Title: IRIS : International Research of Interior of the Sun
1 AMBER/VLTI results of the first phase of the
Alignment, Integration and Verification in
Paranal PI R. Petrov (LUAN)
Pictures by Y. Bresson
S. Robbe-Dubois VLTI/AMBER AIV first results
30 years ago I2T
Nov. 2004
2European Project
LABORATOIRE UNIVERSITAIRE DASTROPHYSIQUE DE NICE
(LUAN) Project Instigator Opto-Mechanics Group
coordination OBSERVATOIRE DE LA CÔTE DAZUR
(OCA) Project management System study
Opto-mechanical study and construction LABORATOIR
E DASTROPHYSIQUE DE LOBSERVATOIRE DE
GRENOBLE Science Group management Instrument
and data reduction softwares Laboratory
integration and tests OBSERAVATOIRE DARCETRI,
FLORENCE, ITALIE Cold spectrograph MAX PLANCK
FÜR RADIOASTRONOMY, BONN, GERMANY Infrared
camera Detector software Interferometric Group
IRCOM ONERA CRAL - MPIfR
S. Robbe-Dubois VLTI/AMBER AIV first results
30 years ago I2T
Nov. 2004
3Main Scientific Program
Observation of fine structures in the disks and
jets around a sufficient number of Young Stellar
Objects Observation of the dust tori and of
the Emission Line Region of the brightest Active
Galactic Nuclei Measurement of the low
resolution spectra of Jupiter like planets
orbiting up to 0.1 a.u. away from a solar type
star at 10 pc distance
S. Robbe-Dubois VLTI/AMBER AIV first results
30 years ago I2T
Nov. 2004
4Instrument Integration at the VLTI Fev. - March
2004
OBSERVATIONS Siderostats 64-m baseline ,
40-cm telescope diameter K and H
bands, low and medium resolutions Observations
of bright stars (K0) but resolved with the 64-m
baseline
SIRIUS R30, ti0.1 s, K-band Vis. 30 (f
5.9 mas)
S. Robbe-Dubois VLTI/AMBER AIV first results
30 years ago I2T
Nov. 2004
5Commissioning 1 (May 2004)
S. Robbe-Dubois VLTI/AMBER AIV first results
30 years ago I2T
Nov. 2004
6Commissioning 2 (Oct. 2004)
- Stability of the instrument hardware OK after
a few months without observations - Routine operations in low spectral resolution
in the H and K bands (siderostats UTs) - and in medium spectral resolution in the K
and H bands (UTs). - Three telescope observations OK.
- Instrumental transfer function close to 1 with
excellent atmospheric conditions. - Limiting magnitude of AMBER in medium
resolution K about 6. - Issues remaining to be tested and checked
- Identify all sources of vibration of the VLTI.
Corrective actions are being taken. - Better VLTI baseline model required to evaluate
the AMBER limiting magnitude in low spectral
resolution. - Optimization of the entrance flux and interface
with the new VLTI IRIS image sensor. - Test of the differential OPD between bands and
Atmospheric Dispersion Compensator. - Simultaneous fringe search with 3 telescopes.
- Interface with the FINITO fringe tracker.
- Performance assessment with the ATs.
- Improve the alignment maintenance modifying
some mechanics. - Next commissioning run on sky beginning of
period P75 (starting April 2005). - Science Demonstration Time and Guaranteed Time
Observation with 3 UTs Christmas
7http//www-laog.obs.ujf-grenoble.fr/amber/
S. Robbe-Dubois VLTI/AMBER AIV first results
30 years ago I2T
Nov. 2004