Title: LEWIS%20


1
Washington State Department of Transportation
Bridge and Structures Office
LEWIS CLARK BRIDGE NO. 433/1
2
LEWIS CLARK BRIDGE NO. 433/1 BRIDGE REHAB
DESIGN WSDOT CONTRACTOR/PRECASTER MAX. J
KUNEY LIFTING OPERATIONS MAMMOET INC. ADT ON
BRIDGE
20,000 TRAFFIC CONSTRAINTS
120 - 8 hr night closures

(930 pm 530 am)
200 -
single lane closures
3
Total Length of Bridge - 5476 ft Thru Truss -
2720 ft - 65 precast
panels WA approach Deck Truss - 168 ft -
7 precast panels Oregon approach Deck Truss - 955
ft - 31 precast panels
TOTAL 103 Panel were
36ft wide and varied in length from 25ft to
45ft 46 - Partial width panels were 3ft wide and
varying in lengths from 58ft to 70ft in the WA
approach.
4
MAIN SPAN TRUSS EXISTING ROADWAY DECK
5
MAIN SPAN TRUSS NEW ROADWAY DECK
6
Floorbeam flanges had a 25 loss in section
MAIN SPAN ROADWAY DECK REPLACEMENT
7
DECK PANEL PLAN VIEW
8
TYPICAL DECK PANEL SECTION
9
(No Transcript)
10
(No Transcript)
11
WASHINGTON APPROACH
12
MAIN SPAN
13
OREGON APPROACH
14
(No Transcript)
15
(No Transcript)
16
DECK PANEL CONSTRUCTION
17
(No Transcript)
18
(No Transcript)
19
(No Transcript)
20
(No Transcript)
21
(No Transcript)
22

23
(No Transcript)
24
TRANSPORT VEHICLE
25
(No Transcript)
26
(No Transcript)
27
video
28
(No Transcript)
29
WASHINGTON APPROACH
30
WASHINGTON APPROACH EXISTING ROADWAY DECK
31
WASHINGTON APPROACH WIDENING
32
(No Transcript)
33
(No Transcript)
34
WASHINGTON APPROACH X-BEAM EXTENSION
35
(No Transcript)
36
(No Transcript)
37
WASHINGTON APPROACH WIDENING FINAL STAGE