Title: LiCAS


1
LiCAS
  • Linear Collider Alignement and Survey

Applied Geodesy Group
2
Overview
  • What is LiCAS
  • The ILC survey problem
  • The RTRS concept
  • The LiCAS measurement principles
  • Who works on LiCAS
  • Where are we now
  • Mechanics
  • FSI
  • LSM
  • Where will we go next

3
LC Survey Problem
  • Survey is a multi step process with single
    tolerance budget driven by accelerator physics
  • tunnel construction
  • component fiducialisation
  • component Survey ? LiCAS
  • Components survey
  • 200mm vertical our slice of tolerance budget
  • over 600m betatron wavelenght
  • Open air survey too slow and too inaccurate
  • Need new instrument that matches requirements
  • ATLAS ZEUS technologies (FSI straightness
    monitors) applicable to this problem

4
LC Survey Problem
Fiducial marker
5
RTRS concept
Tunnel Wall
LiCAS technology for automated stake-out process
Reconstructed tunnel shapes (relative
co-ordinates)
6
LiCAS Measurement Principle
Internal FSI System Dz. Dx,Dy Da,Db between
cars
Extrenal FSI System measures Wall marker location
Straightness Monitor Dx,Dy Da,Db between cars
7
Who works on LiCAS (Oxford team)
studentic
academic
Gregorz Grzelak
David Urner
DAQ-Eng. Ashley James started 21/06/04
Elec. Tech.
electronic
Mech. Tech. (Pool)
optic
mechanic
8
Oxford Alumni
DESY Collaborators
  • Johannes Prenting
  • Markus Schloesser
  • Ernst-Otto Saemann
  • Daniel Kaempnter

Edward Botcherby
Robert Apsimon Peter Baker Ken Chuang
Thomas Zlosnik Simon Wilshin Chris Glassman
9
Where are we now?
10
RTRS global Mechanics
  • Measurement car
  • full 3D designs
  • workshop drawings
  • part production started
  • Service car
  • conceptual design
  • commerical propulsion system ordered

measurement car
  • Others
  • vacuum system ready for production except for one
    seal test
  • Tunnel see next slide

service car
11
Tunnel preparation
  • 60m long service tunnel at DESY
  • fairly narrow ? difficult installation
  • Tunnel walls all prepared (removed old cable
    trays)
  • Air-conditioning installed
  • Lighting installed
  • Interlocked doors on both sides being installed
  • power and network installed
  • must perform some test on tunnel walls to check
    for stability
  • tunnel completed in 2.5 month from now (beginning
    of June)

12
LiCAS measurement units
  • Design close to completion (1 month)
  • waiting for choice of final LSM camera and FSI
    optics
  • some changes in connectorisation, service routing
    and fibre feed-throughs
  • Invar casts for bodies have been ordered
  • design of components for internal FSI completed
  • production mainly in-house

13
FSI Status
  • Two lasers operational, full DAQ chain working
    (custom photo detectors and amplifiers,
    commercial ADCs)
  • Custom USB-2 based ADC board built, firmware
    under development now
  • Expect to have complete custom detection and DAQ
    chain in two month from now
  • basic measurement principle using EDFA proven,
    expected accuracy lt 1micron

14
LiCAS FSI Implementation
15
M-FSI extension for StaFF
AM Modulation _at_ f1
C-Band Amplifier (1520-1570)
FSI Laser 1
L-Band Amplifier (1572-1630)
FSI Laser 2
f2
AM Modulation _at_ f2
Splitter Tree
AM modulator
AM Modulation _at_ f3
AOM Dn
Michelson Laser
Adjust Dn
Cavity locked to reference laser or absorption
cell
Reference Laser
Quill
Retro Reflector
GLI
Readout Board
16
New FSI Work
Splitter Tree
  • Short 6-line FSI system for 3D wall marker
    reconstruction. Still using long line optics.

Amplifier
Laser
Retro Reflector
3D-Piezo Stage
17
LSM status
  • Geometry for LSM frozen (positions of cameras and
    beam splitters)
  • One fully functional unit is operational with
  • 1 low coherence length, near IR laser
    collimation optics
  • 4 small, low cost analogue cameras 4-chan.
    grabber
  • Choosing final cameras now (CMOS?)
  • First versions of algorithm for calibration using
    differential motion of LSM unit
  • Least squares fit
  • Neural network
  • Current resolutions O(1 micron)
  • Studying view finding and accuracy of fitting as
    function of camera parameters and fitting
    algorithm
  • Studying quality of beam (shape) through the hole
    system

18
(No Transcript)
19
What do we do next
  • Up to autumn 2005
  • Completion of instrument choices
  • cameras
  • feed through
  • external FSI optics
  • Completion of FSI and LSM analysis codes
  • FSI noise suppression
  • camera calibration
  • fitting algorithms
  • Sub-system calibrations
  • Construction of 3-car prototype
  • Single car survey with CMM
  • Installation in DESY test tunnel

20
What do we do next
  • Up to Spring 2006
  • Operate prototype at DESY
  • commissioning
  • many calibration programs on full train
  • multiple test surveys of tunnel
  • tuning of operation and analysis algorithms
  • study of systematic errors
  • Up to Spring 2007
  • In Oxford
  • Improvements of component calibration programs
    hardware
  • Design of second generation instrument for X-FEL
  • much smaller ? fits into X-FEL tunnel and maybe
    ATF-2
  • much simpler ? reduce from RD to production
    functionality
  • 6 cars
  • Design stake out instrument

21
What do we do next
  • Up to Spring 2008
  • Operate improved first prototype at DESY
  • Construct second prototype
  • Operate second prototype in X-FEL
  • Construct stake out instrument
  • Operate stake out instrument in X-FEL

(needs additional funding)