T24 STEP Manufacturing
  • Team leader
  • Martin Hardwick
  • Deputy
  • Chiaki Sakamoto
  • Exploder
  • step-manufacturing_at_steptools.com
  • Archive
  • http//www.steptools.com/manforum/meetings.html

2
T24 STEP-Manufacturing
T24 STEP-Manufacturing
  • Accomplishments
  • AP-224 (features) ed3 published
  • AIC 522 (features) ed2 published
  • AP-219 (inspection) DIS ballot in progress
  • AP-223 (castings) CD ballot passed
  • AP-229 (forgings) NWI ballot passed
  • AP-238 (machining) IS ready to be sent to Geneva

3
T24 STEP-Manufacturing
  • Schedule
  • Monday, 2006-06-26, 1300-1700
  • Status update of all APs
  • Status update on ISO 13399 (cutting tools)
  • Traceability
  • Plans for Wednesday
  • Tuesday, 2006-06-27, 0800-1700
  • Review of AP-223 (castings)
  • Review of AP-229 (forgings)
  • Review of AP-219 (inspection)
  • Discussion of possible SEDs for AP-240
    (planning)
  • Gears and AP-224

4
T24 STEP-Manufacturing
  • Schedule
  • Wednesday, 2006-06-28, 0800-1700
  • Industry day machining demonstration
  • Industry day panel session
  • See meeting web site for detailed schedule
  • Thursday, 2006-06-29, 0800-1800
  • Joint meeting with SC1
  • Discussion of Busan (Korea) demonstration
  • Discussion of future projects
  • AP-238 IS walkthru
  • Discussion of AP-238 CC1 implementation testing

Minutes of the joint meeting will be issued by
the SC1/Wg7 Convenor
5
Attendees
  • Fred Proctor USA/NIST
  • Sid Venkatesh USA/Boeing
  • Chiaki Sakamoto Japan/MER
  • Alain Brail France/Airbus
  • Julio Garrido Spain/Vigo University
  • Lena Person Sweden/Sandvik
  • Len Slovensky USA/SCRA
  • Alan Crawford UK/LSC
  • Bill Freeman USA/SCRA
  • Rob Leiblandt US DoD (SC31 Liaison)
  • Gero Banseult Germany/TUU
  • Roland Maranzana Canada/ETS
  • Juha Saaski Finland/VTT
  • Tapio Salonen Finland/VTT
  • Akinobu Hatada Japan/Tanatsugu
  • Martin Hardwick USA/STEP Tools
  • Raj Iyer USA/Army
  • Jonas Nordstrom Sweden/Sandvik
  • Olof Nyqvist Sweden/KTH

6
Attendees Continued
  • Suk Hwan Suh Postech/Korea
  • Akram Yunas AIAG/USA
  • Donalf Galway AIAG/USA
  • Gernot Rossi Siemens/Germany
  • Carol Tierney General Dynamics/USA
  • Stephen Newman University of Bath/UK
  • Jean-Yves Hascoet ECN-IRCCyn/France
  • Van Khai Nguyen Cadcamation/Switzerland
  • Dimitri Kirtsis EPFL/Switzerland

Canada (1), Finland(2), France(2), Germany(2),
Japan(2), Korea(1), Spain(1), Sweden(3),
Switzerland(4), USA(12), UK(2)
7
Highlights of Toulouse Demonstration
  • 100 attendees
  • Successfully machined 5-axis test parts
  • Machining using STEP features
  • Contributions from France, UK, USA, Sweden,
    Germany
  • Presentations from France, UK, USA, Germany,
    Korea, Japan, Sweden, Spain, Switzerland
  • Test parts from Boeing and Airbus
  • Demonstrated use of STEP APs for design,
    planning and manufacturing

8
Toulouse Demonstration
AP-203 File
STEP Trans
Path used for feature Roughing
Path used for 5-axis Finishing
Path 2 Direct Translation
AP-224 File
AP-238 File
Airbus Fish and Boeing Fin
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
Demonstration Summary
  • STEP-NC is easy to implement
  • Basic prototype in 4 weeks
  • Level 2 by adding CAD geometry
  • Machining benefits
  • CNC independent tool paths
  • Collision detection on the control
  • Feature based re-programming
  • Visual closed loop programming
  • Enterprise benefits
  • Long term data retention
  • Interchange with suppliers

13
Demonstration Attendees
14
Plans for Hershey
  • Regular meetings on October 23 and 24
  • Implementors Forum Wednesday October 25
  • T24 Site Visit to Harley Davidson (Evening)
  • Joint meeting with SC1 on October 26 (Tentative)

15
Hershey Implementors ForumWednesday October 25
  • Morning Inspection and Machining
  • Aerospace part and automotive part
  • Videos of machining the parts
  • Videos of inspecting the parts
  • Afternoon Forum Discussion
  • Identify gaps
  • Actions for emerging standards
  • Actions for existing standards
  • Strategy for global acceptance

16
Plans before Hershey
  • Deliver IS of AP-238 to ISO
  • Complete DIS ballot for AP-219
  • International Interoperability Testing

17
International Interoperability Testing
  • AP-238 CC1 (Toolpath Programming)
  • Phase 1 (July August 2006)
  • Determine participants
  • Gather test files
  • Finalize implementation guidelines
  • Phase 2 (September October 2006)
  • Implement AP-238 CC1 export for CAM
  • Implement AP-238 CC1 converters for CNC
  • Verify using CNC simulators at Hershey meeting