Title: Southern Energy, Inc' Proposal


1
Southern Energy, Inc. Proposal
  • COSC 455
  • Presented by
  • Mark Buckner
  • Greg Mabry
  • Gabe Steger

2
Mission Statement
  • Our Vision
  • We are dedicated to building quality through
    teamwork, which will allow us to meet and exceed
    our volume goals and become a preferred provider
    of construction services in the area. By
    stressing teamwork, quality and accountability,
    we will provide our customers with exactly what
    they want and give our employees a safe, secure,
    profitable work environment.
  • Our Mission
  • To be a premium provider of quality contracting
    services, to the full satisfaction of our
    clients, with reliability, safe work practices
    and complete professionalism, and to create
    customer relationships founded on mutual respect
    and professionalism.

3
Our Goals and objectives
  • To exceed OSHA standards
  • To reduce job related injury by 50
  •  To increase revenue 10 over 5 years
  •  To recruit and retain quality employees
  •  To work as a team for the betterment of all
    parties
  •  To build a reputation as best in the field

4
Our Guiding Principles
  • Honesty Integrity
  • Responsibility
  • Fairness
  • Teamwork
  • Quality

5
Benefits of Design-Build
  • Superior quality
  • Cost savings
  • Time savings
  • Single source responsibility
  • Early cost guarantees
  • No change orders

6
Vicinity Map
Site
7
Site Logistics Plan
Secondary site access
Work area
Main drive
Building
Parking Garage
Main site access
Material and Equipment Storage
Job Trailers
Port-a-Johns
8
Site Plan
9
Floor Plans
10
Section View
11
Bid Packages
  • Long lead times
  • Site package
  • Concrete Foundation
  • Structure package
  • 5. Building envelope
  • Mechanical and electrical
  • 7. Interior packages
  • 8. Finish out package

12
1. Long Lead Items
  • Elevators
  • Major electrical components
  • Boilers and chillers
  • Any special or unique finishes

13
2. Site Package
  • Site layout
  • Driveways and parking
  • Underground electric
  • Sewer systems
  • Water lines
  • Gas lines
  • Excavation
  • Fencing

14
3. Concrete Foundation
  • Concrete foundations
  • Exterior concrete
  • Foundation waterproofing
  • Foundation insulation
  • Granular fill

15
4. Structure Packages
  • Parking garage
  • Precast concrete
  • Concrete fabrication
  • Main Building
  • Tower crane
  • Concrete or steel frame
  • Metal fabrication
  • Steel joists and decking
  • Accessories

16
5. Building Envelope
  • Curtain wall system (separate package)
  • Insulation
  • Roofing, flashing, accessories
  • Curbs, gutters, and downspouts
  • Joint sealers

17
6. Mechanical and Electrical
  • HVAC system
  • Plumbing
  • Fire suppression system
  • Electrical system
  • Alarm and security systems
  • Communications and computer networking

18
7. Interior Packages
  • Rough framing (25 gauge metal stud)
  • Rough carpentry
  • Doors, frames, and hardware
  • Drywall
  • Ceilings
  • Insulation

19
8. Finishes Package
  • Finish carpentry
  • Flooring
  • Wall coverings and painting
  • Trim
  • Special equipment

20
Schedule
21
Cost Curve
22
Unbalanced Bid Curve
23
Value Engineering
  • Super Structure
  • Pre-cast Concrete vs. Steel
  • Cladding System
  • Tinted vs. Reflective vs. Insulated

24
Precast Hybrid Moment Resisting Frame
  • Better protection of the building
  • Lenders are less likely to see defaults
  • Insurance claims should be less likely and when
    they do occur, damage claims should be reduced
  • "Down-time" may be dramatically reduced,
    protecting earnings capabilities and cash flows

25
Advantages of PHMRF
  • Design flexibility
  • Easy to construct
  • Cost competitive
  • Shorter construction duration
  • Improved lateral resistance
  • On site construction capabilities

26
Super StructureLeast First Cost
27
Super StructureLeast Life Cycle Cost
28
Cladding SystemLeast First Cost
29
Cladding SystemLeast Life Cycle Cost
30
Conclusion
  • Due to the Closeness in the relationships
    involving value engineering and life cycle costs,
    we believe that the least first cost is a good
    indicator of the best value for the project.
    Therefore, it is the suggestion of this company
    that the Southern Energy Cooperation utilize the
    following
  • A Pre-cast concrete structure
  • A mid range reflective glass cladding system
  • Thank you for your attention and confidence.