Title: Generation and Transmission
1Generation and Transmission of Electric Energy
Auctions
Francisco Romário Wojcicki Deputy Executive
Secretary
United States, June 2008
2PLAN OF PRESENTATION
- Brazilian Economic Overview
- PAC - Growth Acceleration Programme Electrical
Infrastructure - Generation of Electric Energy Auctions
- Transmission of Electric Energy Auctions
3Brazilian Economic Overview
4BRAZIL ECONOMIC DATA
Country Numbers
- Population
- 190 million
- Area km2
- 8.5 million
- GDP
- PPP US 1.79 trillion (9th in world) - 2007
- Nominal US 1.31 trillion - 2007
- Real Growth 5.4 - 2007
- Industrial GDP Growth 4.9 - 2007
- Investments
- 17.6 of GDP - 2007
- US 37.4 bi de FDI² - 2007
- Qualified as BBB- - 2008³
- International Reserves
- US 196 billion - 2008
- Commercial Surplus
- US40 bi - 2007
- 1 Estimated values
Sources World Bank, Unctad, IBGE, Ipeadata, BC
5(No Transcript)
6PAC - Growth Acceleration Programme Electrical
Infrastructure
7PAC GENERATION OF ELECTRIC ENERGY ACTIONS
- 247 actions in the area of Generation of Electric
Energy are distributed as follow - 58 hydroelectric plants
- 52 thermoelectric plants
- 15 small hydroelectric plants
- 100 alternative sources plants (PROINFA)
- 10 studies of inventory and
- 12 studies of technical-economic viability.
US 52,486 million
US 284 million
Total Investment
US 52,770 million
UHE hydroelectric plants UTE thermoelectric
plant PCH small hydroelectric plants PROINFA
programme of alternative sources
8PAC TRANSMISSION OF ELECTRIC ENERGY ACTIONS
- 82 actions in the area of Transmission of
Electric Energy are distributed as follow - 63 transmissiom lines and
- 19 substations
US 12,502 million
US 760 million
Total Investment
US 13,262 million
TL transmission line SE substations
9Generation of Electric Energy Auctions
10INSTITUTIONAL ROLES IN ELECTRIC SECTOR
Formulate Policies
Government
Planning
Fiscalization ANEEL
Regulation ANEEL
Promotes Guarantee of Supply
- MME - Ministry of Mines and Energy
- CNPE - National Council for Energy Policy
- ANEEL - National Electric Energy Agency
- CCEE - Board of Trade of Electricity
- CCEARs - Contract for Electric Energy in
Regulated Market
11MARKETING OF ELECTRIC POWER IN BRAZIL
- The marketing of electric energy in Brazil takes
place in two environments - The Regulated Market (ACR), which seeks the care
of urban and rural households and small
businesses and industries - The Free Market (ACL), covering the major
commercial and industrial power that can
negotiate the electric energy without the
mediation of the companies of distribution of
electric energy - The supply of electricity is provided based on
market rules that generate the necessary signals
achieve adequate investment. - In the specific case of the ACR, such rules of
the market are demonstrating through a chain of
public auctions in which the distributors seek
long term contracts.
12MARKETING OF ELECTRIC POWER IN BRAZIL
Competitiveness in the generation
Rates of supply resulting from auctions
Prices of supply freely negotiated
Regulated Market ACR
Free Market ACL
D
CL
C
D Distributors/ Captive Consumers CL Free
Consumers C Merchant
Relationship of proximity between ACR And ACL
13MARKETING OF ELECTRIC POWER IN BRAZIL
Competitiveness in the generation
Gn
G1
G2
Gk
C
...
D1
D2
Dn
CL
CL
CL
Regulated Market (ACR)
Free Market (ACL)
Hiring bilateral treaty Auctions promoted by
CCEE (long-term contracts)
Hiring freely negotiated
Recruitment adjustment Auctions promoted by CCEE
(hiring by up to 2 years)
14MARKETING OF ELECTRIC POWER IN BRAZIL
- The electric energy traded at ACR auctions can be
purchased on arrangements for hiring by
availability (real option) or quantity - Investors can participate in the auctions with
private equity exclusively or in partnership with
state enterprises - The thermoelectrics plants are usually objects of
Societies of Specific Purpose - SPE with minority
participation of Petrobras - Investment in hydroelectric plants have been
driven by partnerships (consortia or SPEs) among
major consumers, banks, financiers, contractors,
state enterprises (of Federal Government and of
States) and private generators.
15ANNUAL AUCTIONS OF ELECTRIC ENERGY
Liquidation EX-POST
HIRING OF NEW ENERGY
ADJUSTMENT CONTRACT
HIRING OF EXISTING GENERATION
- 1st Auction of reserve of power (07/30/08)
- Auction of New Energy A-3 (08/12/08)
- Auction of New Energy A-5 (08/28/08)
16STAGES UNTIL THE ENTRY INTO OPERATION
17AUCTIONS OF NEW ENERGY
18PROJECTS FOR FUTURE AUCTIONS
19PROJECTS FOR FUTURE AUCTIONS
Auction 2010 - Generation
20Transmission of Electric Energy Auctions
21TRANSMISSION OF ELECTRIC ENERGY AUCTIONS
- Compose the Transmission of Electric Energy
Auctions, as provided in Section IV of Law
9.074/1995, installations of Basic Network. - The Power Licensor define, among the facilities
for transmission - those intended for training of Basic Network of
the interconnected systems - those on the scope of the dealer's own
distribution and - those for exclusive interest of central
generation. - The granting of the concession will be through
auctions with operating rules approved by ANEEL - The contracts of concession period is 30 years.
22TRANSMISSION OF ELECTRIC ENERGY AUCTIONS
- Can participate in the auctions of transmission
- Domestic or foreign companies, either alone or in
consortia - Investment funds with participation registered in
the Securities Commission - CVM, that attend the
conditions of prior-qualification (legal,
financial and technical-economic) - Distribution Companies may not participate in the
prior-qualification, because it is forbidden to
them, among others, the activities of electric
power transmission (Basic Network).
23DEFINITION OF ENTERPRISES FOR BIDDING AT AN
AUCTION
- MME leads to consolidate of the PAR and PET,
aimed at the development of the Transmission
Granting Programme, which is the elaboration and
distinction of all works that will be auctioned
and all works that will be permitted.
MME - Ministry of Mines and Energy ANEEL -
National Electric Energy Agency ONS - National
System Operator EPE - Company Energy Research
24STAGES UNTIL THE ENTRY INTO OPERATION
EVTE/R1 Feasibility Study Technical And
Economic R2 Detailing the Alternative
Reference R3 Characterization and Analysis
Socio-Environmental R4 Characterization of the
Existing Network
25PROJECTS FOR FUTURE AUCTIONS
26PROJECTS FOR FUTURE AUCTIONS
() New enterprises will be included by the
planning cycle from 2008 to 2010
() New enterprises will be included by the
planning cycle from 2008 to 2010
27Thank you!