Seattle Center City Streetcar Workshop - PowerPoint PPT Presentation

1 / 18
About This Presentation
Title:

Seattle Center City Streetcar Workshop

Description:

Evaluation Criteria for Seattle Streetcars NelsonNygaard Consulting Associates ... Office / Convertible Space. Institutional (E.g. Cemetery) Downtown Primary Office ... – PowerPoint PPT presentation

Number of Views:16
Avg rating:3.0/5.0
Slides: 19
Provided by: SLeh4
Category:

less

Transcript and Presenter's Notes

Title: Seattle Center City Streetcar Workshop


1
Seattle Center City Streetcar Workshop
  • July 20, 2007

2
Evaluation Criteria for Seattle Streetcars
3
Transit Plan - Goal
  • Transit every 15 minutes 18 hours a day 7
    days a week

4
Existing and Future Transit
5
Seattle Candidate Streetcar Corridors
  • All UVTN routes are initial candidates for
    streetcar service.
  • Today
  • Criteria Evaluation
  • Mapping Exercise

6
Screening Criteria
  • Grade
  • Street Geometry
  • Physical Barriers
  • Possible Terminal Location
  • Utilities
  • Volume/Capacity Ratio
  • Duplication of Service
  • Transit-Supportive Land Uses
  • Industrial Zoning

7
Grade
  • Grades inhibit streetcar operations
  • 0 to 6 - acceptable
  • 6 to 10 - if all other screening criteria are
    met
  • gt 10 - eliminated

8
Street Geometry
  • Interchanges
  • Turning movements (lt90 unacceptable)
  • Weaving or curvature needs
  • Exclusive right-of-way needs
  • Transit priority needs (bridges, underpasses)
  • Wheel noise

9
Other Physical Barriers
  • Low bridges or skyways
  • gt14 of vertical clearance
  • lt 14 of vertical clearance fatal flaw
  • Narrow streets
  • Lane widths narrower than 10 ft is a fatal flaw
  • At-grade freight railroad crossing
  • Requires difficult approval process fatal flaw

10
Terminal Location
  • Needs reasonable location to terminate and
    connect to other transit
  • No strong connection to transit hub is treated as
    a fatal flaw

11
Utilities
  • Relocation of major utilities (water, storm or
    sanitary) may be too costly
  • gt6 ft from trackway
  • 3-6 ft from trackway
  • lt3 ft from trackway

12
Speed and Reliability
  • Traffic congestion inhibits successful streetcar
  • Corridor or segments with volume/lane ratios
    greater than the average plus one standard
    deviation is treated as a fatal flaw (unless
    exclusive ROW)

13
Duplication of Service
  • Corridors that directly compete for riders with
    existing or programmed LRT service should be
    eliminated.

14
Land Use Types
Low Medium High
Airport General Commercial Small Scale Commercial General
Golf Course Downtown Secondary Office Downtown Edge
Industrial General Office-Residential Medium Density Downtown Entertainment
Industrial Light Mixed Use - Residential Medium Downtown Primary Office
Institutional (E.g. Cemetery) Office / Convertible Space Downtown Retail
Protected Open Space Residential Medium Density Live Work Units
Parks Residential High Density
Water Mixed Use - Residential High
Railway Mixed Use with Retail
Residential Low Density Office- Residential High
Retail Single Story Transit Oriented Use
Trolley Railway
Vehicular Right-of-Way
15
Land Use Types, contd
  • Low transit-supportive land use
  • Residential density lt 10 units/acre
  • Industrial
  • Low-scale commercial development
  • No significant mixed-use development

16
Industrial Zoning
  • Streetcar garage needs to be located on track
    connected to main alignment
  • No industrial zoning within ½ mile of corridor is
    treated as a fatal flaw.

17
Summary
  • Physical Barriers
  • Low bridges or skyways
  • gt14 vertical clearance
  • lt 14 vertical clearance
  • Lane widths narrower than 10 ft
  • At-grade freight railroad crossing
  • Possible Terminal Location
  • No strong connection to transit hub is treated as
    a fatal flaw
  • Grade
  • 0 to 6 - acceptable
  • 6 to 10 - if all other screening criteria are
    met
  • gt 10 - eliminated
  • Street Geometry
  • Interchanges
  • Turning movements (lt90 unacceptable)
  • Weaving or curvature needs
  • Exclusive right-of-way needs
  • Transit priority needs
  • Wheel noise

18
Summary, Contd
  • Duplication of Service
  • Corridors that directly compete for riders with
    existing or programmed LRT
  • Transit-Supportive Land Uses
  • See list
  • Industrial Zoning
  • No industrial zoning within ½ mile of corridor
  • Utilities
  • gt6 ft from trackway
  • 3-6 ft from trackway
  • lt3 ft from trackway
  • Volume/Capacity Ratio
  • Volume/lane ratios greater than the average plus
    one standard deviation