  • Infrastructure Project Delivery System
  • in Japan
  • Akihiko HIROTANI
  • President, Oriental Consultants Co., Ltd
  • President, Japan Association of Japanese
    Consulting Engineers (AJCE)
  • President, Japan Civil engineering Consulting
    Association (JCCA)
  • Chairman, FIDIC member Association in the Asia
    Pacific Region (ASPAC)

2
Presentation Outline
  • CBS system in Japan
  • QBS system in Japan
  • Trend of delivery system in Japan
  • Challenges in the near future
  • Summary

3
Cost-Based Selection (CBS) in Japan
  • Public Accounts Act (1889) enforces CBS as a
    rule.
  • The cost has been emphasized much more than the
    quality.
  • CBS disregards human intellectual product and
    technical know-how.
  • As a result, CBS has caused bid-rigging and
    low-price tender problem, even among consultants
    selection.

4
Bid-rigging and low-price tender
  • In Japan, bid-rigging or low-price tender had
    been considered to be unavoidable.
  • In August 1999, it became a social problem that
    many consulting firms including members of Japan
    Civil Engineering Consulting Association (JCCA)
    were involved in bid-rigging.
  • CBS may cause lower service quality and betray
    the public interest .

5
Advantages of Quality-Based Selection(QBS)
  • Japanese consultants had been promoting among
    JCCA activities QBS as selection method to be
    adopted by clients for a long time.
  • QBS
  • Promotes technological innovation
  • Provides life-cycle savings
  • Satisfies public interest
  • Encourages competition based on merit
  • Promotes communication

6
For promoting QBS -ATI framework-
  • ATI framework is a target for Japanese consulting
    engineers in the mid/long term proposed by JCCA
    in 1989.
  • ATI framework envisages that consulting engineers
    should be technologically spirited.
  • JCCA has been insisting on the importance of the
    technology of consulting engineers or the quality
    of their product for a long time.

Consulting engineers should be A Attractive, T
Technologically spirited, I Independent
7
For promoting QBS -Nakamura committee-
  • After the case of bid-rigging in August 1999,
    so-called the Nakamura committee was established
    in order to study the new roles of consulting
    engineers and to improve the project delivery
    system.
  • The report of this committee proposes that
  • Consulting engineers should supply the owner with
    the highest quality of consulting service for
    contributing to diversified society.
  • Delivery systems that depend on the type of the
    project should be established.

8
Trend of annual number of contracts
  • Since the proposal of the Nakamura committee, QBS
    system has been adopted greatly.
  • The cases of CBS system is decreasing, and that
    of QBS system is increasing.

9
Trend of annual amount of contracts
  • The contract amount of CBS system is decreasing,
    and that of QBS system is increasing.
  • The contract amount of QBS system is much more
    than that of CBS system by the central government
    now.

10
Quality Assurance Act
  • Quality Assurance Act was enacted in 2005 to
    guarantee selection of consulting engineers by
    qualification and technical proposal.
  • The rule of the Public Account Act still prevails.
  • General evaluation of the cost and the quality
  • Adequacy of a bid and a contract
  • More use of the private enterprise
  • Equality between Owner and Consultant
  • Quality Assurance

11
Delivery system of MLIT
  • Ministry of Land, Infrastructure, Transport, and
    Tourism (MLIT) has several kinds of delivery
    systems that depend on the type of the project.
  • QCBS (Quality and Cost Based Selection) is tried
    from 2007.

QBS
QBS
(technical proposal)
QCBS
CBS
QBS
knowledge
(technical proposal)
(cost competition)
Conception and Application
12
Problem on CE selection
  • CBS
  • Too much cost competition (cost cutting) causes
    the design errors (low quality).
  • QBS
  • -QBS is not applied in some sectors.
  • -QBS system is not popular enough among local
    governments.
  • -Owners do not have enough professional
    engineers.
  • QCBS
  • -There is a possibility that the cost may still
    prevail more than the quality.

13
Challenges in the near future
  • Promote QBS system
  • -QBS should be promoted not only in central
    government but also in local government.
  • Make much of quality in QCBS system
  • -Quality should be emphasized more than the cost
    when QCBS is applied.
  • Assist the owners
  • -Consultant engineers should assist the owners
    when the number of QBS increases.

14
Summary
  • CBS caused to lower service quality and betray
    the public interest in Japan.
  • JCCA has been promoting QBS system for a long
    time.
  • The amount of QBS system is emphasized more than
    that of CBS system in the central government now.
  • MLIT has several kinds of delivery systems that
    depend on the type of the project.

15
Summary (Cont.)
  • QCBS (Quality and Cost Based Selection) is tried
    from 2007.
  • We challenge to promote QBS system more and more
    especially in local government.
  • Quality should be emphasized more than the cost
    for the highest quality of consulting services
    and for the people.

16
  • END
Write a Comment
User Comments (0)
About PowerShow.com