Title: PowerPoint Presentation - ELCO Town Presentation
1Lebanon
Eastern Lebanon County School District Feasibili
ty Study Presentation April 7, 2008 May 5, 2008
Providing a Client Oriented Approach to
Architecture
Crabtree, Rohrbaugh Associates,
Architects Mechanicsburg, Pennsylvania
2Facility Study Tasks / Goals
- Facility Analysis/Assessment of Myerstown
Schaefferstown - Civil Engineering Evaluation
- Enrollment Projection Analysis
- Update Building Capacities
- Develop Educational Specifications
- Evaluate All District Resources
- Develop Building / Site Options
- Develop Building / Site Cost Estimates
- Develop Master Schedule
2
3Enrollment Projection Analysis K 12 Model
3
4PDE Enrollment ProjectionK 5 Model
4
5Schaefferstown ElementaryExisting Floor Plan K
5
5
6Schaefferstown Elementary School Civil
Engineering Evaluation
- Current Conditions
- No Expansion Permitted Existing system cannot be
modified to accept additional sewage from a
school expansion. - Proximity Non-Compliance PaDEP will not permit
the installation of new On-lot sewage disposal
systems. - PDE reasonable Construction Standards PDE
requires the School Board and design professional
certify the scope of the proposed project will
bring the existing facility to a level of current
construction standards (20 years). - Conclusions
- Connect to public sewer to ensure long term
sewage disposal is provided and comply with PDE
construction standards reference. - Renovate the existing facility without State
reimbursement. - Determine an alternate location to provide
adequate space for a new facility.
6
7Option Summary
7
8Option Summary
8
9Option Summary
9
10Myerstown Elementary Existing Floor Plan K - 5
10
11Myerstown Elementary Proposed Plan K 5
Scenario
11
12PDE Enrollment Projection3 - 5 Model
12
13New Intermediate SchoolProposed Site Plan
13
14New Intermediate SchoolFirst Floor Grades 3 - 5
14
15New Intermediate SchoolSecond Floor Grades 3 -
5
15
16Project Cost SummaryOption for New Intermediate
School
16
17Jackson Elementary Existing Floor Plan K- 5
17
18Jackson ElementaryGrade Re-alignment K- 2
18
19Jackson Elementary PHASE TWO6 Classroom
Expansion K - 2
19
20Preliminary Project Cost SummaryJackson
Expansion Phase Two
20
21Fort Zeller Existing Floor Plan K - 5
21
22Fort Zeller Grade Re-alignment K - 2
22
23Preliminary Project Schedule
23