1(No Transcript)
2Internal arc in switchgear
- Bas Snijders account manager Eaton Holec
2
3Internal arc in switchgear
- Medium Voltage switchgear IEC 62271 compulsory
test - Low Voltage switchgear IEC/TR 1641 not a
compulsory test
3
4(No Transcript)
5Internal arc IEC/TR 1641 LV switchgear
- IEC/TR 1641 is
- NOT a standard
- A guide on the method of testing of
LV-switchgear - Not a compulsory test
- A special test subject to an arrangement between
manufacturer and user
5
6What is the IEC/TR 1641 about
- SAFETY
- The test is an assessment of ability of an
ASSEMBLY to limit the risk of personal injury as
a result of an internal arcing fault - It is not about constructions
6
75 criteria to be assessed
- Doors and covers do not open
- Parts do not fly off
- Arcing does not cause holes that give access to
external parts - Indicators do not ignite
- Equipotential bonding arrangement is still
effective
7
8From IEC/TR 1641 to practice
- Design the switchgear to comply with the
assessment criteria of this guide - Take measures to prevent assessed criteria to
happen in a way that it may injure persons - Design the switchgear in a way that the ignition
wire cannot be connected as indicated - Use insulation, separators and barriers so the
arc cannot be initiated
8
9What else
- Some customer have additional requirements
- An arc in a unit in one compartment may not
affect units in other compartments
9
10(No Transcript)
11(No Transcript)
12Separators so the arc cannot be initiated
- IP20 finger proof
- A test finger cannot enter the enclosure or
pass a - screen to touch the live parts.
-
- IP41 - wire proof and protected against dripping
water - A wire with a 1 mm diameter cannot enter the
- enclosure or pass a screen to touch the live
parts - and the enclosure is protected against ingress
of - dripping water.
- Reference IEC 60529
13Capitole 40 arc free incoming feeders
First barrier Air insulation
Second barrier Phase segregation
14Fully insulated main bus system
First barrier Air insulation
Second barrier Phase insulation
15Vertical busbars fully epoxy insulated
Second barrier Glass fiber re-inforced
busbar segregation.
First barrier Air insulation
Bucket stabs
16Scissor contact connection starter
- Double sided phase segregation
- is accomplished before the main contact
- pins enter the contact cassettes.
17Conclusions
- Capitole 40 ARC-Free assemblies offer the
following benefits - Number of arc fault incidents is minimized
- Loss or damage to gear is reduced to one
compartment - Risk of down time minimized
- PPE may not be needed (or at least a
- lower level can be used)
18Internal arc customer
- Summary of incident
- Motor 132kW had short circuit in the winding
- 400A fuses and thermal overload activated
- Fuses replaced and thermal protection reset
- After turning the loadswitch on, there was a smal
explosion