Title: Referendum 2006
1Referendum 2006
2Our Theme
3Enrollment Totals 1996-2011Actual and Projected
Current
2011
1996
2006
4Elementary Schools Growth vs. Capacity
SLE 625CLE 800TES 418OBL
700BME 800 Total
3,343
5Early Childhood Center Growth vs. Capacity
1. Full Day Kindergarten was instituted in fall
2006 2. The Cedar Lane Early Childhood Center
opened fall 2005 3. Capacity numbers are
misleading our program capacity is 528
students/center
6The 2003 Referendum
7Appoquinimink High
Opening Fall 2008
8Alfred G. Waters Middle
Opening Fall 2007 2007-2008 school year AGW
houses grade 9 students2008-2009 beyond AGW
becomes grade 6-8 school
9Cedar Lane Early Childhood Center
Opened Fall 2005
10Louis L. Redding Middle
Rededicated April 2006
11MHS Cavaliers Field
First Home Game Fall 2006
12Talent Development
Robotics
The China Box
13- Capital Improvement Proposal
14New Early Childhood Center
- Shares the same architectural design as the
Cedar Lane Early Childhood Center realizing
cost and time savings - Includes a dedicated playground
15New Elementary School
- 840-student capacity
- Shares the same architectural design as Brick
Mill Elementary realizing cost and time savings
16When will new schools open?
- A number of considerations will factor into the
opening date for our new schools including
sewer/water availability, land/development
costs, roadway systems, population trends, state
funding - We hope to open our new Early Childhood Center
in 2008 - We hope to open our new Elementary School in
2009 - These dates are tentative. Our goal is to open
both new schools as quickly as possible once the
necessary infrastructure is in place.
17Cedar Lane Elementary SchoolRepairs and
Renovation
Boilers have outlived their life expectancy
- Installation of fire sprinkler system
- New water and sewer tie-ins
- New HVAC and boilers
- Computerized systems will improve efficiency and
save money
- Handicap-accessible bathrooms
- Complete roof replacement
- Ceiling and floor tile replacement
- New folding partition to separate gym and
cafeteria
18Silver Lake Elementary SchoolRepairs and
Renovation
Operable partition needed
- Main office will be renovated
- Parent reception
- Nurse
- Counselors
- Secretaries
- Administrators
- Aging (37 years) cafeteria floor will be
replaced - Installation of operable partition separating the
gym/cafeteria - Renovation will enhance student safety, reduce
noise - New drop-off canopy at entrance
19Middletown High School Repair Renovations
- New Animal Science Lab Expansion of the
Construction Trades Shop - We will extend the walls of our current shop
area. - The animal science lab will be located alongside
the shop area, next to the greenhouse in our
vocational trades wing. - Wear and tear issues caused by overuse will be
corrected - Replacement of damaged ceiling tiles missing
signage, newly painted walls, installation of
high-impact wall surface material
20Our Two Middle SchoolsRepairs and Renovation
- Louis L. Redding Middle School
- 54-year old lockers replaced
- Additional lockers added to provide sufficient
capacity - 54-year old locker rooms renovated
- New plumbing, fixtures, tiles
- Parking lot reconfigured for safety
- Everett Meredith Middle School
- Hallway lockers refurbished and additional
lockers added to provide the capacity needed to
serve the entire school.
21Brick Mill Elementary SchoolRenovation
- An additional serving line will be added
- This will increase the speed and efficiency with
which we can serve lunch to our nearly 800
students
22Capital Improvements Security
- Security
- Enhanced security entrances at all facilities
- An electronic buzzer system will be installed at
all buildings.
23Two Worthwhile Projects Will Require Local
Support
- The state received an overwhelming number of
requests for new construction support () this
year. - All districts were asked to make concessions.
- By eliminating two deserving projects from our
original request, Appoquinimink was able to
preserve a strong commitment for funding at eight
school-based projects. - Initially, we thought to eliminate the other two
projects from our referendum. But they represent
unique needs that will only grow more expensive
to address over time, so we have elected to pare
down the projects to a minimum investment and
keep them on the ballot. - Because the projects will require 100 local
funding, they will be offered as a separate item
on the ballot.
24Teacher Training Center ExpansionAdministrative
Offices Relocation
Even the mens room has been re-purposed as
office space
No more room for storage
Not enough space for a full-size chair
25Teacher Training Center ExpansionAdministrative
Offices Relocation
- Instructional space, technology lab, teacher
parking, and storage/receiving/distribution areas
are all insufficient and need to be expanded. - A loading dock will serve as Central Receiving
- To accomplish this, administrative offices will
be moved to an adjacent office building with the
acquisition of the land between the two
buildings - We will purchase pre-existing office space
- This recommendation is supported by a cost study
26Recreational Fields
- Replace one natural grass athletic field at both
Middletown High School and Appoquinimink High
School (2 fields total) with synthetic turf - All-season play will accommodate all teams, all
sports, including Junior Varsity - Surface found to reduce the number and severity
of injuries - New fields will provide access to youth sports
programs - 8-12 year lifespan with little or maintenance or
replacement costs during this time
This represents a 50 reduction in our original
request.
27Cost of Capital Improvements
State Local Partnership 56,142,800
State Share 40,984,100 (73) Local
Support 15,158,700 (27) Additional,
Locally-Supported Ballot Item Local Support
6,243,236
Recreational Fields, Teacher Training Center
Expansion
28 29Current Expense Proposal Energy/Salaries
- Provide for escalating energy costs, as well as
increases in goods and services that have
dramatically impacted the general operating
budget of the school district. - Provide a local increase in salary funding to
ensure that the district can recruit and retain
top teachers and staff. - Salaries are paid by a combination of state and
local funding. The proposed increase will be on
the local side a 3 increase which equates to
approximately 1 overall.
30Current Expense Proposal Program Enhancements
- Related Arts
- Funding for musical instrument replacement
- Expansion of the strings program
- Increase in the library allocation from 2.00
per student to 4.00 (due to state cutbacks in
funding) - May include the purchase of additional steel
drums if interest in the program continues to
grow
31Current Expense Proposal Program Enhancements
- International Education
- World languages (Chinese, Spanish, Japanese
French) will be introduced in our elementary
schools. - All four strategic languages will be available in
our middle schools for formal study. - In high school, all four languages, and German,
are currently offered. - The early exposure will afford students a greater
opportunity of meeting minimum college
requirements for specialization in one language
that is aligned with their career pathway.
32Current Expense Proposal Program Enhancements
- Activity Buses
- After school transportation will allow middle and
high school students to participate in enriching,
extracurricular activities. - Transportation will be provided on a limited
basis at middle schools with more regular service
at the high school level - Examples of extracurricular activities include
band, chorus, drama, sports, clubs, specials, and
more!
33Current Expense Proposal Program Enhancements
- Alternative Education
- The Twilight Program will be restructured to
include a broader selection of courses aimed at
meeting new graduation requirements for students
in this alternative education setting. - Existing core courses will be augmented with
electives as well as courses for the approved
career pathways.
34Current Expense Proposal Program Enhancements
- Technology
- Hardware and software replacement for aging
systems - Phones and teacher voicemail in the classroom
- Enables communication from classrooms in case of
emergency - Enhances school/home communication
35Current Expense Proposal Program Enhancements
- Career Placement Counselors
- College matches for individual students
- Informational searches, college visits and
orientations at selected schools - Advisement for parents and students on the
college preparation process from beginning to
acceptance
36Tax Impact of Referendum
- Capital Construction 9
- General Operating Expenses Program
Enhancements 12 - 21 per 100 assessed value
37How will my taxes be affected?
2007 . . . . 14.03/month 2008 . . . .
1.25/month (15.28) 2009 . . . . 2.84/month
(16.87)
On a home assessed at 80,000 and valued at
240,000
The average home assessment in Appoquinimink is
79,850 per the New Castle County Tax Assessment
Office. More than currently paid
38A Look at Current School Taxes in the Region
School District Estimated Rate per Tax
Bill 100 assessed Appoquinimink
999.52 1.26 Brandywine 1,187.73 1.49 Red
Clay 1,059.21 1.33 Christina
1,328.99 1.67 Colonial 1,038.52 1.31
At the present time, property owners in
Appoquinimink pay lower school taxes than any
other New Castle County comprehensive school
district for a comparably assessed home.
392006 Referendum Election Date
40Our Ballot
Approves two new schools and renovations to
existing schools
Approves two new recreational fields and
expansion of teacher training center/district
office
Approves much-needed program enhancements
41- Who can vote
- Appoquinimink residents (must be U.S. citizen),
18 and older - You do not need to own property or be a
registered voter - You must bring proof of I.D. to the polling place
- Drivers license or State of Delaware I.D. card
- You can vote at any one of the nine polling
locations - If you are unable to go to the polls you may
request an absentee ballot (call the Carvel State
Office Building)
42Your guide to voting
Polling Places Vote at any elementary, middle or
high school between 1200 noon and 900 p.m.
-
- Louis L. Redding Middle
- Everett Meredith Middle
- Middletown High
- District Office
- Brick Mill Elementary
- Cedar Lane Elementary
- Olive B. Loss Elementary
- Silver Lake Elementary
- Townsend Elementary
43Building For Generations
- Would you like to help?
- There are a number of ways you can show your
support lawn signs, calls to friends and other
parents, a letter of support - Please leave your name and number with one of
our presenters or call 376-4101 if youd like
to help us. - Well see you at the polls on December 12!
Thank You!