Title: MEETING THE WATER DEMANDS
1MEETING THE WATER DEMANDS FOR THE KINGDOM OF
SAUDI ARABIA Major Investment Opportunities
in the 21st Century November 13-15, 2000
2(No Transcript)
3OBJECTIVES OF THE PRESENTATION
- AN OVERVIEW OF GLOBAL WATER SUPPLY AND DEMAND
- SUMMARY OF WATER SERVICES IN THE KINGDOM
- SCOPE OF SERVICES OF SALINE WATER CONVERSION
CORPORATION (SWCC) - A FUTURE OUTLOOK OF WATER SUPPLY AND DEMAND IN
THE KINGDOM AND BUDGETARY CONSEQUENCES. - CONCLUDING REMARKS
4AN OVERVIEW OF GLOBAL WATER SUPPLY AND DEMAND
5 WORLD WATER SURVEY(1)
- WATER RESOURCES (100 )
1,384,000,000(Km)3 - SWEET WATER (2.6 )
36,000,000(Km)3 - SWEET WATER USABLE (0.24 )
2,880,000(Km)3 - ANNUAL TOTAL PRECIPITATION (0.03 )
423,000(Km)3 - ANNUAL RAIN ON THE
- CONTINENTS
(0.007 ) 97,000(Km)3 - ANNUAL SWEET WATER
- CONSUMPTION
(0.0002 ) 2,838(Km)3 - ANNUAL DRINKING WATER
- CONSUMPTION
(0.000015 ) 201(Km)3 - or 0.2 of the continental
precipitation.
(1) The UNO - Drinking- Water Decade (1980 - 1991)
6 GROWTH OF WORLD POPULATION (1)
(1) The UNO - Drinking- Water Decade (1980 - 1991)
7Development of World Population
(1)
Inhabitants in million
(1) The UNO - Drinking- Water Decade (1980 - 1991)
8Situation of Global Water Supply
(1)
In of supplied population
(1) The UNO - Drinking- Water Decade (1980 - 1991)
9Situation of Global Waste Water Disposal
(1)
Population with sanitation in
(1) The UNO - Drinking- Water Decade (1980 - 1991)
10Worldwide Cumulative Capacity of all land-based
desalting plants capable of producing 100
(m3/d)/unit or more fresh water vs. Contract year.
(1)
Contracted Capacity (m3/day)
Contract Year
(1) 2000 IDA Worldwide Desalting Plants Inventory
Report No. 16
11SUMMARY OF WATER SERVICES IN THE KINGDOM
12POTABLE WATER SOURCES IN THE KINGDOM
SURFACE WATER (LAKES, RIVERS, DAMS)
UNDERGROUND WATER
SEAWATER DESALINATION
13AUTHORITIES RESPONSIBLE FOR WATER ACTIVITIES IN
THE KINGDOM OF SAUDI ARABIA
14SCOPE OF SERVICES OF SALINE WATER CONVERSION
CORPORATION (SWCC)
15HISTORICAL BACKGROUND OF SEAWATER DESALINATION
IN THE KINGDOM OF SAUDI ARABIA
- 1348H (1928G) ESTABLISHMENT OF THE FIRST TWO SEA
WATER CONDENSERS AT JEDDAH BECAME KNOWN AS
AL-KINDASA. - 1385H (1965G) AN OFFICE HAD BEEN ESTABLISHED AT
THE MINISTRY OF AGRICULTURE WATER FOR
FEASIBILITY STUDY AND THE PREPARATORY STEPS FOR
DESALINATION PLANTS CONSTRUCTION. - 1389 H (1969G) OPERATING PHASE 1 OF AL-WAJH
AND DUBA PLANTS. - 1390 H (1970G) OPERATING JEDDAH PLANT PHASE 1.
- 1392 H(1972G) ASALINE WATER CONVERSION
DEPUTYSHIP HAD BEEN ESTABLISHED AT THE MINISTRY
OF AGRICULTURE AND WATER. - 1393 H (1973G) OPERATING AL-KHOBAR PLANT (PHASE
1). - 1394H (1974G) ROYAL DECREE NO. M/49
ESTABLISHING SALINE WATER CONVERSION
CORPORATION AS AN INDEPENDENT GOVERNMENTAL
ENTITY. - 1394 H (1975G) OPERATING UMLUJ PLANT PHASE 1.
- 1398H (1978G) OPERATING JEDDAH PLANT PAHSE
II (SWCC HAS TAKEN THE RESPONSIBILITY OF
OPERATING AND MAINTAINING OF ITS PLANTS) - 1399H (1979G) OPERATING FIVE PLANTS AT
AL-WAJH, DUBA PHASE 1, JEDDAH PHASE III
HAQL PHASE 1.
16HISTORICAL BACKGROUND OF SEAWATER DESALINATION
IN THE KINGDOM OF SAUDI ARABIA
- 1401 H (1981G) OPERATING YANBU PLANT PHASE 1
JEDDAH PHASE IV. - 1402 H (1982G) OPERATING THREE PLANTS AT
AL-JUBAIL PHASE 1, RABIGH PHASE 1 AL-KHOBAR
PHASE II AND THE TRAINING CENTER AT JUBAIL. - 1403 H (1983G) OPERATING AL-BIRK PLANT PHASE
1, AL-JUBAIL PLANT PHASE II. - 1407H (1986G) OPERATING AL-WAJH PLANT FIRST
EXTENSION, AL-KHAFJI AND UMLUJ PLANTS PHASE
II. - 1409H (1989G) OPERATING FIVE PLANTS AT DUBA
PHASE III, AL-WAJH SECOND EXTENSION, JEDDAH
R.O. PHASE 1, SHOAIBA PHASE 1 AND SHUGAIG
PHASE 1. - 1410 H (1990G) OPERATING OF HAQL PLANT PHASE
II AND FARASAN PLANT FIRST EXTENSION. - 1413 H (1993G) OPERATING OF AL-WAJH THIRD
EXTENSION. - 1414 H (1994G) OPERATING JEDDAH R.O. PLANT
PHASE II RABIGH FIRST EXTENSION. - 1419 H (1999G) OPERATING YANBU PHASE II (MSF
R.O.). - 1421 H (2000G) PARTIAL COMMISSIONING OF
AL-KHOBAR (PHASE III), SHOAIBA (PHASE II).
17HAQL
AL-KHAFJI
DUBA
ALZULFI
ALMAGMAAH
AL-JUBAIL
HODATSIDAIR
AL-WAJH
BRAIDAH
AL-KHOBAR
ALHISI
UMM LAJJ
ALGHAT
ALMADINA
SHGRA
YANBU MADINAH
RIYADH
RABIGH
MAKKAH
AZIZIA
JEDDAH
TAIF
SHOAIBA
AL-BIRK
ABHA
KHAMIS MUSHAIT
SHUQAIQ
FARASAN
18HAQL R.O. PLANT PHASE II 3,784 m3/d
ALWAJH (MSF)PHASEII 473 m3/d ALWAJH(MED)TR1
825 m3/d ALWAJH (MED)TR2 1032 m3/d
ALWAJH (MSF)TR3 473 m3/d
DUBA R.O. PLANT PHASEIII 3,784 m3/d
UMMLUJJ R.O. PLANT PHASE II 3,784 m3/d
YANBU-MADINAH PLANTS PHASE I MSF 94,625
m3/d 250 MW PHASEII MSF 120,096 m3/d 35
MW PHASE II R.O. 106,904 m3/d
RABIGH MSF PHASE1 1204 m3/d RABIGH MSF TR1
774 m3/d
AZIZIA MED PLANT 3,870 m3/d
JEDDAH MSF PLANTS PHASE II
37,916 m3/d 71 MW PHASE III
75,987 m3/d 200 MW PHASE IV 190,555
m3/d 500 MW JEDDAH R.O.-1 48,848
m3/d JEDDAH R.O.-2 48,848 m3/d
ALSHOAIBA MSF PLANT PHASE I 191,780 m3/d
157 MW
ALSHOAIBA MSF PLANT PHASE II 390,909 m3/d
340 MW
AL-BIRK R.O. PLANT PHASE I 1,952 m3/d
SHUQAIQ MSF PLANT PHASE I 83,432 m3/d 62 MW
FARASAN MSF PH.I 430 m3/d FARASAN MSF TR1
1075 m3/d
19AL-KHAFJI MSF PLANT PHASE II 19,682 m3/d
AL-JUBAIL MSF PLANTS PHASE I 118,447 m3/d
238 MW PHASEII 815,185 m3/d 762 MW
AL-JUBAIL R.O PLANT 78,182 m3/d
AL-KHOBAR MSF PLANT PHASE II 191,780 m3/d
500 MW
AL-KHOBAR MSF PLANT PHASE III 240,800 m3/d
311 MW
20SWCC DESALINATION POWER PLANTS
21(No Transcript)
22Development in SWCC Installed Water
Capacities(Includes Decommissioned Plants)
Cumulative Contracted Capacity (m3/day)
Contract Year
23Development in SWCC Installed Electric Power
Capacities (Includes Decommissioned Plants)
Cumulative Contracted Capacity (MW)
Contract Year
24Annual Desalinated Water Exported by SWCC Plants
(from 1981 to 1999)
Million Cubic Meter Per Year
25Annual Electric Energy Exported by SWCC Plants
(from 1981 to 1999)
Million Megawatt Hour
26Years of Training Operation Maintenance
Graduates 2507
O M Graduates Number
27Years of Training Engineers Graduates 263
Engineers Graduates Number
28O M MANPOWER
29PERCENTAGE BREAKDOWN OF THE AVERAGE WATER COST
OF SWCC PLANTS
- CAPITAL COST 37.3
- LABOUR
22.1 - ENERGY
32.5 - MAINTENANCE 6
- CHEMICALS
2.1
30WATER ELECTRIC ENERGY PRODUCTION COST (1998)
31(No Transcript)
32(No Transcript)
33A FUTURE OUTLOOK OF WATER SUPPLY DEMANDIN THE
KINGDOM AND BUDGETARY CONSEQUENCES
34FORECASTED POPULATION GROWTH IN THE KINGDOM OF
SAUDI ARABIA
35Decommissioning of the Existing SWCC Desalination
Plants (from 2000 to 2020)
(m3/day)
36(No Transcript)
37ASSUMPTIONS USED TO ESTIMATE FUTURE BUDGETS
- Desalinated seawater accounts for 50 of water
supply. - New plant size has been taken as 60 MIGD to meet
the water demand with corresponding power of 360
MW (16 ratio). - Plants construction starts 5 years ahead of
required production date. - Construction expenditure is over 5 years (10,
20, 35, 25 and 10 each year consecutively).
38(No Transcript)
39(No Transcript)
40(No Transcript)
41CONCLUDING REMARKS
42CONCLUDING REMARKS
- CONSOLIDATE THE WATER SERVICES
- PROVIDE MANAGEMENT FLEXIBILITY.
- INVEST IN EXISTING INFRASTRUCTURE
- REHABILITATE DESALINATION PLANTS
- REDUCE DISTRIBUTION NETWORK LEAKAGES
- OTHERS
- CONSERVE
- PUPLIC CAMPAIGNS
- LEGISLATION
- ALTERNATIVES
- TARIFF
- REUSE (RECYCLE)
- RESEARCH DEVELOPMENT
- STUDY PRIVATE SECTOR INVOLVEMENT
43See our SWCC site www.swcc.gov.sa
Water Means Life
THANK YOU FOR YOUR ATTENTION