Title: AO188/LGS status


1
AO188/LGS status
  • AO188 development group(Subaru Telescope, NAOJ)
  • 2009.1.16 (JST)

2
Outline
  • Current status
  • Risk shared open use
  • Commissioning schedule

3
Current stats on SR.
9.1 mag
Sky background Oct 2008
15.7 mag
Aug 2008 Sep 2008 Oct 2008 Simulation
0.4_at_0.5mm Simulation 0.7_at_0.5mm
16.6 mag
4
Current status
  • AO performance using natural guide stars (NGS)
  • Observed SR matched with simulation results at
    faint end.
  • Mismatch at bright end needs to be investigated.
  • Need more statistics at various seeing condition.
  • Detail analysis to compare the performance
    between simulation and observation is required.
  • Improvement on performance is planning.

5
Current status
  • Risk shared open use for AO188 with NGS
  • Imaging/Spectroscopy/Grism modes of IRCS are
    available.
  • AO acquisition time is about 10 to 15 minutes.
  • AO parameter tuning takes about 5 minutes.
  • 9-points dithering
  • On slit dithering
  • Field rotation correction and PA selection by AO
    image rotator.

6
Current status
  • Engineering items.
  • Non sidereal object. (Jan 15, 16)
  • Field distortion. (Analysis is on going)
  • Laser projection. (Jan 15, 16)
  • F-conversion optics for IRCS. (on going)
  • Isoplanatic angle. (Analysis is going on)
  • Extended guide star performance. (on going)
  • And so on

7
Upcoming work
  • Performance improvement.
  • Laser guide star (LGS) mode.
  • LGS upgrade at wavefront sensor.
  • Tip-tilt and focus guide star acquisition unit.
  • Tip-tilt and focus wavefront sensor.
  • Additional components.
  • ADC.
  • BS exchange system. (NGS mode lt-gt LGS mode)

8
Schedule and milestone
  • Laser projection resumed on Jan 15.
  • 9.5 engineering nights from Jan. to July.
  • S09A open use of NGS mode. (10 nights)
  • Some observing modes have a risk.
  • Fabrication, test and install for new components
    start around April, 2009.

9
Schedule and milestone
  • S09B open use of NGS mode.
  • Fully functional.
  • Engineering observation of LGS mode starts around
    autumn of 2009.
  • Risk shared open use of LGS mode from S10A.

10
Summary
  • Strehl Ratio at bright end is lower than that of
    simulation result.
  • Mostly operational in NGS mode.
  • Start testing on LGS mode this autumn.
  • Risk-shared open use of LGS mode will start from
    S10A.