General%20Impression - PowerPoint PPT Presentation

About This Presentation
Title:

General%20Impression

Description:

Reports are visitors are integrating well at CERN ... 'Process' growing baroque. Too many committees, reviews, and org chart boxes! ... – PowerPoint PPT presentation

Number of Views:19
Avg rating:3.0/5.0
Slides: 5
Provided by: pushp
Category:

less

Transcript and Presenter's Notes

Title: General%20Impression


1
General Impression
  • Good
  • LARP has grown significantly in size since it
    started
  • Gained credibility both here and at CERN
  • US Labs like it as a way to support work
  • CERN is admitting theyve bitten off more than
    they can chew
  • Reports are visitors are integrating well at CERN
  • Poised to play an increasingly important role in
    the future
  • Needs improvement
  • Magnet effort needs a clear path to convergence
  • Accelerator physics effort needs alignment with
    CERN priorities
  • Process growing baroque
  • Too many committees, reviews, and org chart
    boxes!
  • Integrated project management tools
  • Challenge
  • Maintain RD strength while insuring success in
    designated deliverables

2
Thoughts as next Program Leader (8/1)
  • Why was I picked (my opinion)?
  • Two years as LARP reviewer
  • Pretty good big picture
  • Structured similar to Proton Plan
  • Management structure outside of line authority
  • Have successfully made correct, but unpopular
    decisions
  • Guidance from DOE (LK Len and Bruce Strauss)
  • Lots of autonomy
  • Need a solid plan to make magnet effort converge
  • Cant support two paths indefinitely
  • Get a handle on accelerator physics effort
  • Growing out of control
  • Keep RD component
  • Avoid works projects for labs

3
Priorities (a first pass)
  • Insure the near term deliverables and
    commissioning effort go well, and make sure LARP
    gets credit.
  • Schottky detector
  • Luminosity monitor
  • Tune tracker
  • LTV program
  • Make sure the significant projects have a high
    probability of success
  • Ni3Sn for Phase II
  • Rotatable collimators for Phase I
  • Integrate accelerator effort with CERN planning
  • Become players in IR upgrade planning
  • Articulate goals of electron cloud effort
  • Take a lead role in injector chain.

4
Phase I Construction Project (LAUC)
  • Components
  • NbTi separation dipoles, based on RHIC
  • Nb3Sn out.
  • NbTi quads not well meshed (maybe make plug
    compatible Nb3Sn for later installation?).
  • Collimators
  • SLAC prototype vs. two nonexistent CERN designs
  • Instrumentation
  • Laser profile monitors
  • Linac LLRF
  • My goal is to decouple LAUC from LARP as much as
    possible.
Write a Comment
User Comments (0)
About PowerShow.com