Data Taking Jan 5 11
2
(No Transcript)
3
Integrated Luminosity
4
Weekly Summary
  • Stable data taking with gt90 efficiency much of
    the time
  • Downtimes
  • A Level 2 upgrade rack tripped 3 times during
    data taking Sunday / Monday before the problem
    was identified and repaired (bad sensor)
  • Nothing gt 1hour, but quite a few downtimes of
    20-30min
  • SMT HDI's gone bad
  • Level 3 DAQ SBC's requiring reboots under
    study
  • Silicon Track Trigger commissioning
  • NFS server overloaded Tuesday / Wednesday
  • Made some debugging/monitoring tasks very slow
  • Modified some easily identifiable scripts to
    reduce load, but long term improvements need to
    be implemented
  • Accesses
  • Short controlled access on Friday for CFT and FPD
    on Friday
  • No urgent requests at the moment

5
Store 3130 (Jan6-7)
6
Weekly Summary cont.
  • Losses and vertex position stable and within
    tolerances
  • SMT number of non-functional HDI's fairly
    constant at 117 (12)
  • CFT dead channels constant at 1.5
  • Level 3 tracking has been modified efficiency
    unchanged with 20 increase in processing time
  • Special runs
  • Used end of store studies Wednesday evening to
    collect data with improved L1 track trigger
    equations
  • Forward proton detector
  • 10 pots have been inserted to re-establish
    operation
  • Not yet regularly inserted
  • Expect new luminosity constants January 19th
    will have special presentation then