CURENT DREDGING INDUSTRY TECHNOLOGIES PERTAINING TO PIPELINE TRANSPORT

Description:

The System of Principles, Practices, and Procedures Employed by a Discipline ' ... Conveyance Distance. Placement Mode. Bid Competitiveness Dependant On: ... – PowerPoint PPT presentation

Number of Views:86
Avg rating:3.0/5.0
Slides: 37
Provided by: keithl2
Category:

less

Transcript and Presenter's Notes

Title: CURENT DREDGING INDUSTRY TECHNOLOGIES PERTAINING TO PIPELINE TRANSPORT


1
CURENT DREDGING INDUSTRY TECHNOLOGIES PERTAINING
TO PIPELINE TRANSPORT
2
METHODOLOGY
  • The System of Principles, Practices, and
    Procedures Employed by a Discipline

3
WE MEANS THE INDUSTRY
4
BENEFICIAL USESOF DREDGED MATERIAL
  • Coastal Restoration
  • Wetland Creation
  • Barrier Island Restoration
  • Beach Nourishment
  • Bird Island Development
  • Maritime Forest/Chenier Ridge Development
  • Sub-tidal Habitat Enhancement
  • Development
  • Roadway Base Creation
  • Marinas/Residential Communities
  • Industrial Waterside Facilities

5
BENEFICIAL USES PLACEMENT
  • Placement Modes
  • Confined Placement
  • Simi-confined placement
  • Open Water Placement
  • Placement Measures
  • Use of Existing Emergent Land Features
  • Earthen Dikes
  • Rock Enclosures
  • Geotubes
  • Access Channels

6
SOURCES OF MATERIAL IN COASTAL LOUISIANA
  • Dedicated Borrow
  • Mississippi River
  • Offshore - Gulf of Mexico
  • Interior Bay/Lake Bottoms
  • Channel Maintenance Materials

7
DREDGED MATERIALS TYPES
  • Consistency
  • Sand
  • Silt
  • Clay
  • Disposition
  • Virgin Material
  • Maintenance Material
  • Dredge-ability
  • Silts and Clays
  • Unconsolidated Fluff
  • Consolidated True Bottom
  • Sands
  • Loose
  • Hard Packed

8
SEDIMENT HANDLING LOGISTICS
  • Ingress route planning/execution
  • Materials single-handling
  • Direct Pump Via Pipeline
  • Pump Power-Boosters
  • Pipeline Acquisition/Assembly/Maintenance
  • Spread Material as Fill Advances
  • Materials Re-handling
  • Excavation / Stockpile
  • Excavate and Deliver With Large Pipeline
  • Excavate and Deliver With Hoppers
  • Excavate and Deliver With Scows
  • Re-Slurry and Discharge Into Final Area

9
MECHANICAL GRAB
10
HOPPER DREDGES
11
PIPELINE DREDGES
12
PARTS OF THE PIPELINE SYSTEM
  • Suction
  • Pumps
  • Pipeline

13
SUCTION
  • Dustpan
  • Cutter lt 75
  • Open Suction - Deep Digging

14
PUMPS
  • Long Line High PSI
  • Large Discharge Diameter High Horsepower

15
PIPELINE
  • Near the Dredge

16
PIPELINE
  • Fixed
  • Access Canal
  • Install
  • Roll
  • Wear

17
PIPELINE
  • Near The Discharge
  • Flexibility
  • Plastic
  • Spray

18
(No Transcript)
19
(No Transcript)
20
(No Transcript)
21
(No Transcript)
22
PRODUCTION FACTORS
23
GRAIN SIZE
  • 200 Micron Sand 15 fps

24
PIPELINE DIAMETER
  • Psi/Ft of Line
  • Head Loss/Foot of Line Goes Down as Pipeline
    Diameter Increases.
  • 30 Pipe 100
  • 24 Pipe 129
  • 36 Pipe 81
  • Hp/Ft of Line
  • Horsepower/Foot of Line Goes Up as Pipeline
    Diameter Increases.
  • 30 Pipe 100
  • 24 Pipe 64
  • 36 Pipe 144

25
PIPELINE LENGTH
  • For a Fixed Psi, Discharge Distance Varies With
    Pipeline Diameter
  • 30 Pipe 100
  • 24 Pipe 78
  • 36 Pipe 124

26
HORSEPOWER
  • For a Fixed HP, Discharge Distance Varies With
    Pipeline Diameter
  • 30 Pipe 100
  • 24 Pipe 156
  • 36 Pipe 69

27
MATERIAL IN PIPELINE
  • Horsepower Left Over After Pumping Water, Can
    Pump Sand

28
OPERATIONAL FACTORS
  • Face
  • Twice the Size of the Cutter
  • Minimize Dredge Travel
  • Fill
  • Access to Pipeline and Boosters
  • Fuel
  • Repairs
  • Roll Pipe
  • Weather
  • Currents
  • Low Tide

29
(No Transcript)
30
PLAQUEMINES PARRISH POSSIBILITIES
31
(No Transcript)
32
(No Transcript)
33
COST FACTORS
  • Dredge 20,000
  • Boosters 20,000
  • Pipeline Installation Marsh
  • Wear (4 Quadrants) 12 MCY
  • Fill Spread

34
HAUL
  • Dredge
  • Unloader 20,000
  • Pipeline Installation Marsh
  • Transport 30 Miles
  • Fill Spread

35
INDUSTRY PERFORMANCE HISTORY
36
SUMMARY
  • Dredge Type Dependant On
  • Working Conditions
  • Material Type / Dredge-ability
  • Dredging Quantity
  • Conveyance Distance
  • Placement Mode
  • Bid Competitiveness Dependant On
  • Well Defined Existing Conditions
  • Long Lead Times / Contract Durations
  • Clear Measurement Payment Criteria
  • Industry Interest Will Be a Function of Size and
    Frequency of Available Work