Maintenance Plan Proposal MI 11 - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

Maintenance Plan Proposal MI 11

Description:

Maintenance Plan Proposal MI 11 – PowerPoint PPT presentation

Number of Views:24
Avg rating:3.0/5.0
Slides: 10
Provided by: ziwo
Category:

less

Transcript and Presenter's Notes

Title: Maintenance Plan Proposal MI 11


1
Maintenance PlanProposal MI 11
  • W. Ziegler
  • University of Applied Sciences, Karlsruhe
  • (18-03-2008)

2
goal
  • Semantic data model for enrichement of procedural
    tasks with service level information and task
    intervals
  • Automatic generation of maintenance overviews /
    maintenance plans
  • Possibilities for filtering, extracting and
    linking to procedural tasks

3
use case
  • EditingIncluding task-interval element in
    procedural task (below title)Defining attribute
    values (service level/ intervals) and content
    appearing as procedure title within plan
  • PublishingAutomatic assemblation of
    task-interval elements within trigger-element
    (maint-plan) or at defined output position (e.g.
    last position)Formatting as table

4
basic semantic model
  • ltELEMENT taskinterval (PCDATA,....)gt lt!--Mixed
    Content for title text appearing in the
    maintenance table--gt
  • lt!ATTLIST taskinterval hand-over
    (handover) IMPLIED
  • service-once (serviceonce) IMPLIED
  • service-before (servicebefore) IMPLIED
  • service-interval
    (serviceinterval) IMPLIED
  • customer-once
    (customeronce) IMPLIED
  • customer-interval
    (customerinterval) IMPLIED
  • customer-before
    (customerbefore) IMPLIED
  • special-interval
    (specialintervals) IMPLIED gt
  • lt!ENTITY handover "service-hand-over"gt
  • lt!ENTITY serviceonce " 500h 1000h 2000h"gt
    lt!-- Example --gt
  • lt!ENTITY servicebefore "s-installation
    s-put-into-operation"gt
  • ...
  • ...
  • ...

Main Problem standardized or open definition
of attribute values
5
examples (1)
  • Editing
  • lttask xmllang"en-us"gt
  • lttitlegtChecking the air filterlt/titlegt
  • lttaskinterval customer-interval"customer-week"gtEm
    pty the dust valve on the air filter
    housing.lt/taskintervalgt
  • ltshortdescgtlt/shortdescgt
  • lttaskbodygt
  • ltprereqgtWhen the machine is started, the
    ...lt/prereqgt
  • ltstepsgt
  • ltstepgtltcmdgtPress the rubber lips on the dust
    valve together. .lt/cmdgtlt/stepgt
  • lt/stepsgt
  • lt/taskbodygt
  • lt/taskgt

6
examples (2)
  • Assembly in generated output
  • (Alternatively virtual assembly during
    publication process)
  • ltmaint-tablegt
  • lttaskinterval customer-interval"customer-day"gtD
    iesel fuel water separator, draining off


    condensate.lt/taskintervalgt
  • lttaskinterval service-interval"service-500h"gtFu
    el tank, draining off condensationlt/taskintervalgt
  • lttaskinterval service-interval"service-1000h"gtR
    eplace the fuel prefilterlt/taskintervalgt
  • lttaskinterval service-interval"service-1000h"gtR
    eplace the fuel filterlt/taskintervalgt
  • lttaskinterval service-interval"service-2000h"gtC
    heck the injection valveslt/taskintervalgt
  • lttaskinterval customer-interval"customer
    -week"gtVisually inspecting the pressure
    filterlt/taskintervalgt
  • lttaskinterval service-interval"service-quarter"
    gtChanging the refueling pump pressure
    filter.lt/taskintervalgt
  • lttaskinterval customer-interval"customer-day"gtC
    hecking the coolant level.lt/taskintervalgt
  • lttaskinterval service-interval"service-500h"
    special-interval"winter"gtChecking the DCA
    concentrate and
    antifreezelt/taskintervalgt
  • lttaskinterval service-interval"service-500h"gtRe
    placingthe water filterlt/taskintervalgt
  • lttaskinterval service-interval"service-500h"gtCh
    ecking the radiator and fan wheel for leaks
    and dirtlt/taskintervalgt

7
examples (3)
  • Additional possibilities within component
    oriented approach for topic creation. Building
    hierarchy in maintenance table from nesting of
    topics within map.
  • ltmaint-tablegt ltpartsmaintintervalgt lttitle gtFuel
    systemlt/ title gt
  • lttaskinterval customer-interval"customer-day"gtD
    iesel fuel water separator, draining off


    condensate.lt/taskintervalgt
  • lttaskinterval service-interval"service-500h"gtFu
    el tank, draining off condensationlt/taskintervalgt
  • lttaskinterval service-interval"service-1000h"gtR
    eplace the fuel prefilterlt/taskintervalgt
  • lttaskinterval service-interval"service-1000h"gtR
    eplace the fuel filterlt/taskintervalgt
  • lttaskinterval service-interval"service-2000h"gtC
    heck the injection valveslt/taskintervalgt
  • lt/partsmaintintervalgt
  • ltpartsmaintintervalgt lt title gtRefueling pump
    pressure filterlt/ title gt
  • lttaskinterval customer-interval"customer-week"gt
    Visually inspecting the pressure
    filterlt/taskintervalgt
  • lttaskinterval service-interval"service-quarter"
    gtChanging the refueling pump pressure
    filter.lt/taskintervalgt
  • lt/partsmaintintervalgt
  • ltpartsmaintintervalgt
  • lt titlegt Cooling systemlt/ title gt
  • lttaskinterval customer-interval"customer-day"gtC
    hecking the coolant level.lt/taskintervalgt
  • lttaskinterval service-interval"service-500h"
    special-interval"winter"gtChecking the DCA
    concentrate and
    antifreezelt/taskintervalgt
  • lttaskinterval service-interval"service-500h"gtRe
    placingthe water filterlt/taskintervalgt
  • lttaskinterval service-interval"service-500h"gtCh
    ecking the radiator and fan wheel for leaks
    and dirtlt/taskintervalgt

8
Examples (table-heading) (4)
Generated layout text
language dependant
9
Examples (5)
Automatic table creation / formatting
Hierarchy(optional)
Linking inonline-media
Write a Comment
User Comments (0)
About PowerShow.com