Title: AASHTO Design Subcommittee


1
Accelerating solutions for highway safety,
renewal, reliability, and capacity
  • AASHTO Design Subcommittee
  • Albuquerque, NM
  • July 17, 2008

2
HALLMARKS
  • Short-term
  • Results-oriented
  • Non-traditional areas
  • Quantum leaps, major advances
  • Inter-related projects
  • Emphasis on openness

3
FOUR FOCUS AREAS
4
SHRP 2 Capacity Research
Integrate mobility, economic, environmental, and
community needs into the planning and design of
new highway capacity18 million 8 Projects
5
Decision Points and Decision Makers
Long-Range Corridor Environmental
Design Permitting Planning
Planning Review
MPOs
DOTs

Pricing
Effects of Congestion
Advocacy
Models and Assignments

FHWA
Collaborative
Performance Measures
Effects of Road Management
Habitats Wetlands
Decision Making
Effects of Technology
Elected Officials
Planning and NEPA
Citizens
Economic Impact and Land Use
Resource Agencies
6
Highlights-Capacity
  • Travel Demand Model Partnerships (C10)
    States/MPOs can partner with bidders
  • Workshops on Key Decision Points (C01) need
    folks from the trenches
  • Web-based Performance Measures (C02) project
    finishes in a month
  • Case studies on economic impacts of highway
    expansion (C03) suggestions needed for cases
  • Contributions of operations, technology, design
    (C05) need data sources on arterial flow

7
SHRP 2 Safety Research
  • Understanding Driving Behavior

43.2 Million 11 Projects
8
2 Safety Research Tracks
In-Vehicle Study
Data Collection 2500 Drivers
Data Analysis
Crash Risk
Traffic Roadway Conditions Traffic
Controls Weather Distractions
Countermeasures
Data Collection Vehicles at Intersections
Data Analysis
Crash Risk
Site-Based Study
9
Highlights-Safety
  • Finalize sample design driver and vehicles
    factors (S05)
  • Selection of sites for field study (S07)
  • Urban, rural, suburban
  • Weather, topography, design factors
  • Other data sources
  • Qualified contractors
  • Rodeo to test roadside/roadway data collection
    capabilities (S03/S04)

10
SHRP 2 Reliability Research
  • reduce congestion through incident reduction,
    management, response, and mitigation
  • 18 million 12 projects

11
Reliability
Performance Measures
  • Travel Time Variability
  • Travel time index Average travel time/free-flow
    travel time
  • Planning time index 95th percentile travel time
    index
  • Buffer time time added to trip to arrive within
    a window with acceptable probability
  • Buffer index (mean 95 percentile)/mean

12
Traffic Math 10175 vs. 90 Minutes Clearance
TimeExplaining the Value of 15 Minutes Saved
  • Example
  • I-5 northbound, Fife vicinity
  • Average 8 trucks
  • Two (of four) lanes blocked
  • 600 a.m., typical Wednesday
  • 14 - 18/hour Auto Delay Cost
  • 56/hour Truck Delay Cost
  • Cost savings of clearing 15 minutes faster
    146,000

Source WSDOT
13
Highlights Reliability
  • Project L06 (PB Consult)
  • Workshop on Institutional Barriers to
    Non-Recurring Congestion Management Strategies
  • Project L03 (Cambridge Systematics)
  • Potential Performance Measures and Mitigation
    Strategies for Evaluation
  • L01 (Midwest Research Institute)
  • Identification of Case Studies of Successful
    Integration of N-RC Operations Business Processes

14
SHRP 2 Renewal Research
  • Get in, Get out, Stay out
  • 28.9 million 14 Tracks

15
3 Strategic Objectives with 5 Integrated
Research Tracks for Successful Highway Renewal
16
Integrated approach
17
Integrated Tactic 1
Enable Performance-Based Renewal
  • Rapid Approach
  • Minimum Disruption
  • Long Life

18
Integrated Tactic 2
R16 Railroad-DOT Mitigation Strategies
R01 Locating Characterizing Utilities
R11 Approaches at Corridor/Network Level
Facilitate Project Start-up
R15 Integrating Utility and Transp. Agency
Priorities
  • Minimum Disruption
  • Rapid Approach

R09 Risk Manual for Rapid Renewal
Contracts
R06 High-Speed NDT
R04 Innovative Bridge Designs
19
Integrated Tactic 3
R23. Using Existing In-place Pavement
R04. Innovative Bridge Designs
Accelerate Construction
R02. Geotechnical Solutions
R05. Modular Pavement
  • Rapid Approach
  • Minimum Disruption

R06. High-Speed NDT
R10. Innovative Project Management
R03. Reducing Personnel Fatigue
20
Integrated Tactic 4
R23. Using Existing In-place Pavement
R21. Composite Systems
Reduce Maintenance Frequency
  • Minimum Disruption
  • Extends Life

R19. Durable Bridge Systems
R26. Preservation Approaches
R02. Geotechnical Solutions
R06. High-Speed NDT
21
Integrated Tactic 5
Facilitate Responsive Contracting
  • Rapid Approach
  • Minimum Disruption
  • Long Life

R07. Performance Specs Incentive Spec Warranties
R09. Risk Manual for Renewal Contracts
R04. Innovative Bridge Designs
R10. Innovative Project Management
R03. Reducing Personnel Fatigue
22
Highlights - Renewal
  • Preliminary results
  • Approaches for mitigating impacts of utility
    relocation (R15)
  • Locating underground utilities (R01)
  • Non-destructive testing (R06)
  • Refined research plans for follow on detailed
    development project

23
SHRP 2 Research Related to Design
  • Primarily in 2 focus areas
  • Renewal
  • Reliability
  • Deliverables
  • Design Guidelines
  • Procedures
  • Other tools (data gathering, etc)
  • Training programs
  • Design specifications (bridges)

24

Design Guidelines
L07 Evaluation of Costs and Effectiveness of
Highway Design Features to Improve Travel Time
Reliability 2.5 M
Identify state of reliability-related design
practice. Develop guide book and dissemination
plan
R02 Geotechnical Solutions for Soil Improvements,
Rapid Embankment Construction and Stabilization
of the Pavement Working Platform 3.0M
Develop design guidelines for mechanical and
chemical treatment of base, sub-base and subgrade
layers
Develop design guidelines and criteria for the
use of various options
R23 Using Existing Pavement in Place and
Achieving Long Life 1.0 M
25

Design Procedures
Feasibility study of potential uses. Develop
generic Modular Pavement Design Procedures
R05 Modular Pavement Technology 1.0 M
Procedures for development of composite pavement
systems. Development of design manuals
R21 Composite Pavement Systems 4M
26

Data gathering and such
Report documenting current techniques and
practices, software toolbox, RD plan Future
SHRP2 Projects
R01 Encouraging Innovation in Locating and
Characterizing Underground Utilities 300K (5M)
R06-A NDT to Identity Bridge Deck Deterioration
RFP advertisement July 29
R06-D NDT to identify Delaminations between HMA
Layers
RFP advertisement July 29
R06-E Development of Continuous Deflection Sensors
RFP advertisement July 29
R15-B Utility Conflict Identification and
Solutions
RFP advertisement July 29
27

Training Programs
R15-A Model Curricula and Certification Programs
for Utility Relocation
RFP advertisement July 29
28

Design Specifications
New methods for accelerated bridge design and
construction. AASHTO-formatted LRFD design
specifications
R04 Innovative Bridge Designs for Rapid Renewal
2.0 M
R19-A B Bridges for Service Life beyond 100
years 2M 1M
AASHTO-formatted LRFD design specifications
29
R06. Plan for Developing High-Speed NDT
Procedures for Design Evaluation and
Construction Inspection
  • RFPs to be released on July 29
  • R06-A NDT to identify concrete bridge decks
    deterioration
  • R06-B Evaluating Applications of Field
    Spectroscopy Devices to Fingerprint Commonly Used
    Construction Materials
  • R06-C Using Infrared and High Speed Ground
    Penetrating Radar for Uniformity measurement on
    New HMA Layers
  • R06-D NDT to identify Delimitations between HMA
    Layers
  • R06-E Development of Continuous Deflection
    Sensors
  • R06-F Real-Time smoothness measurements of PCC
    Pavements During Constructions

30
R15. Strategies for Integrating Utility and
Transportation Agency Priorities in Renewal
Projects
RFPs to be released on July 29 R15-A Model
Curriculum and Certification Programs in Utility
Relocation Engineering R15-B Utility Conflict
Identification and Solutions
31
Thank you for listening! http//www.trb.org/shrp