Title: ACC Requirements


1
ACC Requirements
  • Work Performed via SWAT-CATS EHV

2
Studies to be Completed
  • Ten-Year Plans
  • RMR Analysis
  • Extreme Contingencies
  • More Stringent RMR analysis
  • Palo Verde Hub Risk Assessment
  • N-1-1 Analysis
  • Tenth Year Snapshot

3
Ten-Year Plans
  • To be completed by individual entity
  • Utilize seed cases jointly developed within
    SWAT-CATS group
  • Plans need to be submitted by last business day
    of January

4
RMR Analysis
  • Phoenix Area jointly studied by APS and SRP w/APS
    coordinating
  • Yuma Area studied by APS
  • Tucson Area studied by TEP
  • Mohave Area studied by UniSource
  • Douglas Area studied by UniSource
  • RMR Analysis submitted with Ten-Year Plans - end
    of January

5
RMR Analysis - Phoenix and Yuma
  • APS and SRP have contracted with ABB to use
    GridView
  • Enables use of SSG-WI database (08 15)
  • Satisfies commissions request to utilize
    transparent data
  • 2 of 3 jointly built seed cases to coincide
    with years of SSG-WI database

6
Extreme Contingencies
  • SRP to coordinate - Perform analysis on 2006
    power flow case
  • Substations with multiple transformers at a
    common voltage level
  • Take outage of all the transformers
  • Determine system adequacy
  • EHV lines in a common corridor
  • Take outage of all lines in the corridor
  • Determine system adequacy

7
More Stringent RMR Analysis
  • Each load area would take the most critical
    Extreme Contingency and re-run RMR analysis

8
Palo Verde Hub Risk Assessment
  • To be performed as part of the PV Hub-TS5 500kV
    project
  • Examine loss of (pre and post TS5)
  • PV Bus 3 units and all lines
  • Hassayampa Bus All lines
  • 3 Tie lines between PV and Hassayampa

9
N-1-1 Analysis
  • APS will coordinate
  • Using 2006 Heavy Summer power flow case
  • Determine all scheduled outages for the year
  • For each outage run all N-1 contingencies

10
Tenth Year Snapshot
  • Utilizes a power flow case at the end of the ten
    year horizon
  • Combines all the plans of the participating
    utilities for the next ten years into the same
    case
  • That case is analyzed to determine system adequacy

11
Studies to be Completed
  • Ten-Year Plans
  • RMR Analysis
  • Extreme Contingencies
  • More Stringent RMR analysis
  • Palo Verde Hub Risk Assessment
  • N-1-1 Analysis
  • Tenth Year Snapshot

12
STEP Status
  • STEP Transmission Plan
  • 1) Short Term Upgrades (Path 49 Upgrades)
  • 2) EOR 9000
  • 3) DPV2
  • 4) New 500kV Line into San Diego 2010
  • 05-04-05

13
STEP Status (cont.)
  • Meeting April 27, 2005
  • San Diego 500kV options narrowed down
  • IV Central
  • IV - Central SER/Val
  • Imperial Valley Study Group
  • Northern Lights Project
  • Next meeting June 29, 2005
  • 05-04-05

14
SSG-WI Status
Western Interconnection Transmission Planning
05-04-05
15
SSG-WI Status (cont.)
  • WAG Identified West-wide issues
  • 1) Transmission Expansion Planning
  • 2) Resource Adequacy
  • 3) Market Monitoring
  • 4) Commercial Issues
  • Pricing
  • Unscheduled Flow
  • Congestive Management
  • Western Influence Nationally
  • 05-04-05

16
SSG-WI Status (cont.)
  • SSG-WI PWG
  • Study Plan 2008, 2015
  • Technical groups formed
  • Load
  • Resources
  • Transmission
  • 05-04-05

17
PV-TS5
  • CEC filed May 2, 2005
  • Hearings with AZ Line Sitting Committee June 6
    7, 2005
  • Scheduled in-service date June 2007
  • Start from PV or Arlington
  • Agreement being negotiated between APS Duke
  • 05-04-05

18
PV TS5 (cont.)
  • Hassayampa Junction Option
  • APS, SCE, Harquahala Meeting April 22, 2005
  • Technical Studies
  • Indicate initial rating on order of 500MW before
    TS5 Raceway in service
  • PV Hub risk analysis underway
  • 05-04-05

19
TS5 - Raceway
  • Scheduled in service 2010
  • Preliminary permitting work underway
  • Technical Studies July 2005
  • 05-04-05

20
Palo Verde - Yuma
  • 500kV and 230kV options considered
  • Interested Parties
  • APS
  • IID
  • SDGE
  • Welton Mohawk
  • Composite Technology Corporation

21
Palo Verde Yuma (cont.)
  • Need Update
  • APS Ten-Year Plan 2012
  • IID and Welton Mohawk early as 2008
  • Technical Study work underway
  • Preliminary permitting underway
  • MOU for permit cost sharing being developed
  • Next Meeting May 18, 2005 at APS
  • 05-04-05

22
Raceway Pinnacle Peak
  • In-Service 2012
  • Interested Parties
  • APS
  • SRP
  • WAPA
  • Composite Technology Corporation
  • Preliminary permitting work underway
  • Want to file CEC late 2005
  • 05-04-05

23
Path 49 Upgrades
  • SCE
  • Palo Verde Devers Series Capacitor Upgrade
  • Second Devers 500/230kV Transformer
  • 400 MVAR SVC at Devers
  • APS
  • Hassayampa North Gila Series Capacitor Upgrade
  • Hassayampa North Gila Sag Mitigation
  • 05-04-05

24
Path 49 Upgrades (cont.)
  • SDGE
  • North Gila Imperial Valley Series Capacitor
    Upgrade
  • IID
  • Phase Shifting Transformer
  • Project Participation Agreement
  • Only issue is SDGE cost for APS IID schedules
  • Resolution expected by Mid-May 2006
  • 05-04-05

25
Path 49 Upgrades (cont.)
  • Scheduled In-service date June 2006
  • Technical Outage Coordination Schedules Completed
  • Tom Isham (APS) Path 49
  • Jim Hsu (SRP) PV-HS gen limit
  • Ying He (SCE) SCIT
  • Project Management Team formed
  • 05-04-05