items, etc.) here.

19
System Element Subsystem Risk Assessment
20
Management Overview
  • Organizational Chart
  • WBS
  • Schedule
  • Budget

21
Organizational Chart
Show an organizational chart with lines of
reporting for team members. Also indicate
advisors/helpers
22
WBS
  • WBS
  • Project Work breakdown Structure

23
Schedule
  • Schedule
  • Show expected time line for the project (can be
    done as a Gantt chart)
  • Use the WBS from the preceding slide

24
Budget
  • Budget
  • Personnel and resources budget for developing the
    project

25
Documentation
  • The following documents are suggested to be ready
    at the time of the Critical Design Review
  • Final test results to show that all requirements
    have been successfully met
  • Any final changes to previous documents
  • Final design notebook showing all supporting
    analysis and alternatives considered.
Write a Comment
User Comments (0)
About PowerShow.com