1Washington State Department of Transportation
Bridge and Structures Office
LEWIS CLARK BRIDGE NO. 433/1
2LEWIS CLARK BRIDGE NO. 433/1 BRIDGE REHAB
DESIGN WSDOT CONTRACTOR/PRECASTER MAX. J
KUNEY LIFTING OPERATIONS MAMMOET INC. ADT ON
BRIDGE
20,000 TRAFFIC CONSTRAINTS
120 - 8 hr night closures
(930 pm 530 am)
200 -
single lane closures
3Total Length of Bridge - 5476 ft Thru Truss -
2720 ft - 65 precast
panels WA approach Deck Truss - 168 ft -
7 precast panels Oregon approach Deck Truss - 955
ft - 31 precast panels
TOTAL 103 Panel were
36ft wide and varied in length from 25ft to
45ft 46 - Partial width panels were 3ft wide and
varying in lengths from 58ft to 70ft in the WA
approach.
4MAIN SPAN TRUSS EXISTING ROADWAY DECK
5MAIN SPAN TRUSS NEW ROADWAY DECK
6Floorbeam flanges had a 25 loss in section
MAIN SPAN ROADWAY DECK REPLACEMENT
7DECK PANEL PLAN VIEW
8TYPICAL DECK PANEL SECTION
9(No Transcript)
10(No Transcript)
11WASHINGTON APPROACH
12MAIN SPAN
13OREGON APPROACH
14(No Transcript)
15(No Transcript)
16DECK PANEL CONSTRUCTION
17(No Transcript)
18(No Transcript)
19(No Transcript)
20(No Transcript)
21(No Transcript)
22 23(No Transcript)
24TRANSPORT VEHICLE
25(No Transcript)
26(No Transcript)
27video
28(No Transcript)
29WASHINGTON APPROACH
30WASHINGTON APPROACH EXISTING ROADWAY DECK
31WASHINGTON APPROACH WIDENING
32(No Transcript)
33(No Transcript)
34WASHINGTON APPROACH X-BEAM EXTENSION
35(No Transcript)
36(No Transcript)
37WASHINGTON APPROACH WIDENING FINAL STAGE