Village Electrification using 100% Rice-husk powered Gasifier System - PowerPoint PPT Presentation

About This Presentation
Title:

Village Electrification using 100% Rice-husk powered Gasifier System

Description:

Population approx. 1200 excluding migrants a thriving marketplace with over 50 shops ... with govt approved suppliers the cost is over Rs 25,00,000 ... – PowerPoint PPT presentation

Number of Views:110
Avg rating:3.0/5.0
Slides: 32
Provided by: G428
Category:

less

Transcript and Presenter's Notes

Title: Village Electrification using 100% Rice-husk powered Gasifier System


1
Village Electrification using 100 Rice-husk
powered Gasifier System
  • Vill Tamakuha,
  • Distt West Champaran, Bihar

2
  • A Non-Govt Organization registered in 2007 under
    the Societies Registration Act 21, 1860
  • Based in Patna, Bihar
  • Funded by NRIs as well as local residents

3
  • Mission
  • Empowerment of remote and neglected rural areas
    of Bihar through spread of Energy and smart
    Agricultural practices
  • Goal for the project
  • To provide clean electric lighting to the
    households in Tamkuha at a rate cheaper than
    their current expenditure

4
Site Selection
UP on 3 sides and the erratic Great Gandak on the
fourth
5
Site Selection
  • Population approx. 1200 excluding migrants a
    thriving marketplace with over 50 shops
  • No. of households approx. 350
  • Distance from distt. Headquarter - 150 km
  • Distance from electrical substation 82 km
  • Distance from nearest railhead 47 km
  • Paddy production of over 1200 tonnes/year

6
Technology
  • Has to be non-conventional
  • Solar energy is expensive
  • Approx. Rs. 400 / W for installation
  • Wind energy is not amply available
  • Hydel power is not feasible
  • High cost of establishment
  • Approx. 7 km from the nearest river
  • Biomass energy is practically the only available
    option

7
Technology Biomass Gasifier
8
Technology Biomass Gasifier
9
Technology Biomass Gasifier
Dual Fuel Mode - Very Commonly Used
Single Fuel Mode we are the first using
rice-husk
10
A Short Movie
11
Cost of Establishment
Total Cost Rs 10,00,000
We teamed up with new suppliers for the gasifier
and the generator with govt approved suppliers
the cost is over Rs 25,00,000 our system is
cheaper even without the govt subsidy
12
Operating Expenses
  • Approx. 50 kg Rice-husk / hour
  • One LPG cylinder per 4 starts
  • 3 personnel
  • Misc. expenses on maintenance of the system

13
Power Distribution
14
Power Distribution
  • Power supply for 6 hrs in the evening
  • Pre-paid power at the rate of Rs. 30 per 15-20 W
    CFL for households and Rs. 40 per 15-20 W CFL for
    businesses
  • Only CFL allowed for lighting
  • Total 300 connections
  • Avg. less than 2 CFL per connection
  • Approx. Rs. 50 per connection
  • Approx. 65 A electricity usage at 210-220V (As
    read at the plant)
  • Approx. 15 distribution loss

15
Power Distribution - Economics
  • BIG PROBLEM

16
Power Distribution - Economics
  • Rice husk at 90p per kg
  • Rs. 0.9 50 6 30 per month
  • Had planned it at 50p per kg
  • LPG cylinders are expensive
  • Cant procure enough from the LPG dealers at the
    controlled prices
  • Rs 500 per cylinder in the black market
  • Rs. 500 10 per month

17
Power Distribution - Economics
Total expenditure Rs 22,000 per month
Collection of only Rs. 15,000 per month
18
Power Distribution EconomicsSolution
  • Generate own rice-husk
  • Remove the LPG

19
Power Distribution EconomicsGenerating
Rice-husk
  • Setup a mini Rice mill in partnership with a
    local at the plant
  • Milling capacity of 400 kg paddy per hour using
    approx. 15 A / phase
  • Milling at zero cost to attract consumers
  • Operation and depreciation cost to be recovered
    by sale of the bran
  • Approx. Rs 10,000 per month (Rs. 4000
    organizations share)
  • Operate the dehusker and polisher alternatively
  • Possible to operate in parallel with the
    electricity supply to users
  • Generation of 300 kg rice-husk per day
  • Daily consumption is approximately the same
  • More than 40 rice-husk generated assuming 6
    months operation of the rice mill
  • Cost of setting up the rice mill Rs. 70,000
  • Organizations share Rs 35,000

20
Power Distribution - Economics
  • Total Investment Rs. 10,35,000
  • Total Expense Rs. 17500 per month

21
Power Distribution EconomicsRemoving the need
for LPG
  • Store the Producer Gas for usage during the next
    start
  • Storage at 200 psi
  • Less than 10 leakage in 24 hours
  • Adds Rs 10,000 to the cost

22
Power Distribution - Economics
  • Total Investment Rs. 10,45,000
  • Total Expense Rs. 12500 per month

23
Power Distribution - Monitoring
  • Fuses with every connection to check extreme
    theft of power
  • Not aware of any efficient circuit breakers for
    20 W power range
  • 5-volunteer Gramin Urja Niyantran Samiti formed
    to check the power theft as well as the regular
    fulfillment of operators responsibilities
  • Entire village divided in 4 sectors and
    2-volunteer teams formed to assist in timely
    collection of advance dues
  • Not an easy task
  • Need to generate more revenue to keep the
    operations fairly independent of collections from
    the users

24
Power Distribution Further Improvements
  • approx. 30 A current in one phase still
    remaining
  • Run a 3 hp water pump for irrigation
  • Compare Rs 30 per hour vs Rs 80 per hour for 5 hp
    pump sets
  • Approx. Rs 3000 per month for 5 months
  • Adds Rs 15,000 to total investment
  • Working to add a wheat grinder to the rice-mill
  • Possible because only the dehusker or the
    polisher of the rice-mill run at one time
  • Would add Rs. 15,000 to total investment (7.5K in
    partnership
  • Would add approx. Rs. 5000 per month in earning
    (Rs 2500 being the organizations share

25
Winter Economics
  • Total Expense Rs. 12,500 pm
  • Collection from the users Rs 15,000 pm
  • Income generation from subsidiary activities
    Rs. 7000 pm (very very conservative projection )
  • Net saving of approx. Rs. 9,000 pm
  • Daytime operation expected to commence in january
  • Primarily for irrigation and operation of the
    rice-mill / wheat grinder
  • May expect an additional income of approx. Rs.
    9000 pm

26
For the Summer
  • Expect the demand to grow 100
  • Rice-mill wouldnt operate
  • Revenue of Rs. 30,000 from evening operations
  • Expect at least as much load as winters during
    the day
  • Revenue of approx. Rs. 15,000
  • Opportunity for catering power to threshers
  • Operations cost approx. Rs 25,000 pm
  • A saving of over Rs. 20,000
  • Need to store husk for the rainy days
  • Ample space (over 4000 sq feet) land for stocking
  • Ample husk in the area currently
  • We have verbal contracts with over 6 rice-mills
    in the area for 100 of their rice-husk

27
Timeline
28
So Far
  • Total Investment of 11,00,000
  • Including Rs. 25,000 in maintaining operations in
    the initial months
  • Conservatively projected savings of Rs. 15,000 pm
    averaged over a year
  • Carbon credit cash from European Agencies worth
    approx. Rs. 50,000
  • Return of more than 20 p.a.
  • System pays itself off in 5 years only

29
Future
  • Extend the concept to at least 25 villages in the
    rice-rich region in next 2-3 years

30
Roadblocks
  • Political boundaries
  • Has to pass through UP to reach this unfortunate
    region of Bihar from Bihar
  • We dont know of a legal way to transport goods
    through the Bihar UP and UP Bihar border
  • Need funds a lot of it
  • Seeking help from banks, investors and donors

31
Acknowledgements
  • Mr. S.K. Singh, PSO, MNRE, Patna
  • M/s Ganesh Engg. Works, Buxar (Gasifier supplier
    )
  • M/s Prakash Diesels, Agra (Generator supplier )
  • Our Family and Friends for constantly doubting
    and/or encouraging us