Thompson Library Renovation Advisory Committee: updates - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

Thompson Library Renovation Advisory Committee: updates

Description:

( Commissioning is a key factor in 'green building' design. ... See the onCampus coverage 'Building on Perfection' (January 24), at http: ... – PowerPoint PPT presentation

Number of Views:15
Avg rating:3.0/5.0
Slides: 10
Provided by: itde103
Category:

less

Transcript and Presenter's Notes

Title: Thompson Library Renovation Advisory Committee: updates


1
Thompson Library Renovation Advisory Committee
updates
  • February 21, 2008

2
Thompson Library project construction updates
schedule
  • This is month 14 of the 27-month construction
    calendar. The project is on schedule and within
    its budget.
  • The goal remains for a April 1, 2008 full
    building enclosure, allowing trades a full
    thirteen months to work on the buildings
    interiors.
  • Occupancy permit date remains at May 1, 2009.
    Punch-list resolution and move-in are slated for
    mid-summer 2009. An opening date cannot yet to
    be set.
  • The projects commissioning agent (BRA, Boston)
    meets quarterly with the contractors.
    (Commissioning is a key factor in green
    building design.)
  • All prime contractors are on this job, with an
    average of 120 workers on site daily.

3
Thompson Library project construction updates
schedule
  • Project fund-raising is at 86 of its goal of 30
    million.
  • The projects Percent for Art Committee is
    appointed and at work on the project, but with no
    recent report.
  • The Libraries fixtures, furnishings equipment
    (FFE) effort has resumed.
  • Focus groups are being arranged for selecting
    furniture for public areas Feb 27, March 5 and
    7, 1130-100 p.m. in The Science Engineering
    Library.
  • Office systems are being specified.
  • Orders will be made in early Summer 2008.
  • The Libraries is updating its draft technology
    plan.
  • The Libraries is making application through
    University channels for the café installation.

4
Thompson Library project construction updates
East Building
  • The east atrium skylight glass has been
    installed.
  • Interior floor-fill work is being specified.
  • Renovation of the interior plaster of the
    historic Grand Reference Hall has begun.
  • The subcontractor for this work is the same firm
    (Pymer Plastering, Inc., Columbus) that did the
    original plaster work in 1912. See the onCampus
    coverage Building on Perfection (January 24),
    at http//oncampus.osu.edu/article.php?id1861

5
Thompson Library project construction updates
Tower
  • The stacks sprinkler system and lighting systems
    are being installed.
  • Seismic bracing is completed.
  • Remaining windows to be installed when all needed
    construction material has been received into the
    building.

6
Thompson Library project construction updates
West Building
  • Construction of the new western addition has made
    expected progress. Each of the structural
    (concrete) floors has been poured and additional
    structure and walls continue.
  • The west atrium truss structure is completed and
    glass is being installed at this time.
  • The western reading room structure is coming to
    completion and the addition of the curtain wall
    structure for glass panel is now underway.
  • The tower crane will continue to be in use into
    March 2008, after which it will be dismantled.

7

CABS Library / Buckeye Village route update
Winter 2008 http//tp.osu.edu/cabs/mapsschedules
/librarybuckeye.shtml
  • Monday-Friday
  • 730 a.m. 1000 p.m.
  • 30-minute service, except during 15-minute
    service peak hours service 730-900 a.m. and
    430 600 p.m.
  • ACK departure at 00 and 30
  • RPAC departure at 15 and 45
  • Saturday 800 a.m. 800 p.m.
  • Sunday 1100 a.m. 1000 p.m.
  • The Ackerman Road resurfacing project is
    completed, and the bus route back to normal.
    Grading completion will take place when weather
    permits.

8
Longs Bookstore (SPAH) update
  • Study Place Along High, the SPAH, at the former
    site of Longs Bookstore
  • Operating hours
  • Monday-Thursday 10 a.m. 1000 p.m.
  • Friday 1000 a.m. 600 p.m.
  • Saturday 1000 a.m. 600 p.m.
  • Sunday 1100 a.m. 1000 p.m.
  • Networked printing is available.

9
Questions and suggestions?
  • boomgaarden.1_at_osu.edu
  • x2-5085
  • branin.1_at_osu.edu
  • X2-4241