Commanders Guidebook Appendix C - PowerPoint PPT Presentation

1 / 48
About This Presentation
Title:

Commanders Guidebook Appendix C

Description:

... based on a review of T/M/S cockpit charts and other supporting documentation. ... gaps, the T/M/S shall present the supporting cockpit charts in order to drill ... – PowerPoint PPT presentation

Number of Views:138
Avg rating:3.0/5.0
Slides: 49
Provided by: mikefle
Category:

less

Transcript and Presenter's Notes

Title: Commanders Guidebook Appendix C


1
Commanders Guidebook Appendix C
  • TRW Template...2
  • Current Readiness VTC Template 22
  • MAERB Mini Brief template .. 35
  • NAE Board of directors Briefing Rules of
    Engagement..... 40

2
CH-53DT/M/STRW Brief
SAMPLE
  • TYCOM READINESS WORKSHOP
  • Date
  • Colonel Malavet MAG-24
  • CAPT Muldoon PMA -261

3
Mission Statement/Inventory
  • Support the MAGTF Commander by providing assault
    support transport of combat troops, supplies, and
    equipment, day or night under all weather
    conditions during expeditionary, joint, or
    combined operations.
  • Core Capable Squadron (10 Aircraft)
  • Able to sustain 17 sorties 1.5 hr (or 25.5 hrs a
    day) during contingency/combat operations with
    FMC gt70 with 90 TO (170 Marines-23
    Pilots/20CrewChiefs/14 AOs).
  • 720 hrs per month
  • 3 Tactical Squadrons, 1 MALS (60 USN)
  • 10 aircraft currently deployed to Okinawa.
  • UDP WESTPAC HMH-463 in Jan 08
  • OIF HMH-363 in Aug 08
  • 34 Total Aircraft
  • Source NAVMC DIRECTIVE 3500.89 CH-53 Training
    and Readiness Manual

4 Aircraft SDLM Kimhae, ROC
20 Aircraft MCBH Kanehoe Bay, HI
10 Aircraft Okinawa
4
USMC Top Five
ALERTS
Use callouts to highlight issues
This chart will be populated using ACES
MAINTAINER CORE COMPETENCY
AIRCREW CORE COMPETENCY
FW
AFM
AVDLR
SPI1.07 CPI1.10
FUEL
COST PERFORMANCE
AIRCRAFT LIFE MANAGEMENT
RFT SETS
5
T/M/S CWRIIP SLIDE
Short Term AIPs
RFT Gap Sep07 5.9 A/C
CWRIIP SLIDES WILL BE IN ALL BRIEFS REQUIRES PMA
INPUT
Example Slide
Required Slide
6
Aircrew Training CpC
Chart captures raw Core Skills data
Must add appropriate forecast line to all charts
7
Aircraft Systems CpC
Need further guidance of this template as the top
5 panel chart has changed
Side panels should represent Mission Sets
identified by T/M/S team for RFT Sets
Required Slide
8
CH-53D RFT Gap Analysis
  • Root Causes
  • Flight Line Actual Deficit 4 ACFT
  • Depot WIP 8 ACFT
  • 3 ACFT HMH-362
  • 1 ACFT HMH-363
  • 4 ACFT HMH-463
  • RBA Deficit7.5 ACFT
  • NMC WIP 5 ACFT
  • 1 ACFT HMH-362 0 NMCM/ 1 NMCS
  • 3 ACFT HMH-363 1 NMCM/ 2 NMCS
  • 1 ACFT HMH-463 0 NMCM/ 1 NMCS
  • 6 ACFT MC/NRBA
  • AIPs
  • Flight Line Deficit Examining Depot/UDP
    shipping issues to determine efficient and cost
    effective transport of ACFT. We are constantly
    dealing with the tyrannies of time and distance
    when it comes to the transport of ACFT anywhere
    in the world.
  • RBA Deficit Same as Flight Line Deficit.
  • Mission Systems Deficit None at this time.
  • RFT Gap Projection OIF aircraft build up. UDP
    aircraft broken down for C-5 movement to Okinawa.
    RFT gap will close for Jan and Feb 08 and will
    increase by 5 aircraft during the month of Mar 08
    ISO WTI.
  • Assistance Required None at this time.

9
MSCM CpC
Under development
Required Slide
10
Maintainer Core Competency
Required Slide
11
MAG-24 Cost Charts
CPI 1.20 Plan 6M EV 6.7M Actual 5.5M
Target 6,303 FYTD 5,256
Plan 4.3M FYTD 3.5M
ACES is the authoritative data source
Plan 1.2M FYTD 1.5M
Plan 951Hrs FYTD 1,054 Hrs
FYTD Variance 1.1M
Plan 564K FYTD 550K
12
Focus Areas
  • Marine Top Five
  • ACC- On track, recovering from OIF deployments
  • Maintenance Manning- Sufficient
  • Cost within budget for FY-08
  • RFT SETS- Major impact C-5 Transportation ISO of
    operations.
  • SDLM inductions
  • IMRL
  • Main Rotor Head Dampers
  • Aircrew Life Management- No issues.

13
SDLM Inductions
  • Current CH-53D depot maintenance conducted under
    ASPA/SDLM program.
  • Limited airframes coupled with increased
    utilization and fleet demand makes this program
    inefficient.
  • CH-53D needs to transition to a Depot fixed
    induction date (FID) in order to level load depot
    events across the aircraft inventory to meet RFT
    requirements.
  • No assistance required at this time from TRW.

14
IMRL
  • Squadron IMRL employment will change in FY-11 to
    support 2 X 16 squadrons.
  • Current IMRL supports 2 X 10 and 2X 5 (4 bags)
  • IMRL accounts need to grow to support a 8 4
    4 for 2 squadrons (6 bags).
  • Funding requested, not yet identified.

15
Main Rotor Dampers
  • Main Rotor Head Damper demand higher than
    historical usage resulting in supply shortages.
  • BRT formed and working the issue.
  • All flightline aircraft requisitions filled.
    Supply shelves bare.

16
Summary
  • Current Marine AVPLAN has the CH-53D in the
    inventory through 2017
  • We need to continue to maneuver, shoot, and
    communicate in order to provide viable assault
    support to our customer the infantry.
  • The T/M/S team will focus its efforts to support
    this legacy platform well into the next decade.
  • The T/M/S Summary slide should wrap up the
    story into a bullet list of gaps/issues the
    T/M/S is asking for help with or would like to
    offer to CNAF as solutions to possible fleet-wide
    issues.

17
BACKUP SLIDES
18
T/M/S Team Members
  • MAG 24 CO XXXXXXXX
  • PMA 261 XXXXXXXX
  • PMA 261 APML XXXXXXXX
  • MALS 24 CO XXXXXXXX
  • MALS 24 AMO XXXXXXXX
  • MALS 24 SupO XXXXXXXX
  • MALS 24 Class Desk XXXXXXXX
  • MAG 24 OPSO XXXXXXXX
  • MAG 24 Analyst XXXXXXXX
  • DLA XXXXXXXX
  • NAVICP XXXXXXXX
  • Class Desk (CNAF) XXXXXXXX
  • Class Desk (CNAF) XXXXXXXX
  • FST Rep XXXXXXXX
  • Thomas Group XXXXXXXX
  • APW-51 XXXXXXXX

19
TRW Overview
  • The TRW (as with all NAE briefs) should represent
    a coherent story. Observed gaps in performance
    should be tied to root causes. An effective
    T/M/S team will blend the efforts of the
    Typewing/MAG, PMA, IWST and FRC to identify and
    resolve gaps and issues.
  • The TRW is the first vehicle for
    Type/Model/Series (T/M/S) Team to publicly
    present Key Performance Indicators (KPIs),
    associated documentation, and T/M/S initiatives
    supporting the Naval Aviation Enterprise
    readiness and efficiency goals.
  • The TRW is hosted by the CNAL N01R, N42 and N40.
    In the case of USMC specific TRWs, the host will
    be designated by the Marine Aviation Executive
    Readiness Board (MAERB) lead. USMC TRWs will
    normally precede the MAERB by one to four weeks.
  • The TRW is a metrics-driven working group
    established to conduct specific root cause
    analysis and gap closure planning based on a
    review of T/M/S cockpit charts and other
    supporting documentation.
  • The TRW provides the opportunity to the T/M/S to
    gain valuable feedback and direction from the
    Current Readiness Staff, the Readiness Standards
    Policy (RSP) and Maintenance Supply Chain
    Management (MSCM) Teams for the preparation of
    the Progress Assessment Report (PAR) brief.

Admin Slide
20
TRW Overview
  • The TRW discussion should begin with
    identification of gaps between entitled and
    actual performance in the T/M/S specific KPIs
    (Big Four/Five). After identifying gaps, the
    T/M/S shall present the supporting cockpit charts
    in order to drill down into and describe root
    causes, identify gap closure activity and propose
    barrier escalation. Root cause analysis and gap
    closure activity should focus on four specific
    areas
  • Readiness accomplishment as it applies to
    aircrew, aircrew training and training sorties.
  • Readiness accomplishment as it applies to RFT
    aircraft sets.
  • Readiness accomplishment as it applies to
    maintenance manpower
  • Cost.
  • Aircraft Utilization (USMC)
  • The TRW should be conducted with the following
    goals in mind
  • Identify gaps to overall readiness, training
    readiness, aircraft RFT, maintenance manpower and
    cost entitlements.
  • Present root cause analysis to provide a
    quantifiable link between gaps and the barriers
    to closing those gaps.
  • Rank order and prioritize equipment readiness
    barriers by readiness and cost impact using the
    CWRIIP reporting format.
  • Provide information with regard to T/M/S program
    costs that relate to RFT improvement, i.e. PRE"
    (Program Related Engineering), "PRL" (Program
    Related Logistics), and APN-5, etc.
  • Develop/review action plans for eliminating the
    barriers including cost impact analysis.

Admin Slide
21
TRW Overview
  • The T/M/S should be prepared to ask for
    assistance/coordination with issues that are
    beyond their control or require action on the
    part of the TYCOM, NAVAIR, NAVICP, OPNAV N43, or
    other headquarters activities.
  • Issues raised by the T/M/S will be assigned as
    Actions in Progress (AIP). These issues will
    normally be escalated to the CR CFT.
  • It may not be possible to brief completed root
    cause analysis in every case. If not
  • Develop clear way ahead.
  • Assign responsibilities and timeline.

Admin Slide
22
CH-53DT/M/SCR VTC Brief
SAMPLE
  • TYCOM READINESS WORKSHOP
  • Date
  • Colonel Malavet MAG-24
  • CAPT Muldoon PMA -261

23
Mission Statement/Inventory
  • Support the MAGTF Commander by providing assault
    support transport of combat troops, supplies, and
    equipment, day or night under all weather
    conditions during expeditionary, joint, or
    combined operations.
  • Core Capable Squadron (10 Aircraft)
  • Able to sustain 17 sorties 1.5 hr (or 25.5 hrs a
    day) during contingency/combat operations with
    FMC gt70 with 90 TO (170 Marines-23
    Pilots/20CrewChiefs/14 AOs).
  • 720 hrs per month
  • 3 Tactical Squadrons, 1 MALS (60 USN)
  • 10 aircraft currently deployed to Okinawa.
  • UDP WESTPAC HMH-463 in Jan 08
  • OIF HMH-363 in Aug 08
  • 34 Total Aircraft
  • Source NAVMC DIRECTIVE 3500.89 CH-53 Training
    and Readiness Manual

4 Aircraft SDLM Kimhae, ROC
20 Aircraft MCBH Kanehoe Bay, HI
10 Aircraft Okinawa
24
USMC Top Five
ALERTS
Use callouts to highlight issues
This chart will be populated using ACES
MAINTAINER CORE COMPETENCY
AIRCREW CORE COMPETENCY
FW
AFM
AVDLR
SPI1.07 CPI1.10
FUEL
COST PERFORMANCE
AIRCRAFT LIFE MANAGEMENT
RFT SETS
25
CH-53D RFT Gap Analysis
  • Root Causes
  • Flight Line Actual Deficit 4 ACFT
  • Depot WIP 8 ACFT
  • 3 ACFT HMH-362
  • 1 ACFT HMH-363
  • 4 ACFT HMH-463
  • RBA Deficit7.5 ACFT
  • NMC WIP 5 ACFT
  • 1 ACFT HMH-362 0 NMCM/ 1 NMCS
  • 3 ACFT HMH-363 1 NMCM/ 2 NMCS
  • 1 ACFT HMH-463 0 NMCM/ 1 NMCS
  • 6 ACFT MC/NRBA
  • AIPs
  • Flight Line Deficit Examining Depot/UDP
    shipping issues to determine efficient and cost
    effective transport of ACFT. We are constantly
    dealing with the tyrannies of time and distance
    when it comes to the transport of ACFT anywhere
    in the world.
  • RBA Deficit Same as Flight Line Deficit.
  • Mission Systems Deficit None at this time.
  • RFT Gap Projection OIF aircraft build up. UDP
    aircraft broken down for C-5 movement to Okinawa.
    RFT gap will close for Jan and Feb 08 and will
    increase by 5 aircraft during the month of Mar 08
    ISO WTI.
  • Assistance Required None at this time.

26
T/M/S CWRIIP SLIDE
Short Term AIPs
RFT Gap Sep07 5.9 A/C
CWRIIP SLIDES WILL BE IN ALL BRIEFS REQUIRES PMA
INPUT
Example Slide
Required Slide
27
MAG-24 Cost Charts
CPI 1.20 Plan 6M EV 6.7M Actual 5.5M
Target 6,303 FYTD 5,256
Plan 4.3M FYTD 3.5M
ACES is the authoritative data source
Plan 1.2M FYTD 1.5M
Plan 951Hrs FYTD 1,054 Hrs
FYTD Variance 1.1M
Plan 564K FYTD 550K
28
Focus Areas
  • Marine Top Five
  • ACC- On track, recovering from OIF deployments
  • Maintenance Manning- Sufficient
  • Cost within budget for FY-08
  • RFT SETS- Major impact C-5 Transportation ISO of
    operations.
  • SDLM inductions
  • IMRL
  • Main Rotor Head Dampers
  • Aircrew Life Management- No issues.

29
SDLM Inductions
  • Current CH-53D depot maintenance conducted under
    ASPA/SDLM program.
  • Limited airframes coupled with increased
    utilization and fleet demand makes this program
    inefficient.
  • CH-53D needs to transition to a Depot fixed
    induction date (FID) in order to level load depot
    events across the aircraft inventory to meet RFT
    requirements.
  • No assistance required at this time from TRW.

30
IMRL
  • Squadron IMRL employment will change in FY-11 to
    support 2 X 16 squadrons.
  • Current IMRL supports 2 X 10 and 2X 5 (4 bags)
  • IMRL accounts need to grow to support a 8 4
    4 for 2 squadrons (6 bags).
  • Funding requested, not yet identified.
  • No assistance required at this time from TRW.

31
Main Rotor Dampers
  • Main Rotor Head Damper demand higher than
    historical usage resulting in supply shortages.
  • BRT formed and working the issue.
  • All flightline aircraft requisitions filled.
    Supply shelves bare.
  • No assistance required at this time from TRW.

32
Summary
  • Current Marine AVPLAN has the CH-53D in the
    inventory through 2017
  • We need to continue to maneuver, shoot, and
    communicate in order to provide viable assault
    support to our customer the infantry.
  • The T/M/S team will focus its efforts to support
    this legacy platform well into the next decade.
  • The T/M/S Summary slide should wrap up the
    story into a bullet list of gaps/issues the
    T/M/S is asking for help with or would like to
    offer to CNAF as solutions to possible fleet-wide
    issues.

33
BACKUP SLIDES
34
T/M/S Team Members
  • MAG 24 CO XXXXXXXX
  • PMA 261 XXXXXXXX
  • PMA 261 APML XXXXXXXX
  • MALS 24 CO XXXXXXXX
  • MALS 24 AMO XXXXXXXX
  • MALS 24 SupO XXXXXXXX
  • MALS 24 Class Desk XXXXXXXX
  • MAG 24 OPSO XXXXXXXX
  • MAG 24 Analyst XXXXXXXX
  • DLA XXXXXXXX
  • NAVICP XXXXXXXX
  • Class Desk (CNAF) XXXXXXXX
  • Class Desk (CNAF) XXXXXXXX
  • FST Rep XXXXXXXX
  • Thomas Group XXXXXXXX
  • APW-51 XXXXXXXX

35
USMC EA-6B Issues and Actions
  • Marine Top Five
  • ACC Optempo Focus on PTP req Single-site
    deployment
  • ALERTS L4 centered on select MOS deficiencies
  • Cost Below CPH tgt for FY-08
  • Aircraft Availability Historical RBA No RFT
    based data (awaiting AMSRR re-code)
  • Aircraft Life Management Tracking A/C currently
    designated to meet USMC
    sundown plan

36
T/M/S Monthly Update to MAERB
AIRCREW CORE COMPETENCY
MAINTAINER CORE COMPETENCY
AIRCRAFT LIFE MANAGEMENT
COST
For A/C to meet USMC Sundown Plan
Target CPH 7,592 Actual CPH 5,859 Delta
1,733 Pct 22.83
ECMO ES
Pilot OAS
AIRCRAFT AVAILABILITY
ECMO OAS
Pilot DEFTAC
ECMO DEFTAC
No RFT based data
37
T/M/S Monthly Update to MAERB
AIRCREW CORE COMPETENCY
MAINTAINER CORE COMPETENCY
AIRCRAFT LIFE MANAGEMENT
COST
For A/C to meet USMC Sundown Plan
Target CPH 7,592 Actual CPH 5,859 Delta
1,733 Pct 22.83
Inspectors
AIRCRAFT AVAILABILITY
MATMEP
No RFT based data
38
T/M/S Monthly Update to MAERB
AIRCREW CORE COMPETENCY
MAINTAINER CORE COMPETENCY
AIRCRAFT LIFE MANAGEMENT
COST
For A/C to meet USMC Sundown Plan
Target CPH 7,592 Actual CPH 5,859 Delta
1,733 Pct 22.83
Aircraft WIP (DEPOT/NMC)
AIRCRAFT AVAILABILITY
  • Root Causes
  • Flight Line Deficit
  • 5 PMI-1
  • 1 PMI-3
  • 1 PMI-1 and 1 Block I Mod Completed during
    month.
  • RBA Deficit (6 month Avg)
  • Avionics 3.00, Flt Ctls 1.39, Structures 1.29.
    Landing Gear 1.08, Power Plant Install 1.00, Seat
    Components .94, ECS .72, Lighting .67,
    Inspections .57, Engine .59
  • Mission Systems Deficit TBD

No RFT based data
39
T/M/S CR Actions In Progress
  • Key Briefing Takeaways
  • Issue AMSRR Recode req for RFT based data
    reporting
  • ACC Impact of optempo/RFF/deployment
    cycle/focus on PTP reqs
    Reduce impact by maximizing full sqdn support
    of WTI aircrew participation in
    LFEs when able
  • Way Ahead
  • Apr/May begin RFT based data reporting
  • Joined established BRTs (PMI Ldg Gear)
  • Finalize Common RFT based MESM (Mar)
  • Coordinate with T/M/S as issues surface with RFT
    based data reporting

40
  • BoD VTC Briefing
  • ROE

41
Background
  • Air Boss requested assessment of BoD VTC as forum
    to stimulate more discussion and actions
  • VTC intent unique forum for operators,
    constituents, and stakeholders to engage in
    dialogue with core leadership to address
  • VTC purpose / outcomes

42
BoD VTC Issues
  • Issue 1 The briefers desire to inform and the
    length of briefs provided limit opportunities for
    NAE leadership to influence or shape outcomes of
    discussion
  • Recommendation Provide briefer ROE to reshape
    briefs
  • Issue 2 VTC time is limited. Insufficient
    opportunity to address and influence NAE areas of
    interest.
  • Recommendation Create stable BoD VTC topic
    schedule

43
Issue 1 Briefer ROE
  • Core BoD is audience. Allow sufficient time for
    BoD discussion.
  • Wording must be concise, targeted, and meaningful
  • TMS/PMA briefs should be a maximum of 10-15
    slides. Specific guidelines
  • First and final slide should be labeled Issues
    and Actions
  • Overview of all aircraft inventory and their
    locations
  • TMS or Pipeline Big X
  • TMS CWRIIP
  • Gap analysis/drivers
  • Articulate salient trends for data and gap
    drivers
  • Month-to-month, year-over-year for cycles
  • Verbalize trends as favorable/unfavorable vice
    up/down or /-
  • Clearly state where and when
  • Seeking BoD approval
  • Discussion for issues desired
  • Identifying path forward actions

44
Issue 1 Briefer ROE
  • Issues and Actions slide as lead-off for the
    brief
  • To present a mini-read ahead for the information
    and issues that will be discussed throughout the
    brief (particularly the gap analysis/issues
    section)
  • To provide the audience with advance notice of
    request for assistance
  • Issues and Actions slide as conclusion for the
    brief
  • To present key takeaways (when no action is being
    requested)
  • To present action items when the TMS is asking
    for help or would like to offer to the NAE/CNAF
    solutions to possible fleet-wide issues
  • Action item assignment is recommended by the
    briefer, approved by the BoD
  • Proposed cognizant organizations are routinely a
    CFT or sub-team of a CFT. The intent is to
    remain within the NAE construct
  • Stoplights are not required, but provide a good
    representation of the importance of the issue

45
Issue 1 Briefer ROE
No Action Required Example
Action Required Example
46
Issue 2 BoD Schedule
  • Twelve monthly VTCs 2 hrs each gt 24 hrs per
    year
  • Must maximize this 1.15 of available working
    hours
  • Common every month
  • AIP review, TMS brief and CR CFT brief 50
    minutes of 2 hour block
  • Recognition / Best Practices (every month as
    topics are made known)
  • Notional Schedule

47
Engagement ROE
  • For Flag / General Officer consideration
  • Challenge presentation
  • Ask hard questions
  • Question data particularly where not supported
  • Engage on decision points assign action and
    timeline
  • Direct updates / status reports off drumbeat to
    drive action
  • Specify form of response (e.g., email to N00, BoD
    brief, etc.)
  • Question alignment of effort to strategic plan
  • Offer assistance
  • Reward / acknowledge performance and results
  • Ex Coin, kudos, website recognition, message
    traffic, email follow-up

48
Conclusion
  • Summary
  • Briefer ROE and engagement issues promote
    discussion and actions
  • Stable topic structure allows for other NAE areas
    of concern to be shaped and influenced
  • Provided for discussion
Write a Comment
User Comments (0)
About PowerShow.com