- Rwanda, Africa
- Project Overview
- Relay Tips, Tricks,
- Mistakes
3Rwanda Quick Facts
Capital Kigali Population 10 million Area
26,338 sq km (Ohio 116,000 sq km)? Religion
Christianity Economy Farming,
Tourism Languages French, Kinyarwanda, recently
English
4Map of Rwanda
5Project Scope
- Install Groundwater Collection System
- Provide Means of Water Storage
- Pipe Water to Community Orphanage
6Ground Water Collection
World Health Organization Standards
Dig to water source
Construct water collection containment
7Ground Water Collection
Install collection pipes in gravel and rock for
water collection
Cap the containment system to prevent infiltration
8Tank Foundation
Gravel and rock bought and shipped from other
area Gravel and rock placed flush for flat
support surface
9Tank Foundation
Gravel and rock covered with sand and concrete
placed over top for tank support slab
10Pipeline Installation
Water pipeline buried 1 meter below grade
11Pipeline Installation
Tank provides water to a village tap and a tap at
the orphanage
12How We Got Started
- Bridge to Rwanda (Kettering, Ohio)?
- Sister Patricia of Muhororo Parish
- Owns Operates 3 Orphanages (200 kids)?
- Assessment Trip August 2007
13Rusumo Background
- 1 of Sisters Orphanages is in Rusumo, Rwanda
- Orphans from Rwandan Genocide
- Over 60 children
- Frequent droughts impact drinking water, bathing,
livestock, and agricultural needs
14Assessment Trip Work
- Surface waters contaminated
- Clean water source was a trickle for the entire
village - Long Travel Distances to source ( 800 meters)?
- Each child made 4 trips a day to carry water
15Assessment Trip Work
- Surveyed Area
- Simple tool, small Abney Level
- Measure distance and angle
- Created topographic map
- Water Quality Samples
- Liquid gel agar plates
16Assessment Trip Work
17Project Cost
Site Work 2,200 Collection System 420 Cleanout
Box 580 Storage Tank 2,000 Tank
Building 3,800 Taps 200 Travel
Expenses 11,600 Contingency 2,200
Fundraising Goal 23,000
18Fundraising Efforts
Church Donation 8,000 Car Raffle 7,700 Compan
y Grants 7,300 EWB Grants 3,000 Individual
Donations 1,500 Restaurant Events 250 TOTAL
27,750
19Project Implementation
- June / July 2008
- Phases (2 teams over 4 weeks)?
- Purchase materials thru local representative
- Ground water collection systems
- Storage tank foundation
- Place distribution pipes
- Provide connections to 2 taps
- Provide storage tank connections
- Provide protection for storage tank
20Rusumo Orphanage Tapstand
21Engineers Without Borders
THANK YOU
Or as they say in Rusumo MURAKOZE
(mooh-rah-koh-zay)?
www.ewbgcp.org