Title: THREE Known KEY Assessments
1THREE Known KEY Assessments
- ISM Program Independent Assessment
- Scoping Visit September
- On site October
- Results will be used as a base line for
improvements - Possible OA - 40 ISM Program Assessment FY06
- Similar to 2000 verification Assessment
- Large DOE team on site for a long period
- The BNL QA Program supports all aspects of ISM
- PERT Review
2Acquisition Management SystemPERT Review
- The Acquisition Management System will be
reviewed for recertification in - May 2006 by the DOE-sponsored Procurement
Evaluation Re-engineering - Team (PERT). The team consists of DOE and
contractor personnel from other - DOE facilities. Our system certification permits
us to award contracts up to - 5M without prior DOE approval (with some small
exceptions). If we lose - our certification, every order we want to issue
would require prior DOE approval. - Therefore, this review is critical to all
employees. - The review will cover all aspects of procurement.
The criteria include the - following that may be of interest to QA reps
- Personnel training, experience and knowledge to
effectively and efficiently comply with company
policy, applicable laws, regulations and DOE
prime contract requirements (this includes those
related to quality) - Solicitations and subcontracts incorporate the
required prime contract flow-down clauses to
adequately protect the Governments interest
(including quality)
3Acquisition Management SystemPERT Review
- contd
- The review will cover all aspects of procurement.
The criteria - include the following that may be of interest to
QA reps - BSA has a system for grading the performance of
subcontractors on completed subcontracts - BSA uses this grading system in determining
whether prospective contractors are responsible - BSA has a system in place to use capable and
reliable contractors who either have track
records of successful past performance or can
demonstrate a current superior ability to perform - Technical evaluations are adequate and support
source selection decisions
4Acquisition Management SystemPERT Review
- There are also the following best practice
criteria - BSA has a supplier quality and recognition
program - BSA has a system for problem identification,
data collection and analysis, and a plan for
improvement
5Quality Management Office
- Procurement
- Quality Assurance
- (QA-QP-002)
- September 2005
- Joe Labas
- QMO/PPM
6Objective
- To understand BNLs responsibility in meeting DOE
Procurement Quality requirements, including the
requirements for purchased items and services
that affect or may affect, radiological work. - How do we (BNL) fulfill our responsibility?
- Translation What is the Quality Reps. (QR) role
in - procurement?
7Procurement QA
- 7 Questions?
- Do we need to evaluate the supplier beforehand?
i.e. Is the supplier capable of providing
items/services to the requirements (technical,
quality, cost and schedule)? - Are quality requirements necessary and are they
clear, concise and communicated (flowed down)
effectively? - Is the ESHQ Risk Level (QA Cat.) commensurate
with the item/service being procured AND its use/
application? - What is the best approach to ensure requirements
are met, e.g. what type of verification is
necessary? - Is this procurement related to any radiological
work? - How do we report and track supplier problems?
- How do we monitor/rate suppliers performance?
8Agenda
- Drivers
- Internal Requirements SBMS Subject Areas
- Web Requisition
- BNL Supplier Quality Information System
- Value Added?
9Drivers External Requirements
- DOE O 414.1 (Order) and 10 CFR830.120 (Rule)
- Quality Assurance
- Both Consist of 10 Criteria
-
- 1-Program (using a graded approach)
- 2-Personnel Training Qualification
- 3-Quality Improvement
- 4-Documents Records
- 5-Work Processes
- 6-Design
- 7-Procurement
- 8-Inspection and Acceptance Testing
- 9-Management Assessment
- 10-Independent Assessment
- The BNL Quality Assurance Program addresses the
- DOE Order and Rule criteria.
10Drivers External Requirements
- DOE Quality Order and Rule
- Criterion 1 QAP
- Implement QA criteriausing a graded approach
- Criterion 3 Quality Improvement
- Nonconformance, C/A P/A
- Criterion 7 Procurement
- Procure items services that meet ESTABLISHED
requirements - Evaluate prospective suppliers
- Ensure approved suppliers continue to provide
acceptable items and services - Criterion 8 - Inspection Acceptance Testing
- Using established acceptance performance
criteria
11Drivers External Requirements
- The difference between the QA Order and the
- QA Rule
- The Order is issued by the DOE to its
contractors. - The Rule is a federal law, and is enforceable via
the Price Anderson Amendment Act (PAAA).
12Procurement-related QA Subject Areas
- Graded Approach for Quality Requirements
- Work Planning and Control for Experiments and
Operations - Screening Guidelines for Work Planning Control
and Application of the Quality Graded Approach - Supplier Evaluation (Evaluating Seller QA
Program) - Purchase Requisition Review for Quality-related
Requirements - QR (or QMO, PPM) can assist with defining quality
requirements - Inspections and Acceptance
- Calibration of Inspection, Measure, and Test
Equipment - Nonconformance, Identifying and Reporting
- Corrective and Preventive Action -
- SCAR
13Graded Approach for Quality
As defined in 10CFR 830.3, Nuclear Safety
Management Definitions
- Graded approach means the process of ensuring
that the level of analysis, documentation, and
actions used to comply with a requirement in this
part are commensurate with - (1) The relative importance to safety,
safeguards, and security - (2) The magnitude of any hazard involved
- (3) The life cycle stage of a facility
- (4) The programmatic mission of a facility
- (5) The particular characteristics of a facility
- (6) The relative importance of radiological and
nonradiological hazards and - (7) Any other relevant factor.
14Graded Approach for Quality Reqs S/A
- Intent is to apply more rigor in QA activities as
the risk/vulnerability/liability of an
activity/project increases. - The Risk Table (Graded Approach)
- Located in Work Planning Control SA
- 4 ESHQ Risk Levels
- A1 (Critical)
- A2 (Major)
- A3 (Minor)
- A4 (Negligible)
Risk-significant
15Graded Approach for Quality Reqs SA
Screening Guidelines for Work Planning Control
and Application of the Quality Graded Approach
- Proposal to reduce to 2 levels for procurements
- Risk-significant (A1/A2)
- Risk Insignificant (A3/A4)
- with Guidance linked directly to web req.
16Supplier Evaluation (QA Program) S/A
- Review of a suppliers capability (e.g. QAP) is
required if the risk is either A1Critical or
A2Major, unless - There is justification to forego an evaluation,
such as sole source (which can be considered the
evaluation), OR off-the-shelf/catalog purchases - Supplier has a documented, acceptable evaluation
BNL within the last 3 years (need to SHARE
evaluation information!) - Note Subject Area revision approved (to be
released start of FY06) that also requires an
evaluation for noncommercial procurements over
100K and to allow for evaluations other than the
QAP (e.g. technical, operational). - Several methods to performing the evaluation
- Supplier History review (documented)
- Desk-top Survey (e.g. Technical Evaluation)
- Third Party
- On-site Assessment
17Supplier Evaluation S/A
- Supplier evaluation must be documented
- Supplier Evaluation System (SES)
- Web-based, central repository for evaluations.
- http//130.199.76.90/ppm/ses/ses.asp
- Follow-up of any deficiencies is necessary.
- For A3 and A4 risk, a supplier evaluation is
optional (unless noncommercial gt 100K).
Depending on the nature of the purchase and BNLs
experience with the supplier, it may be a good
business practice to perform some level of
evaluation.
18Purchase Requisition Review for QA
- As part of generating a web requisition, the
requisitioner (with the QR) selects the quality
clauses (BNL- QA-101) that become part of the
purchase order/contract generated by PPM. These
requirements are flowed down to the supplier. - The requisitioner must designate an ESHQ Risk
Level (QA Category). - The QA-101 should be used to define the quality
requirements. Quality requirements be also
clearly stated in Statement of Work, Technical
Specification, drawings etc. - The New CONTROL GATE
- A selection MUST be made for each req. line item.
- The default will be ltblankgt and No quality
requirements necessary is a valid selection -
- The QR supports the requisitioner in this process
- Requirements should be commensurate with the Risk
level!
19Purchase Requisition Review for QA S/A
- The BNL QA-101 requirements are designed to
mitigate risk and prevent quality problems while
aiding and ensuring the requisitioner gets what
was ordered. - It also adds value! (calibration certs., test
reports, ops./maintenance manuals, change
notifications etc.) - The completed requisition is reviewed and
approved by the Dept/Div/Project before
submitting to PPM. - The Current CONTROL GATE
- Requisitions for A1, A2 items OR with a total
value gt 25K OR PAAA space must be reviewed by
a Quality Representative (or designee).
20The New Web Requisition
21The Web Requisition - PAAA Space
22Web Requisition Summary
- The Web Requisition is the mechanism for
documenting and communicating quality
requirements to PPM for flow down to the
supplier. - The Graded-Approach ESHQ Risk Level
- Established Requirements the Quality section
on req. - Prospective Suppliers Supplier Evaluation
- Requirements should be commensurate with the Risk
level!
23Inspections Acceptance S/A
- ALL purchased items must be inspected for
- Identity
- Count
- Depending on ESHQ Risk Level of the item,
additional inspection and acceptance
performance criteria may be necessary - Documented criteria and record of inspection are
required for A1 and A2 - Documented criteria is optional for A3, not
required for A4 - Subject Area currently under revision
- to require IA for noncommercial items gt 100K
- regardless of risk (i.e. A3/A4)
- to require verification of A1/A2 services
- Condition
- Suspect/Counterfeit Items (if applicable)
24Nonconformance and C/P Action S/A
- All nonconformances of purchased items or
services that are supplier-related are reported
using the BNL Supplier Nonconformance Reporting
and Tracking System (BSNC) linked in the
Nonconformance Subject Area and on the PPM
website - http//intranet.bnl.gov/PPM/bsnc/
- When appropriate, the responsible individual or
designee should request documented causal
analysis and corrective and preventive actions
from the supplier. - The Supplier Corrective Action Request (SCAR)
form (located in the Corrective and Preventive
Action Subject Area) can be used to document the
suppliers analysis and actions.
25Requirements Summary
- Current Internal Requirements (SBMS)
- Any Risk-Significant (A1/A2) procurement
requires - Supplier Evaluation N/A if O-T-S/Catalog item or
sole source (the JNCP can be the evaluation) - Quality Rep. review of requisition
- Documented acceptance criteria
- Record of inspection/test results
- Any Requisition gt25K OR in PAAA space
requires - Quality Rep. review
26Rating a Suppliers Performance
- A New Information Source (Supplier History)
- The Supplier Performance Rating System
- Report Cards are requested by PPM for all A1/A2
and gt 100K procurements - Request made to requisitioner/tech. rep. via
email - Final letter grade assigned for the PO/ contract
based on requisitoners scoring - http//130.199.76.90/ppm/SPRS.asp
27BNL Supplier Quality Information System
28What is the Value Added?
- Ensures the supplier is capable of providing the
item/service you want - Ensures you receive
- What you want (what was ordered)
- When you want it
- At a fair price (best value)
- Reduces vulnerabilities
- Improves supply base by eliminating poorest
performers (e.g. nonconformance history and
report cards) - Improves Efficiencies e.g. shared Evaluations
29Procurement QA A Team Effort