Title: Plant Visit TBM Demonstration Herrenknecht Schwanau, Germany June, 2005
1Plant Visit TBM Demonstration Herrenknecht
Schwanau, Germany June, 2005
- June 2005 Metro Goldline Eastside Extension
Project
2Metro Los Angeles ELRT ProjectMarj and Suzie
June 2005
3General Layout EPB Shield
4TBM Profile
5Discussion
- Cutting Wheel
- Pressure Chamber
- Screw Conveyor
- Foam Injection Steering and Thrust Systems
- Segment Handling
- Backfill Grout System
- Grout Mixing
- Wear Detection
- Operators Room
- Air Locks
6Other Projects
- Herrenknecht Plant Tour
- Katzenberg Tunnel, Germany
- Calle 30 TBM for Madrid, Spain
7Cutterhead Disc and Opening Tools
Disc Cutters can be added
8View of Trailing Gear
Rollers on Tunnel Lining
9Screw Conveyor at Pressure Chamber
Inlet Gates
Screw Conveyor
10Inside Pressure Chamber
Backloading disc cutters
Mixing Bars
11Screw Conveyor Second and Third Sections
Inspection Hatch
Color coded piping systems
12Screw Conveyor at First Joint and Discharge End
13Screw Conveyer Casing
(Feb-05)
14Screw Conveyor - without casing
(Feb-05)
15Pressure Cell on Screw Conveyor
16Foam Injection System
Entering Cutterhead Chamber
foam component lines
17Drive Motors similar machine
(Feb-05)
18Main Bearing in Fabrication (Similar TBM)
(Feb-05)
19TBM Thrust System
20Thrust Jacks Within Shield
Propel Cylinders
21Jacks and Shoes similar TBM
(Feb-05)
2216 Pairs of Propel Jacks ELRT TBM
23Articulation Joint
24Segment Trolley
Trolly Hoist
25Segment Magazine
26Segment Erector / Vacuum Lift
Note Double Gasket Grooves
27Segment Control
Vacuum erector without segment
Radio or remote control for ring assembly
28Tail Seal Grout Ports
Two Ports at four locations around shield
29Backfill Grout Lines and Tail Seal Brushes
Wire brushes to be attached
grout lines to shield
30Backfill Grouting System in Tail Shield
Grout Ports in Shield
31Backfill Grout Mixers and Automatic Controls
Mixing Tanks on Trailing Gear
32Wear Detection
Cutting Wheel Wear
Muck Bucket wear
33Operators Room
Example monitoring screen
34Airlock before Installation on TBM
(Feb-05)
35Materials Lock
36Plant Tour
37Slurry TBM with Stone Crusher
38Weinerwald Rail Tunnel TBMs
39Microtunnels (less than 12-ft dia.)
40Directional Drilling
41Machine Recycling
42Katzenberg Rail TunnelEPB Machine
43Cutterhead at Face
44Screw Conveyor at Chamber
45Wire Brush Seals
46TBM Breakout Frame
47Segment Plant at Site
48Largest EPB TBM in World in Fabrication
4952-ft. dia. for Calle 30, Madrid
Eli Choueiry