Title: WHATS NEW IN THE STATE ENGINEERS OFFICE


1
WHATS NEW IN THE STATE ENGINEERS OFFICE
2
  • I AM NEW

3
  • (d)    Negotiations after Unsuccessful
    Competitive Sealed Bidding. In lieu Instead of
    Section 11-35-1540, the following provisions
    apply
  • (1)    When bids received pursuant to an
    invitation for bids exceed available funds, and
    it is determined in writing by the agency that
    circumstances will do not permit the delay
    required to resolicit competitive sealed bids,
    and the base bid, less any deductive alternates,
    does not exceed available funds by an amount
    greater than ten percent of the

SENATE BILL 572 ENACTED IN 2006
4
Allowed to Pre-qualify sub-bidders in accordance
with 11-35-1520(11)
5
Allows negotiations with low bidder when base bid
is within 10 over construction budget rather
than 5
6
Lowered the threshold for requiring a bid bond
from 100,000 to 50,000
7
Added new criteria for selection of design
professionals1. Knowledge of the locality of
the project provided this criteria leaves an
appropriate number of qualified firms for
consideration2. Volume of work award by the
agency to a person or firm over past five years
8
3. Any other special qualifications necessitated
by the nature and scope of the project in the
criteria for selection of design professionals
9
Agencies no longer need OSE approval for Design
Professional contracts of 25,000 or less (must
submit copies of contracts to OSE for information)
10
REVISED MANUALIN THE WORKS
11
OSE must provide the public 60 days to comment on
changes to the Manual before they become
effective
12
SENATE BILL 282
13
  • "Section 11-35-3005.    (1)    The following
    project delivery methods are authorized for
    procurements relating to infrastructure
    facilities
  • (a)    design-bid-build
  • (b)    construction management at-risk
  • (c)    operations and maintenance
  • (d)    design-build
  • (e)    design-build-operate-maintain and
  • (f)    design-build-finance-operate-maintain.

14
  • 'Construction management at-risk' means a project
    delivery method in which the governmental body
    awards separate contracts, one for architectural
    and engineering services to design an
    infrastructure facility and the second to a
    construction manager at-risk for both
    construction of the infrastructure facility
    according to the design and construction
    management services.

15
  • 'Design-build' means a project delivery method in
    which the governmental body enters into a single
    contract for design and construction of an
    infrastructure facility.

16
  • 'Design-build-operate-maintain' means a project
    delivery method in which the governmental body
    enters into a single contract for design,
    construction, maintenance, and operation of an
    infrastructure facility over a contractually
    defined period. All or a portion of the money
    required to pay for the services provided by the
    contractor during the contract period are either
    appropriated by the State before the award of the
    contract or secured by the State through fare,
    toll, or user charges.

17
  • 'Design-build-finance-operate-maintain' means a
    project delivery method in which the governmental
    body enters into a single contract for design,
    construction, finance, maintenance, and operation
    of an infrastructure facility over a
    contractually defined period. Money appropriated
    by the State is not used to pay for a part of the
    services provided by the contractor during the
    contract period.

18
  • Section 11-35-1530(1)
  • "(1)    Conditions for Use. If a purchasing
    agency determines in writing that the use of
    competitive sealed bidding is either not
    practicable or not advantageous to the State, a
    contract may be entered into by competitive
    sealed proposals subject to the provisions of
    Section 11-35-1520 and the ensuing regulations,
    unless otherwise provided in this section.
    Contracts for the design-build,
    design-build-operate-maintain, or
    design-build-finance-operate-maintain project
    delivery methods specified in Article 9 of this
    Code must be entered into by competitive sealed
    proposals

19
WHAT ELSE IS HAPPENING?
20
EVALUATING PROCESSES
21
THINKING ABOUT HOW WE MIGHT COMPUTER AUTOMATE THE
PROCESS
22
  • ANY IDEAS TO HELP US DO A BETTER JOB ARE WELCOME

23
  • ANY QUESTIONS?