Technologies
  • MineMAX Planner Pit Optimization
  • MineMAX Scheduler Strategic Schedule
    Optimization with Blending, Stockpiling and
    Complex Mineral Process Modelling
  • MineMAX iGantt Activity-based Gantt Chart 3D
    Production Scheduling

3
MineMAX Planner
  • Pit Optimization

Planner brings together the technologies of
optimization and 3-D interactive visualization to
provide a mining engineer with a user-friendly,
fast tool for determining optimal pits and
performing strategic analysis
4
Scheduler Strategic Schedule Optimization
  • Optimise NPV
  • Satisfy Blending Requirements
  • Model Series and Parallel Material Flow
  • Alternative Process Routes
  • Alternative Products with own prices
  • Address Intermediate Stockpiling
  • Consider Multiple Pits / Mines

5
iGantt View
6
Interactive Gantt Chart
  • Resource, location or process-based view of
    activities.
  • Easily change the start time, rate, and resource
    allocation of activities within the Gantt chart.
  • Visually set precedences between activities
    related to mining logic.

7
Detailed Rate Modeling
  • Change development rate over time on a
    development heading.
  • Include work calendar information when
    considering rates.

8
Equipment Scheduling
  • Schedule equipment considering
  • Different mining rates for varying ground
    conditions
  • Scheduled equipment maintenance
  • Operator availability.

9
3-D Visual Scheduling
  • Simple point and click scheduling using
  • Strings for development centrelines
  • Triangulated solids for stopes
  • Click on a 3D object to
  • sequence the activity on a resource
  • Set a precedence with another activity
  • String files associated with development and
    triangulation files associated with stope shapes
  • Vulcan
  • Datamine
  • Surpac

10
Custom Reporting
  • With advanced attribute and resource conditions,
    dynamically update reports as you schedule.
  • Locational Conditions
  • Resource Conditions
  • Process Conditions
  • When your schedule is ready for release, all
    reports can be exported as csv.

11
Auto-Generate Precedences
  • Use geometry-based auto-precedence generation to
    automatically create precedences for adjacent
    development strings
  • Uses geometry of development strings to deduce
    physical mining precedences

12
Auto-Scheduling
  • Automatically adjusts heading development rates
    to ensure maximum equipment utilization at all
    times.
  • Optionally limits the maximum number of
    concurrent development headings.
  • Can limit both maximum total development rate
    and maximum individual heading development rate.
  • Able to interrupt development of a heading when
    a higher priority heading becomes available

13
User Base
  • Major underground mines owned by
  • Anglo Base Metals
  • Barrick
  • BHP Billiton
  • Placer Dome
  • Newmont

14
Countries Where Used
  • Australia
  • Bulgaria
  • Canada
  • China
  • Ireland
  • Portugal
  • Russia
  • South Africa
  • Suriname
  • USA
  • Venezuela
  • Zambia

15
Benefits
  • Easy-to-use interactive Gantt chart interface
    enables new users to develop schedules from day
    one
  • Productivity increases through integration with
    other business software and databases.
  • Increased responsiveness to unplanned events by
    rescheduling with iGantt
  • User-definable reports enable tracking of key
    production targets in either tabular or graphical
    form
  • 3D viewing of schedules for presentation and
    visual validation of schedule practicality