Work Smart, Not Hard - PowerPoint PPT Presentation

About This Presentation
Title:

Work Smart, Not Hard

Description:

With similar progress in automotive technology, today we could buy a Lexus for ... their jobs or have them replaced by technology? Productivity Waste Sources ... – PowerPoint PPT presentation

Number of Views:87
Avg rating:3.0/5.0
Slides: 22
Provided by: carter5
Category:
Tags: hard | smart | work

less

Transcript and Presenter's Notes

Title: Work Smart, Not Hard


1
Work Smart, Not Hard
  • Chapter 3
  • IENG 311
  • Work Methods
  • Fall 2005

2
Changes in the Standard of Living
  • See next two slides
  • Make predictions about 2030

3
(No Transcript)
4
(No Transcript)
5
Productivity
  • The ratio between input and output
  • 4 classic factors
  • land
  • materials
  • machines
  • labor

6
Land Productivity
  • Better seeds or better fertilizer or herbicides
    for better yields
  • bushels per acre
  • faster maturing trees
  • output per unit of land increases

7
Materials Productivity
  • Reduce scrap or waste so that a higher percentage
    of the raw material is utilized
  • use of non-corrosive materials or coatings to
    increase the life of products (e.g. bridges,
    highways, tools)

8
Machine Productivity
  • Schedule truck loads in both directions
  • using ceramic coated or carbide coated cutting
    tools to increase cutting speeds and prolong
    cutter life
  • using a word processor to produce a letter
  • using email rather than US mail
  • using machines over 2 or 3 shifts rather than one

9
Labor Productivity
  • Improve the work methods
  • use a fixture to hold parts for assembly with two
    hands rather than one

10
Productivity Perspectives
  • Developed countries have used materials, energy,
    and information to replace labor
  • Cheap energy and materials keep productivity high
    (energy crises effects)
  • In the US, we have matured such that labor prices
    dominate productivity
  • In developing countries, they usually have cheap
    labor to offset transportation costs to big
    markets.

11
Productivity Perspectives
  • In the early 1900s, 85 of US workers were in
    ag, now its less than 3
  • In 1950, 73 of US employees were in production
    or mfg, now its less than 15
  • In 2000, at least 44 of all workers are in data
    services

12
Productivity Perspectives
  • In 1991, for the first time ever, companies spent
    more money on computing and communications gear
    than the combined money spent on industrial,
    mining, farm, and construction equipment
  • In 2000, no developed country will have more than
    1/6 of its workforce in the traditional roles of
    making and moving goods

13
Productivity Perspectives
  • In 1993, 19,000,000 people carried pagers and
    12,000,000,000 messages were left in voice
    mailboxes
  • There has been more information produced in the
    last 30 years than during the previous 5000

14
Productivity Perspectives
  • The first practical industrial robot was
    introduced in the 1960s
  • In 1982 there were approximately 32,000 robots
    used in the US
  • Today there are over 20,000,000

15
Productivity Perspectives
  • Computer power is 8000 times less expensive than
    it was 30 years ago
  • With similar progress in automotive technology,
    today we could buy a Lexus for 2. It would
    travel at the speed of sound, and go about 600
    miles on a thimble of gas

16
Cost of Living Changes
17
Conclusion
  • The Industrial Age has given way to the
    Information Age
  • What Age will your grandchildren be living in??

18
Who should benefit?
  • Obviously consumers
  • Employers vs employees??
  • Will workers lose their jobs or have them
    replaced by technology?

19
Productivity Waste Sources
  • Improper product design
  • Nonstandardization
  • Incorrect quality standards
  • Material waste
  • Energy waste

20
Productivity Waste Sources
  • Poor methods
  • poor macro method
  • telephone tag vs email, fax, answering machine
  • hand entry vs bar codes
  • poor micro method
  • waitress enters orders in handwriting vs circling
    pre-printed items
  • poor arrangement
  • poor equipment usage

21
Productivity Waste Sources
  • Poor Management
  • too many product models
  • poorly design product
  • poor production scheduling
  • poor maintenance
  • poor safety and health
  • Poor Workers
  • soldiering, absenteeism, etc.
Write a Comment
User Comments (0)
About PowerShow.com