Title: Status Report for the
1 Status Report for the City of McKinney,
Texas on Multiple Building Projects McKinney
Fire Station 7 John and Judy Gay Library at
Gabe Nesbitt Park Municipal Courts Facility
(Formerly Old Public Safety Building)
Renovation Renovation of Existing Collin County
Government Center Annex B Renovation Phase
2 Westin Hotel and Conference Center Prepared
by Jackson AE Associates, Inc. Architectural and
Engineering Consulting 2400 Dallas Parkway Suite
200 Plano, Texas 75093 July 28, 2008
2McKinney Fire Station 7 861 South Independence
Parkway McKinney, Texas 75070 Pogue
Construction - CM _at_ Risk Architects Phelps /
Wood Building Area Approximately 13,500 Square
Feet on 2.7 Acres GMP 4,297,207 Scheduled
Completion January 2009
3 Status of Fire Station 7 Structural steel
is erected and decking is in place. Roofing will
follow in the next few weeks. Concrete masonry
installations are underway. Brick has been
delivered on site. The precast perimeter fence is
in place. Paving nears completion on the site and
is in process on Independence Pkwy. Mechanical
and electrical installations are ongoing.
4 Primary Issues on Fire Station 7 3 weeks
of weather related delays have occurred and have
pushed scheduled completion to January 2009. A
lost time accident occurred on site when a welder
climbing a masonry scaffold slipped and fell
approximately 6 feet.
5 Fire Station 7 Structural Steel
Photos taken 07/17/08
Overview
6 Concrete Masonry and
Plumbing Work
Perimeter Fencing
7John and Judy Gay Library at Gabe Nesbitt
Park 6861 West Eldorado Parkway McKinney, Texas
75070 Pogue Construction - CM _at_ Risk Leo A.
Daly - Architects Building Area Approximately
20,000 Square Feet on 4.0 Acres GMP
5,555,904 Schedule Fall 2009
8Status of New Community Library Architectural
and Engineering plans were submitted to the City
for plans review and permitting. The
Groundbreaking ceremony occurred on July 15,
2008. The first furniture, fixtures and
equipment selection for library shelving has been
made and others are in process.
9John and Judy Gay Library At Gabe Nesbitt Park
Groundbreaking
10Municipal Courts Facility (formerly Old Public
Safety Building) Renovation 130 South Chestnut
Street Scobilt Contractors, Inc. Design /
Build Kent Spurgin Architects Building Area
Approximately 16,605 Square Feet on lt 1.0
Acre GMP 1,224,425 Schedule Fall 2009
11Status of the Municipal Courts Facility (formerly
Old Public Safety Building) Renovation The
building will house all Municipal Court functions
and supporting offices for the foreseeable
future. Initial demolition has begun and actual
renovations will commence the first of August
after Municipal Courts is relocated.
12 Municipal Courts Facility Renovation Floor Plan
13Renovation of the Existing Collin County
Government Center 210 South McDonald
Street Construction Delivery Method To Be
Determined Programming and Master Planning
Brinkley Sargent Architects Building Area
Approximately 155,000 SF (previously believed to
be 188,000 SF) 3 Building Total on 9.2
Acres Renovation of Approximately 125,000 SF
(previously believed to be 80,000 SF) GMP To
Be Determined Schedule To Be Determined
14Status of the Renovation of the Existing Collin
County Government Center A presentation was made
to City Council of the Interim Report on the
Programming and Master Planning. Further
direction from Council to the project team is
being awaited at this time prior to proceeding
with the project.
15Annex B Renovation Phase 2 314 South Chestnut
Street Scobilt Contractors, Inc. Design /
Build Kent Spurgin Architects Building Area
Approximately 9,200 Square Feet Building
Total Renovation Area - Approximately 4,800
Square Feet GMP (revised to include exterior
work ) 445,000 Schedule June 2008
16Status of Annex B Renovation Phase
2 Construction for the renovated space is
complete, the spaces are fully functional and
the Human Resources and the Codes Departments
have moved into their new spaces.
17Westin Hotel and Conference Center 1900
Gateway Boulevard OS Holdings Three
Architects Hotel - Approximately 211 Rooms and
Supporting Functional Spaces Conference Center
Ballroom Banquet Seating for 2000
Approximately 24,500 SF and Supporting Functional
Spaces and Separate Meeting Spaces Total Project
Budget Approximately 70,000,000 Total
Construction Budget Approximately
50,000,000 Conference Center Approximately
16,200,000 Proposed Schedule October 31, 2009
18 Status of Westin Hotel and Conference
Center The installations of building
foundations and grade beams are being completed
and the base of the tower crane has been
installed. The design team has issued a 100 set
of construction documents for plans review and
permitting, civil documents are still in
process. OS and Beck have been aggressively
pursuing value engineering options and
alternatives.
19 Westin Hotel and Conference Center Photos taken
07/02/08
Tower Crane Base
20 Pier installations Photos Taken June 13, 2008
Headwall at creek area