HIRLAM - PowerPoint PPT Presentation

About This Presentation
Title:

HIRLAM

Description:

Operational Hirlam : 438x284 grid pts; 31-levels. Nested Hirlam : 222x210 grid pts; 40-levels ... Rotated lat/long 0.15x0.15 grid with 438x284 grid points ... – PowerPoint PPT presentation

Number of Views:18
Avg rating:3.0/5.0
Slides: 21
Provided by: gate86
Category:
Tags: hirlam | grid

less

Transcript and Presenter's Notes

Title: HIRLAM


1
HIRLAM Use of the Hirlam NWP Model at Met
Éireann (Irish Meteorological Service) (James
Hamilton -- Met Éireann)
2
  • COMPUTER SYSTEM and VERSIONS of HIRLAM
  • IBM RS/6000 SP 9-nodes each with 4-CPUs
  • Operational Hirlam 438x284 grid pts 31-levels
  • Nested Hirlam 222x210 grid pts 40-levels
  • LINUX PC Twin Xeon Processors 2.0Ghz
  • Backup Hirlam 218x144 31-levels
  • LINUX PC Twin Xeon Processors 500Mhz
  • Hourly Hirlam 97x98 grid pts 24-levels
  • LINUX Cluster Nine Twin Xenon Processors
    3.2GHz
  • Operational Hirlam Test mode

3
  • OPERATIONAL HIRLAM IBM RS/6000 SP
  • HIRLAM 5.0.1 with 3DVAR
  • 3-Hour assimilation cycle with 48-hour forecasts
    every 6-hours
  • Rotated lat/long 0.15x0.15 grid with 438x284
    grid points
  • Hybrid eta coordinates with 31-levels
  • CBR vertical diffusion scheme Sundqvist
    condensation scheme
  • STRACO cloud scheme Savijarvi radiation scheme
  • Digital filter initialisation
  • Two time-level Semi-Lagrangian semi-implicit
    scheme
  • Use of frame boundaries from ECMWF

4

5
(No Transcript)
6
  • BACKUP HIRLAM LINUX-PC Dual 2.0Ghz CPU
  • HIRLAM 4.3.5 with OI-Analysis
  • 3-Hour assimilation cycle with 48-hour forecasts
    every 6-hours
  • Rotated lat/long 0.30x0.30 grid with 218x144
    grid points
  • Hybrid eta coordinates with 31-levels
  • SAME AREA AS OPERATIONAL HIRLAM

7

8
  • NESTED HIRLAM IBM RS/6000 SP
  • HIRLAM 6.0.0 with 3DVAR
  • 3-Hour assimilation cycle with 24-hour forecasts
    every 6-hours
  • Model runs at intermediate hours 03Z, 09Z,
    15Z, 21Z
  • Rotated lat/long 0.12x0.12 grid with 222x210
    grid points
  • Hybrid eta coordinates with 40-levels
  • Kain-Fritsch/Rasch-Kristjansson
    convection/condensation scheme
  • ISBA surface scheme
  • Output post-processed with MOS

9
(No Transcript)
10
  • HOURLY HIRLAM ... LINUX-PC Dual 500Mhz CPU
  • HIRLAM 4.3 with OI Analysis
  • Hourly assimilation cycle with hourly analysis
    and 3-hour forecast
  • Rotated lat/long 0.15x0.15 grid with 97x98 grid
    points
  • Hybrid eta coordinates with 24-levels
  • Analysis shown on public web-site

11

12
  • OPERATIONAL USES of HIRLAM
  • General Forecasting
  • Forecast guidance out to 48-hours
  • WAM wave model
  • Forecast 10-metre winds used to drive model
  • Roadice Prediction System
  • Forecast parameters are used as first guess for
    human forecaster
  • SATREP
  • Overlay on satellite plots ZAMG SATREP analysis
    scheme

13
RESEARCH ACTIVITIES Better Specification of
B.C.s for NWP models Operational Implementation
of Nested System Regional Climate Analysis
Modelling Prediction Centre Community Climate
Change Consortium for Ireland RCAMPC and C4I
14
(No Transcript)
15
(No Transcript)
16
  • EXPERIMENTS with LINUX CLUSTER
  • Purchased small experimental Linux-Cluster
  • Dell PowerEdge 1750 Twin Xeon nodes rack
    mounted
  • 1 x Master node 2.8GHz, 4Gbytes
  • 9 x Compute nodes 3.2GHz, 2Gbytes
  • Compute nodes in 3x3 2-dimensional torus
    Dolphin cards
  • RedHat ES-3/WS-3 PGI compilers Intel compilers
  • Scali MPI connect, Scali TCP connect, Scali
    Manage
  • Original cluster had 6-nodes upgraded to
    9-nodes

17
  • EXPERIMENTS with LINUX CLUSTER
  • Running Operational Hirlam on Cluster 9-node
  • Hirlam 5.0.1 with 3DVAR identical to
    operational system
  • Forecast takes 62 mins on IBM/SP 71 mins on
    cluster
  • 3DVAR takes 15 mins on IBM/SP 9 mins on cluster
  • Full run takes 77 mins on IBM/SP 80mins on
    cluster
  • Therefore 9-node cluster is as fast as IBM/SP
  • Experience with Cluster Generally Positive

18
  • FUTURE PLANS for CLUSTER .
  • Investigate Use of Intel Compilers and Libraries
  • Should be faster for running Hirlam
  • Use Cluster as test-bed to implement latest
    Hirlam 6.4
  • Use Cluster to prepare benchmark for new
    mainframe
  • Replace Mainframe end of 2006 / start of 2007

19
FUTURE PLANS Investigate Options to Replace
Mainframe in 2006 Get Hirlam 6.4 Running on
Cluster Investigate MOS/Neural-Nets for
Post-Processing Use Hirlam as input to Point
Data-Base
20
Thank You
Write a Comment
User Comments (0)
About PowerShow.com