AI-Based Optimization of Snow Removal Assets / Resources - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

AI-Based Optimization of Snow Removal Assets / Resources

Description:

AI-Based Optimization of the Management of Snow Removal Assets / Resources ... Focus on integration of AI shell with GIS and databases ... – PowerPoint PPT presentation

Number of Views:80
Avg rating:3.0/5.0
Slides: 23
Provided by: mdsa6
Category:

less

Transcript and Presenter's Notes

Title: AI-Based Optimization of Snow Removal Assets / Resources


1
AI-Based Optimization of Snow Removal Assets /
Resources
  • Advisory Committee
  • Meeting
  • April 13, 2001

2
Meeting Agenda
  • 200 p.m. Coffee/Refreshments
  • 215 Welcome/Introductions -- Prof. Salim
  • 225 Progress Report -- Prof. Salim
  • 240 Software Issues -- Prof. Salim
  • 250 Software Demo Mr. Villavicencio
  • Mr. Zora
  • 320 Panel Discussion -- All
  • 350 Setting of Action Items -- Prof. Salim
  • 400 Scheduling of Next Meeting

3
Welcome/Introductions Prof. Salim
  • Grant Participants
  • Profs. Salim and Timmerman,
  • Industrial Technology
  • Profs. Emch and Strauss
  • Geography

4
Welcome/Introductions Prof. Salim
  • Advisory Board Members

Dave Nelson Area Maintenance Manager DOT
-Waterloo Steve Decker Street Department City
of Waterloo Daron Van Helden Public Gov't
Relations AAA Minnesota / Iowa
Budd Curttright Public Works Director City of
Cedar Falls Barbara Berquam GIS Coordinator
Black Hawk County Dennis Burkheimer
Maintenance Safety Services DOT-Ames
5
Project Progress Prof. Salim
  • Technical Progress
  • Integration of Art Enterprise and GIS package.
  • Creation of Databases for resources.
  • Software development of a prototype system.
  • Demonstration case for Cedar Falls.

6
Project Progress Prof. Salim
  • Educational Progress
  • Training of graduate students.
  • Undergraduate research experiences.
  • Project public website www.uni.edu/transport.
  • New website exclusive to project under
    development.

7
Project Progress Prof. Salim
  • Publicity Goals
  • The following article will be orally presented at
    the indicated meeting in Helsinki, Finland, June
    6, 2001.
  •  
  • Title A Communication-Based Paradigm for
    Construction Asset Management
  • Authors MD Salim and Marc A. Timmerman
  • Accepted for the proceedings of the 2nd
    Worldwide ECCE Symposium Information and
    Communication Technology (ICT) in the Practice of
    Building and Civil Engineering.

8
Project Progress Prof. Salim
  • Submitted for review for oral presentation and
    conference proceeding publication at The Eighth
    East Asia-Pacific Conference on Structural
    Engineering and Construction in Singapore in
    December of 2001
  • Title Optimization of Construction Logistics
    Using
  • AI-based Heuristic Asset Management Tools
  • Authors MD Salim and Marc A. Timmerman

9
Project Progress Summary Table
0

3.6

Final manual

spring 2002/spring 2002

0

4

Dissemination



4.1

Publication and presentation

spring 2002/spring 2002

30

3.2

Website implementation

spring 2002/spring 2002

0

4.3

Revi
sed manual

spring 2002/spring 2002

0

4.4

Revised software

spring 2002/spring 2002

0

4.5

Commercialization

spring 2002/spring 2002

0


10
Review of Project Software
ARTSCRIPT (LISP)
User Interface Input
DATABASE GIS
Problem Set-Up
DATABASE ASSETS
Optimizer
ART ENTERPRISE
ArcView 3.20
No
OK?
Yes
User Interface Output
ArcView 3.20
11
Software Issues Prof. Salim
  • Have just obtained GIS network integrator. This
    will be used
  • for networking snowplow routes.
  • In process of developing better lab network
    interface with UNI
  • Computer support staff.
  • In process of developing needed CD burn-in
    facilities and
  • software for final project distribution.

12
Software Demonstration Mr. Villavicencio Mr.
Zora
13
Snow Removal Asset/Resource Management System
  • General prototype. Focus on integration of AI
    shell with GIS and databases
  • Use current information of DOT available through
    WWW
  • Simple rules for
  • Priority assignment of segments of roads, based
    on interstate condition, truck route, high or low
    traffic volume (based on Aadt of 5000 and 2000
    respectively)
  • Assignment of snow plower based on cost and
    capacity criteria for each priority
  • Requires a hierarchy of rules to provide correct
    results (non monotonic logic)

14
  • May be easily extended to include new knowledge,
    restrictions, and other assets
  • Can include Cases for learning on CBR engine
  • Uses 6 rules, 350 objects, 24 functions/routines,
    8 databases for input, and generates 2 databases

15
Prototype DevelopmentKnowledge Modeling
16
Development of the Prototype
  • Implemented using Rapid Development Cycle method
    adapted for AI steps.
  • 2 different programming languages
  • ArtScript from Art Enterprise (Lisp-like).
    Implements logic and part of database analysis
  • Avenue from ArcView (VB-like). Graphic
    representation and data preparation for Expert
    System shell

17
Development of PrototypeArchitecture of the
System
  • General View
  • Users Perspective

18
  • General View
  • Developers perspective

19
Output generated by the system
  • Initial map generated for Cedar Falls

20
  • Priority Assignment and results

21
Panel Discussion -All
22
Wrap Up Prof. Salim
  • Setting of action items.
  • Plan for next meeting.